Find

  • All tenders

Search results

All tenders
  • RARIK ohf.

    IT operations and support

    Billing and Rating Solution for Rarik ohf.

    RARIK ohf. needs a cloud-hosted electricity billing and rating solution to replace its existing system, serving approximately 50,000 metering points and processing around 50,000 invoices per month. The services include implementation, licensing, support and maintenance; the solution must provide configurable tariffs and charges, automated billing runs, validation and exception handling, audit trails, and documented, standards-based integrations with RARIK’s meter data management, customer management, finance and reporting systems. An optional meter data management solution may also be included. The project is located in Iceland’s Capital Region, and the procurement uses a negotiated procedure with prior competition: interested suppliers first request to participate, with shortlisted candidates invited to tender.

    Competition with qualificationNov 18, 2026
    Dec 21, 2026(25 days)
  • RARIK ohf.

    Construction - Erection, Renovation and Maintenance of Buildings

    Rofahús Hvolsvelli

    RARIK ohf. þarf að láta byggja nýtt rofahús á Hvolsvelli. Verkefnið felur í sér byggingu einangraðs tveggja hæða húss með þjónustuleiðum/uppsetningum í kjallara. Heildarflatarmál hússins er 102,7 m² og hámarkshæð um 7,3 m frá kjallaragólfi.

    CompetitionMay 27, 2026
    Jun 30, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland

    RARIK ohf. needs cable ploughing services for the installation of high-voltage cables and fiber optic ducting over approximately 10 km in Vesturland, Iceland. The project involves installing six single-core 1x240 mm² 36 kV high-voltage cables and three 150 mm² 24 kV high-voltage cables, with six to seven cables simultaneously ploughed and installed in parallel. The works are anticipated to commence on 10 August 2026 and be completed within 10 weeks.

    CompetitionMay 15, 2026
    Jun 19, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26013 CABLE PLOUGHING - STRENGLÖGN - Jökuldalur 2 - Austurland

    RARIK ohf. needs cable ploughing works, including the installation of ground-mounted substations and cable distribution cabinets, from Gauksstaðir to Grund in Jökuldalur, Austurland, Iceland. The works are to be carried out between June 23 and September 30, 2026. High-voltage cables will be delivered at Mjóeyri in Reyðarfjörður, and other materials at the Þverklettar warehouse and/or Eyvindará storage area.

    CompetitionMay 6, 2026
    Jun 8, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26012 - CABLE PLOUGHING - STRENGLÖGN - JÖKULDALUR 1

    RARIK ohf. þarf að láta framkvæma jarðvinnu og uppsetningu á tilheyrandi búnaði fyrir háspennustrengi, aðallega 36 kV þriggja fasa strengi, á svæðinu frá landi Fossvalla upp að Skjöldólfsstöðum II. Verkið felur í sér strengjaplágun og skal því lokið á tímabilinu 23. júní til 30. september 2026.

    CompetitionMay 4, 2026
    Jun 5, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    CABLE PLOUGHING - STRENGLÖGN - Vatnshamrar að Ferjubakka - Vesturland

    RARIK ohf. needs cable ploughing services for two sections, Vatnshamrar to Hvítá and Ferjubakki to Hvítá, in Vesturland, Iceland. The project involves installing 6 high-voltage cables (3 units of 1x300 mm², 36 kV and 3 units of 1x240 mm², 36 kV) in parallel over approximately 6.3 km, along with fiber optic ducts. The work is expected to commence on June 22 and be completed by August 17, 2026.

    CompetitionApr 13, 2026
    May 18, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    RARIK 25014 - CABLE PLOUGHING - STRENGLÖGN - Mjóifjörður Hesteyrarlína

    RARIK ohf. þarf að láta leggja jarðstreng yfir um 2 km frá Selhellu inn í Hesteyri, ásamt uppsetningu á jarðtengdum spennistöðvum. Verkið felur í sér jarðstrengjalögn í grófu, skornu og grýttu landi, með köflum í halla. Verkið skal framkvæmt á tímabilinu 11. maí til 30. júní 2026.

    CompetitionMar 26, 2026
    Apr 30, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26010 - CABLE PLOUGHING - STRENGLÖGN - LAUGARBAKKI - VÍÐIGERÐI

    RARIK ohf. needs cable ploughing services for the installation of a 36 kV high-voltage cable and a 20 mm fibre-optic duct along an approximately 16 km route, with about 2 km requiring trench excavation for four additional cables. The project is located in Iceland and is to be completed by August 31, 2026.

    CompetitionMar 12, 2026
    Apr 16, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26017 - CABLE PLOUGHING - STRENGLÖGN - Kelduhverfi - Sandur - Norðurland

    RARIK ohf. þarf að láta leggja háspennustreng í jörð í Kelduhverfi Fjöll – Sultir, Norðurlandi, í stað núverandi loftlínu, samtals um 6,5 km. Verktíminn er frá 11. maí til 16. júní 2026.

    CompetitionFeb 27, 2026
    Apr 8, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26018 - CABLE PLOUGHING - STRENGLÖGN - Kelduhverfi - Sandur - Norðurland

    RARIK ohf. þarf að láta setja niður um 3 km af háspennustreng til að leysa af hólmi núverandi loftlínu. Verkið felst í jarðvinnu og lagningu á strengjum.

    CompetitionFeb 27, 2026
    Apr 8, 2026(Expired)
  • RARIK ohf.

    Railway and Infrastructure Construction

    26011 - CABLE PLOUGHING - STRENGLÖGN - Vesturdalur - Norðurland

    RARIK ohf. óskar eftir tilboðum í verkefnið JARÐVÍRAVINNA – Vesturdalur – Norðurland, nr. 26011. Verkið felur í sér lagningu á um 21,5 km af háspennustreng og um 1,0 km af lágspennustreng, auk uppsetningar á 10 jarðstæðum spennistöðvum og einni rofastöð.

    CompetitionFeb 24, 2026
    Apr 8, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    26009 - CABLE PLOUGHING - HRÚTAFJÖRÐUR - NORÐURLAND

    RARIK ohf. óskar eftir tilboðum í jarðstrengjavinnu í Hrútafirði á Norðurlandi. Verkefnið felur í sér lagningu á um það bil 6,5 km háspennustreng og um það bil 0,5 km lágspennustreng, auk uppsetningar á 4 jarðstöðvum og einni rofastöð. Áætlaður verktími er frá 26. maí til 19. júní 2026.

    CompetitionFeb 19, 2026
    Mar 27, 2026(Expired)
  • RARIK ohf.

    Railway and Infrastructure Construction

    CABLE PLOUGHING - STRENGLÖGN - LÓN - AUSTURLAND

    RARIK ohf. þarf að láta leggja háspennustrengi í Stafafellsfjöllum og frá Brekku að Aðalbóli í Lóni, Hornafirði, auk strengjalagnar frá Reyðará að Holti. Verkefnið felur í sér lagningu á um 20 km af strengjum, uppsetningu 13 jarðstöðva, 2 háspennutengiskápa og 2 rofahúsa. Verkinu skal lokið á tímabilinu 7. apríl 2026 til 15. júní 2026.

    CompetitionFeb 12, 2026
    Mar 19, 2026(Expired)
  • RARIK ohf.

    Procurement Consulting

    25040 - Gagnvirkt innkaupakerfi - Ráðgjafar

    RARIK ohf. óskar eftir ráðgjöfum til gagnvirks innkaupakerfis fyrir arkitekt-, verkfræði- og skoðunarþjónustu. Þjónustan skal veitt á landsbyggðinni.

    Dynamic purchasing systemDec 12, 2025
    Dec 31, 2033(100+ days)
  • RARIK ohf.

    Construction - Erection, Renovation and Maintenance of Buildings

    25039 - SPENNAHÚS DALVÍK

    RARIK ohf. þarf að láta byggja nýtt spennuhús í Dalvík, staðsett á lóð kaupanda innan Hríshöfða lands. Verkið felur í sér óinnréttað mannvirki sem er hannað til að hýsa tvo spenna, með olíusöfnunarkerfi og röraleiðum í kjallara. Heildarflatarmál byggingarinnar er 174,9 m² og hámarkshæð 10,9 m frá kjallaragólfi.

    CompetitionDec 4, 2025
    Jan 20, 2026(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25018 - CABLE PLOUGHING - FELLSSTRÖND - VESTURLAND

    RARIK ohf. needs cable ploughing services for the Fellsströnd project in West Iceland. The project involves laying approximately 9 km of high-voltage cables (3x50q 24kV), 650m of low-voltage cables, and 1,200m of ground wire, along with soil replacement for 10 ground-mounted substations and 2 distribution cabinets. The project is expected to commence on October 6, 2025, and be completed within 5 weeks.

    CompetitionAug 22, 2025
    Sep 26, 2025(Expired)
  • RARIK ohf.

    Electrical equipment and lighting

    FRAMEWORK AGREEMENT - UNDERGROUND POWER CABLES

    Rarik ohf. requests tenders for the supply of low- and medium voltage underground power cables, in accordance with the technical description provided for in these Tender Documents for a Framework Agreement. a) Single core cable 36kV 1x240q 35q, estimated three-year quantity 400 km b) Single core cable 36kV 1x300q 35q, estimated three-year quantity 200 km c) Three core cable 36kv 3x150q 35q, estimated three-year quantity 50 km

    Framework agreementJul 8, 2025
    Aug 25, 2025(Expired)
  • RARIK ohf.

    IT consulting and strategy

    25037 - PRE-QUALIFICATION PROCESS FOR THE UPGRADE OF THE ERP AND BILLING SYSTEMS FOR RARIK

    The Purchaser has decided to upgrade the current ERP system (Microsoft Axapta Dynamics 2012) to Microsoft Dynamics 365 Finance and Operation (hereinafter referred to as “F&O”). Concurrently, the existing billing system (Mecoms 2012 R2) will be upgraded to Mecoms 365. The scope of the anticipated procurement will include the analysis, implementation, hyper-care, and subsequent services related to these upgrades.

    CompetitionJul 2, 2025
    Sep 19, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25033 - CABLE PLOUGHING - STRENGLÖGN - Holtsvegur - Suðurland

    The project involves the installation of a 3x95q 12 kV cable from the intersection of Gaulverjabæjarvegur and Holtsvegur to the farm Brautartunga. The total estimated cable trench length for this project is approximately 10 km.

    CompetitionJun 16, 2025
    Jul 17, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    CABLE PLOUGHING - STRENGLÖGN - Mjóanes - Suðurland

    The project entails the installation of a 3x50q 12kV cable, running from the Mjóanes farm to and throughout a summerhouse area located in the Miðfell region. The total estimated cable length is approximately 5 kilometers.

    CompetitionJun 2, 2025
    Jul 7, 2025(Expired)
  • RARIK ohf.

    SPENNAHÚS - FLÚÐUM

    The project involves the construction of a new substation for the Purchaser at Flúðir in Hrunamannahreppur Iceland, on the Purchaser's land in Hrafnkelsstaðir. It is an uninsulated building for a total of three substations, with oil sump and pipework in the basement. The size of the building is 233 m2 gross, the highest height is 11.1 m from the basement floor.

    CompetitionMay 21, 2025
    Jun 23, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25019 - CABLE PLOUGHING - STRENGLÖGN - HALLKELSSTAÐAHLÍÐ - VESTURLAND

    The project involves two main tasks: laying cables from Álftavatn to Slitvindastaðir and from Gerðuberg to Hallkelsstaðahlíð, including soil replacement for underground substations. The scope includes approximately 21.8 km of 3x50q 24 kV high-voltage cable, around 1,250 meters of low-voltage cable, and about 1,600 meters of earth wire. The installation of 14 underground substations and one connection cabinet is also planned.

    CompetitionMay 12, 2025
    Jun 13, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25003_CABLE PLOUGHING_STRENGLÖGN_Berufjörður_Austurland

    The project involves laying about 15.4km of high-voltage cables in Berufjörður from Kelduskógar to Melshorn and to Eiríksstaðir in Fossárdalur. Installing six substations and laying low-voltage local loops from them. It is expected that fiber optic pipes will be plowed with high-voltage cables. The project also includes laying a 3x50q high-voltage cable at Karlsstaðir for about 0.67km and installing a substation. And laying a 3x95q high-voltage cable at Urðarteigur for about 2.3km and installing a substation. The project is to begin on June 9 and be completed on August 29, 2025.

    CompetitionApr 15, 2025
    May 20, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25029 - CABLE PLOUGHING - STRENGLÖGN - Fljótshlíð - Suðurland

    The project includes laying a 3x95 12kV cable from Hái-Múli to Fljótsdalur, as well as laying a 3x50q 12kV cable from Hái-Múli to a summer residence below Hái-Múli. The total estimated length of the cable is about 7km. Work shall begin on June 5 and be completed no later than July 2, 2025.

    CompetitionApr 15, 2025
    May 20, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25007 - CABLE PLOUGHING - STRENGLÖGN - Reyðarfjörður Mjóeyri - Austurland

    Laying of two 240q. 12kV cables, possibly together with fiber optic pipes and a street light cable from the urban area of ​​Reyðarfjörður out to the expected RARIK switch house above Mjóeyrar. The quantities on the tender sheet include the estimated fiber optic pipes in unit 150 and not the street light cable. The work shall be carried out from 26 May to 28 August 2025

    CompetitionApr 5, 2025
    May 9, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25005 - CABLE PLOUGHING - STRENGLÖGN - Eiðaþinghá og Skriðdalur - Austurland

    This is a cable laying project of approximately 3km with the installation of two underground substations in Eiðaþinghá and approximately 4.5km with the installation of three underground substations in Skriðdalur. The work shall be carried out between 9th of June and 20th of July 2025.

    CompetitionApr 5, 2025
    May 9, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25017 - CABLE PLOUGHING - STRENGLÖGN - Snæfellsnes

    There are two workplaces, one is cable laying to álmum outside Stykkishólmur and cable laying from Vogaskeið and into Kolgrafafjörður together with soil replacement for underground substations. High-voltage cables are 3x95q 24 kV about 29 km and 3x50q 24 kV about 4.6 km, low-voltage cables about 550m, earth wire about 1.3 km. It is expected that 12 underground substations and 3 junction boxes will be used in this project. It is assumed that the work will start at the beginning 19th of May 2025 and be completed 8 weeks later.

    CompetitionApr 1, 2025
    May 5, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25002 - CABLE PLOUGHING - STRENGLÖGN - Lón endurnýjun - Austurlandi

    The work is from Almannaskarð to Stafafell, approximately 20.7 km of 3x240q 24kV high-voltage cable will be laid along with approximately 11.9 km of 3x50q 24kV high-voltage cable. Total of 19 underground substations and one switchgear will be installed. Low-voltage local cables need to be laid from the underground substations towards the farms, approximately 2 km in total. It is expected that fiber optic cables will be laid along the high-voltage cables from the branch to Stafafellsfjöll and into Eilífsdalur, the pipeline route is approximately 1.6 km. The work is scheduled to begin on Monday, May 12, 2025 and should therefore be completed on Thursday, July 31, 2025.

    CompetitionMar 31, 2025
    May 5, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25012 - CABLE PLOUGHING - STRENGLÖGN - Hafralónsá veiðiheimili

    A 50q 12KV underground cable shall be laid from Hvammur to Tungusel, about 3.5km and then to the expected location of a new fishing lodge, about 4km away, total about 7.5km. The work shall be rendered from May 19th to June 27th 2025. It is planned to put a pipe in the Hafralón River before this work begins and a cable will need to be pulled into the pipe as a part of this project.

    CompetitionMar 27, 2025
    May 2, 2025(Expired)
  • RARIK ohf.

    Electrical Infrastructure and Road Lighting

    25035 - Framework Agreement - Pad mounted transformers - Rammasamningur fyrir jarðspennistöðvar

    Framework Agreement for the purchase of pad mounted transformers. The transformers are placed on top of a concrete foundation outdoors and are to be connected to an 11kV or 19kV underground cable system. It is estimated to purchase around 120 pcs. of 11kV transformers and 100 pcs. of 19kV transformers per year during the contract period.

    Framework agreementFeb 5, 2025
    Apr 22, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25009 - CABLE PLOUGHING - STRENGLÖGN - GÖNGUSKÖRÐ REYKJASTRÖND - NORÐURLAND

    This involves 22km of 12kV cable, which will be laid from Veðramót, along with the installation of 15 substations, as well as about 1km of 1kV local loop cable. The work shall be carried out between June 2 and August 15, 2025.

    CompetitionFeb 2, 2025
    Mar 10, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25008 - CABLE PLOUGHING - STRENGLÖGN - MIÐFJÖRÐUR - HÚNAÞING VESTRA - NORÐURLAND

    This involves a 43.5km long 24kV cable installation from Réttarsel to the valley, along with the installation of 20 earthing stations, 2 switchgear stations and the laying of 2.0km of 1kV local loop cable. The work is to be performed from 2 June to 29 August 2025.

    CompetitionFeb 2, 2025
    Mar 10, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25011 - CABLE PLOUGHING - STRENGLÖGN- BÁRÐARDALUR ÁFANGI 3 - NORÐURLAND

    The work consists of laying a high-voltage cable 12KV. 95q. from Halldórsstaðir to Mýri and laying a high-voltage cable 12KV. 95q. from Lunderbrekka to the existing transmitter at Rauðafell. Low-voltage cables, earth electrodes and earthing substations shall also be laid and completed. The crossing of the Skjálfandafljót River is excluded. This will be done as a separate project and is not part of this tender.

    CompetitionFeb 2, 2025
    Mar 10, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    CABLE PLOUGHING - STRENGLÖGN - Rangárvellir Skógarhlíð Dysnes - Norðurland

    This involves the laying of three high-voltage cables 12KV: 1) 240q from Rangárvellir to a new substation on a level at Lónsbakki (the old Húsasmiðjan) 3.5 km. 2) From Rangárvellir to the line corner in Kræklingarhlíð south of Ásláksstaðir 2 km. 3) From the substation S 555 Ósi to Dysnes 2.1 km. These works are being tendered together but will be considered three projects in the RARIK's work sheet. The work shall be carried out from 12 - 30 May 2025.

    CompetitionFeb 2, 2025
    Mar 10, 2025(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    25001 - CABLE PLOUGHING - STRENGLÖGN - ÁSAR HÚNABYGGÐ – NORÐURLAND

    This project involves a 6.5km long 24kV cable ploughing from Skinnastaðir to Mánafoss, along with the installation of 3 sub stations, 1 switch station and the laying of 0.3km of 1kV local loop cable. The estimated construction period is from 1st to 19th September 2025.

    CompetitionJan 20, 2025
    Feb 24, 2025(Expired)
  • RARIK ohf.

    Electricity and energy management

    Purchaser of electricity due to losses in RARIK's electricity distribution system

    Purchaser of electricity due to losses in RARIK's electricity distribution system

    ResultNov 15, 2024
    Nov 14, 2024(Expired)
  • RARIK ohf.

    Power Supply and Backup Power

    Power Transformers

    RARIK ohf., reg.no. 520269-2669, Dvergshöfði 2, 110 Reykjavík, Iceland, requests tenders for the design, manufacture and supply of the following power transformers in accordance with the Tender Documents: 1) One (1) 20 MVA, 66/33 kV power transformer for substation Flúðir; 2) One (1) Spare 1, 25 MVA, 66/19 kV power transformer; 3) One (1) 25 MVA 66/11 kV power transformer for substation Flúðir; 4) One (1) Spare 2, 25 MVA 66/11 kV power transformer; and 5) One (1) 35/15/20 MVA 66/33/11 kV power transformers for substation Dalvík as specified in the Tender documents.

    ResultNov 15, 2024
    Nov 14, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24014_CABLE PLOUGHING_STRENGLÖGN_Þórshöfn_Hlíð Langanesi_Norðurland

    This is the laying of 14.2 km of high-voltage cable together with the installation of three substations. Also junction boxes, connection holes, earth electrode as well as finishing.

    ResultNov 11, 2024
    Nov 10, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24011 CABLE PLOUGHING - Strenglögn Skriðdalur - Austurland

    Plowing of underground cables from Skriðuseli in Víðivelli and from Þingmúla in Hauga, together with the installation of transformer stations and cabinets. The work will be carried out between June 18 and September 30, 2024.

    ResultNov 11, 2024
    Nov 10, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24010 - CABLE PLOUGHING Suðursveit Austurland

    The work consists of the renewal of three sections of the distribution system in Suðursveit from Smyrlabjargaraarvirkjun to Reynivellir. It is planned to start the work in June and to finish it in August.

    ResultNov 11, 2024
    Nov 10, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    CABLE PLOUGHING - STRENGLÖGN - Bárðardalur - Norðurland

    It is a construction of 20.1 km high voltage cable along with the installation of nine substations. Also junction boxes, connection holes, earth electrode and other things needed for the work as well as finishing. The work will begin on July 10 and shall be completed on August 20

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24013 - CABLE PLOUGHING - STRENGLÖGN - Gunnarsstaðir - Syðra Áland - Norðurland

    This is the laying of 7.2 km of high-voltage cable along with the installation of four substations. Also junction boxes, connection holes, earth electrode and other things that are needed for the work as well as finishing.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24046 CABLE PLOUGHING - STRENGLÖGN - Dalsmynni að Kolbeinsstöðum - Vesturland

    Cable laying from Dalsmynni to the switching station at Kolbeinsstaðir and the branch to Þverá, together with earth exchange for earth transformer stations. High-voltage cables are 3x95q 24 kV about 11.1 km and 3x25q 24 kV about 2.1 km, low-voltage cables about 180 m, ground wire about 500 m or about 13.9 km in total. 4 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 7 weeks later.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24048 - CABLE PLOUGHING - STRENGLÖGN - Mýrar - Vesturland

    There are two workplaces, i.e. cable ploughing from Fíflholti to Akrar and from Melur to Hítardalur along with soil exchange for earth transformer stations. High-voltage cables are 3x25q 24 kV about 28.3 km, low-voltage cables about 960 m, ground wire about 1,200 m or about 30.3 km in total. 11 substations and 1 junction box are expected in these works. It is assumed that the work will start at the beginning of June and will be completed 14 weeks later.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24047 - CABLE PLOUGHING - STRENGLÖGN - Fiskilækur að Höfn - Vesturland

    Cable laying from Fiskilæk to Höfn together with soil replacement for earth transformer stations. High-voltage cable is 3x95q 12 kV about 7.8 km, low-voltage cables about 455 m, ground wire about 500 m or about 8.8 km in total. 5 substations are expected in this project. It is planned to start the work at the beginning of June and to finish it 4 weeks later.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24016 CABLE PLOUGHING STRENGLÖGN Vatnsnes Vestur - Norðurland

    This is a 25km long 24kV cable laying around Vatnsnes west from Hjallholt to Saurbær and Þorgrímsstaðardal, along with the installation of 9 substations and one switch station, laying about 1,200m of 1kV local cable. Estimated work period is July 8 to August 30, 2024.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24025 CABLE PLOUGHING - STRENGLÖGN -Flói - Suðurland

    The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design.

    ResultNov 8, 2024
    Nov 7, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24017 CABLE PLOUGHING STRENGLÖGN Svínadalur vestur

    It is a 33.5km long 12kV cable laying from Hamrakoti to Dalsmyni, together with the installation of 12 ground transformer stations, 1 switching station and the laying of 2.0km of 1kV local nerve cable. The estimated work period is from June 10 to August 2, 2024.

    ResultNov 7, 2024
    Nov 6, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24018 - CABLE PLOUGHING - STRENGLÖG - Gilsbakki að Kalmanstungu

    The work includes cable laying from Gilsbakki to the "Into the Glacier" tourism service at Hvítá, together with soil replacement for transformers. High-voltage cables are 3x25q 24kV about 12.8 km long, low-voltage cables about 360m, ground wire about 1,400m or about 14.6 km in total. 12 substations and 2 junctions boxes are expected in this project. It is assumed that the project will start on 1st July and end on 6th September 2024.

    ResultNov 7, 2024
    Nov 6, 2024(Expired)
  • RARIK ohf.

    Groundwork and rental of construction machinery

    24020 - CABLE PLOUGHING - STRENGLÖGN - Þverárhlíð og Hreðavatn - Vesturland

    The work includes cable laying to the elms in Þverárhlíð and to the elms at Hreðavatn, together with soil replacement for earth transformer stations. High-voltage cable is 3x25q 24 kV about 15.1 km, low-voltage cables about 1,000 m, ground wire about 2,000 m or about 18.1 km in total. 15 substations and 5 junction boxes are expected in this project. It is assumed that the work will start on July 1 and be completed on September 6, 2024.

    ResultNov 7, 2024
    Nov 6, 2024(Expired)