National road 555 Nygårdstunnelen - upgrading of tunnels
Statens vegvesen needs works for the upgrading of Nygårdstunnelen in Bergen, Vestland, over 21 months. The project involves replacing and upgrading equipment in and outside the tunnel to meet current safety regulations, including a new ventilation system, lighting installations, extinguishing water, emission and tunnel washing water handling system, signage, emergency stations, cameras, a new technical building, and a new stop section, as well as the demolition of the existing air treatment plant. Award criteria include Tender Sum, Organisation and offered key personnel, and Implementation of the assignment. Qualification requirements include having equity of minimum 50 million NOK, an equity ratio of at least 10%, and an average annual turnover of minimum 120 million NOK in the last three financial years. Suppliers must also provide a list of 5 to 18 relevant contracts executed in the last five years, and be certified in accordance with ISO 14001 (2015) and ISO 9001 (2015).
Om anbudet
- Kontakt navn
- Stine Henstein
- Kontakt telefon
- +47 22073000
- Kontakt e-post
- firmapost@vegvesen.no
- Adresse
- Innspurten 11c, 0663 Oslo
Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at Nygårdstangen. The annual daily traffic is approx. 45,000. The tunnel shall be upgraded in accordance with the tunnel safety regulations and equipment in and outside the tunnel shall be replaced and replaced with new equipment that meets the current requirements. This includes, among other things: • New ventilation system. • New lighting installations with both new lights in the tunnel roof and continuous evacuation lights. • Extinguishing water shall be set up for the fire brigade. New system for handling emissions and tunnel washing water that fulfils emission requirements. • New signage with barriers, lane signal and variable signs. • Emergency stations with fire extinguishers and telephones. • Camera with coverage throughout the entire tunnel, which gives an alarm during events. • New technical building in the tunnel in the existing mountain room. • A new stop section shall be established at the technical building. • Demolition of existing air treatment plant.
Egne vurderingskriterier
Start gratis prøveperiode for å stille egne spørsmål om anbudet og få KI-genererte svar.
Tildelingskriterier
Beskrivelse
See the exception justifications attached to the tender documentation.
Se tildelingskriteriet i TED
Kvalifikasjonskrav
Fant ingen kvalifikasjonskrav i konkurransekunngjøringen.
Tidligere kontraktsvinnere
Start gratis prøveperiode for å se hvem som har vunnet lignende anbud hos denne oppdragsgiveren.
Se hele utlysningen
- Innkjøper
- Statens vegvesen
- Tittel
- National road 555 Nygårdstunnelen - upgrading of tunnels
- Type
- Hovedkode
- Tilleggskoder
- Lokasjon
- Vestland
- Varighet
- 21 måneder