Construction workuntil juli 2024

Brief

This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, earth electrode as well as finishing.

Groundwork and rental of construction machinery

Result

TED
  • Vökvaþjónusta Kópaskers ehf.
    Winner
  • Number of tenders received
    6
  • Contract value
    ISK 25,169,520

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at RARIK ohf.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Laveste pris

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, earth electrode as well as finishing.

  • Contact

    Úlfar Reyr Ingvarssonulfing@rarik.is
  • Type
    Result
  • Location
    Landsbyggð
  • Main code
    Construction work for electricity power lines
    45231400

Similar active competitions

  • Landsvirkjun

    Plumbing and Sanitary Work

    THT10 Steam Gathering System

    Landsvirkjun is seeking a contractor to build a high-pressure geothermal steam gathering and supply system for the 25 MW Topping Unit at the Þeistareykir Geothermal Power Plant in Iceland. The works include approximately 6 km of DN250–DN900 steel pipelines, pipe supports, valves and associated equipment, welding, insulation, aluminium cladding and earthworks. The contract value and duration are not stated in the notice.

    Competition
    12. jan. 2027(47 days)
  • FMV SA

    Electrical equipment and lighting

    65- und 16- kV Kabelleitungen Einführung der Kabelleitungen in das neue Unterwerk Ernen

    FMV SA benötigt Bauarbeiten zur Einführung von 65- und 16-kV-Kabelleitungen in das neue Unterwerk Ernen im Kanton Wallis. Der konkrete Leistungsumfang richtet sich nach den Ausschreibungsunterlagen; die Zuschlagskriterien beziehen sich auf Qualität.

    Competition
    4. des. 2026(8 days)
  • Orkubú Vestfjarða ohf.

    2026-06 Kvíslatunguvirkjun - Kvíslatunga Hydropower Plant – Civil and Structural Works

    Orkubú Vestfjarða ohf. needs civil and structural works for the Kvíslatunga Hydropower Plant in Iceland’s Westfjords. The project includes access roads and tracks, dams, water diversion and intake structures, excavation, rock support and grouting, installation of approximately 2,950 metres of penstock, construction of the powerhouse and transformer shelter, tailrace works, and associated drainage, piping and earthing systems.

    Competition
    21. jan. 2027(56 days)