Wayside Celtic Football Club CLG
Wayside Celtic Renewable Energy Project
Wayside Celtic Football Club CLG needs to upgrade building services at Jackson Park in Dublin, involving the removal of existing domestic hot water tanks and associated equipment, and the installation of a new heat pump domestic hot water system along with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification, warranty of all systems, and disposal of existing equipment. The project has a maximum total value of 50,000 EUR and a duration of 12 months.