All tenders: Iceland/RARIK ohf./24025 CABLE PLOUGHING - STRENGLÖGN -Flói - Suðurland

24025 CABLE PLOUGHING - STRENGLÖGN -Flói - Suðurland

Awarded

The competition has ended and a winner has been selected.

Deadline
7. nov. 2024Expired
Award
Procedure
OpenSingle stage
Agreement
Construction workuntil sep. 2024

Brief

The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design.

Groundwork and rental of construction machinery

Result

TED
  • Línuborun ehf.
    Winner
  • Number of tenders received
    2
  • Contract value
    ISK 25,971,800

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at RARIK ohf.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Laveste pris

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The work includes cable laying from the substation RARIK in Selfoss. From the substation two cables 3x240q 11kV will be laid, one of these cables will go to the mast at Hvítá above Austurkot. The other goes to Kersholt at the intersection of Suðurlandsvegur and Skeiðavegur with a stop at the switch station at Oddgeirshólavegur. A 3x95q 11kV cable is to be laid in parallel, which is used as a distribution cable, and from it there are several cables according to the design.

  • Contact

    Úlfar Reyr Ingvarssonulfing@rarik.is
  • Type
    Result
  • Location
    Landsbyggð
  • Main code
    Construction work for electricity power lines
    45231400

Similar active competitions

  • Landsvirkjun

    Plumbing and Sanitary Work

    THT10 Steam Gathering System

    Landsvirkjun is seeking a contractor to build a high-pressure geothermal steam gathering and supply system for the 25 MW Topping Unit at the Þeistareykir Geothermal Power Plant in Iceland. The works include approximately 6 km of DN250–DN900 steel pipelines, pipe supports, valves and associated equipment, welding, insulation, aluminium cladding and earthworks. The contract value and duration are not stated in the notice.

    Competition
    12. jan. 2027(47 days)
  • Veitur ohf.

    Civil engineering and infrastructure construction

    Utilities, excavation and surface finishing

    The purchaser requests participants in dynamic purchasing system for Utilities, earthwork, and surface finishing in accordance with the tender documents. The DPS covers projects that include, in whole or in part, work on the following project elements for projects in all utility supply areas of the purchaser, whether it is a project that the purchaser is solely responsible for or in collaboration with other purchasers. 1. Safety measures and work area markings. 2. Extraction of electrical cables in the ground. 3. Installation of pre-insulated heating pipes. 4. Installation of cold water pipes in the ground. 5. Laying of sewer pipes in the ground. 6. Installation of wells and connections to pipes. 7. Surface finishing, loose surfaces, vegetation, roofs or seeding. 8. Surface finish, solid surface, asphalt, concrete or paving. 9. Narrowing and closing of streets and paths. 10. Leakage and pressure tests of pipes. 11. Installation of water and heating supply valves. 12. Testing of utility systems.

    Dynamic purchasing system
    9. april 2028(100+ days)
  • Orkubú Vestfjarða ohf.

    2026-06 Kvíslatunguvirkjun - Kvíslatunga Hydropower Plant – Civil and Structural Works

    Orkubú Vestfjarða ohf. needs civil and structural works for the Kvíslatunga Hydropower Plant in Iceland’s Westfjords. The project includes access roads and tracks, dams, water diversion and intake structures, excavation, rock support and grouting, installation of approximately 2,950 metres of penstock, construction of the powerhouse and transformer shelter, tailrace works, and associated drainage, piping and earthing systems.

    Competition
    21. jan. 2027(56 days)