Search
  • Search


Ireland: Tenders/Uisce Éireann/23-023Q-004F National Water Resilience Pipeline Installation & Associated Works Programme
  1. Supplier selection

    Feb 16, 12:00 AMFebruary 16, 2026 12:00 AM
  2. Contract signed

    Apr 17, 12:00 AMApril 17, 2026 12:00 AM
  3. Result notice published

    Jul 21, 6:13 AMJuly 21, 2026 6:13 AM

Brief

23-023Q-004F National Water Resilience Pipeline Installation & Associated Works Programme

Awarded

The competition has ended and a winner has been selected.

Award
Price 40%
Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€309M

Brief

Uisce Éireann has entered into a framework agreement with Mallwood Limited, Healy-Rae Plant Hire Limited, and David Walsh Civil Engineering Limited for the design, supply, testing, and commissioning of water resilience pipeline installation and associated works at selected locations nationally in Ireland. The contract has a maximum total estimated value of 309,000,000 EUR. The award was based on quality (60%) and price (40%).

Anleggs- og infrastrukturbygging

Result

TED
  • David Walsh Civil Engineering Limited
    Winner
  • Healy-Rae Plant Hire Limited
    Winner
  • Mallwood Limited
    Winner
  • Number of tenders received
    16
  • Contract value
    Not stated

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    quality

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Price

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Uisce Éireann

From the notice

  • The Contracting Entity undertook a competition for a framework involving the design, supply, testing, and commissioning of water resilience pipeline installation and associated works at selected locations nationally, under the Contracting Entity's qualification system ref. 23-023 for the provision of Civils Works Contractors to Uisce Éireann.

  • Contact

    tenders@water.ie
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Construction work for water and sewage pipelines
    45231300

Similar active competitions

  • Tooreen Aghamore GWS

    Rørlegger- og sanitærarbeid

    Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2

    Tooreen Aghamore GWS needs water network improvement works in Ireland’s Western Region over 6 months, with a maximum contract value of €500,000. The works comprise replacing and installing water distribution pipelines, consumer water meters and bulk flow meters, including data loggers. The contract will be awarded to the most economically advantageous tender based on quality and price.

    Competition
    Dec 11, 2026(22 days)
    €500,000
  • CBS Westland Row

    Oppføring av bygninger

    23/040 - A Qualification System for the Provision of General Building and Civil Engineering Maintenance and Repair Works to Uisce Éireann

    Uisce Éireann needs general building and civil engineering maintenance and repair works, including emergency and urgent reactive civil engineering repair and maintenance works for drinking water and wastewater networks and ancillary structures, non-reactive civil engineering repair and maintenance works for drinking water and wastewater networks and ancillary structures, non-reactive civil engineering repair and maintenance works and services associated with reservoirs, dams, tanks, pump stations, treatment works and buildings, non-reactive repair and maintenance works and services for general groundworks, including vegetation removal, site clearance works, tree felling and boundary fencing, non-reactive repair and maintenance works associated with permanent and temporary road and other surface reinstatements, and leak detection surveys.

    Qualification system
    May 31, 2044(100+ days)
  • New Inn Group Water Scheme 2

    Rørlegger- og sanitærarbeid

    New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village

    New Inn Group Water Scheme 2 needs water-main construction works in Ireland, with a maximum total contract value of €350,000 and a 2-month duration. The project involves installing approximately 1,860 metres of 200 mm PE100 SDR11 rising water main in New Inn Village and carrying out work on approximately 2 km of the existing 63 mm PE80 SDR11 water main. The scheme supplies potable water to 350 houses, and the work is located in Ireland’s western region.

    Competition
    Nov 18, 2026(0 days)
    €350,000