All tenders: Estonia/Enefit OÜ/4 MW aku energiasalvestussüsteemi ost

4 MW aku energiasalvestussüsteemi ost

Awarded

The competition has ended and a winner has been selected.

Deadline
Feb 4, 2025Expired
Award
Procedure
OpenSingle stage
Agreement
Buying goods

Brief

Hanke mahtu kuulub 4 MW aku energiasalvestussüsteemi ostmine.

Result

TED
  • Enefit AS
    Winner
  • Number of tenders received
    6
  • Contract value
    €2,861,629

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Enefit OÜ

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Vaata hanke alusdokumentidest

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Hanke mahtu kuulub 4 MW aku energiasalvestussüsteemi ostmine.Main features of the procedureAvatud hankemenetlus

  • Contact

    ANDRO VALGENBERGhanked@energia.ee
  • Type
    Result
  • Location
    Põhja-Eesti, Lõuna-Eesti, Lääne-Eesti, Kirde-Eesti, Kesk-Eesti
  • Main code
    Electric accumulators
    31430000

Similar active competitions

  • Teplárna České Budějovice, a.s.

    Electrical Infrastructure and Road Lighting

    Dodávka bateriového úložiště

    Teplárna České Budějovice, a.s. potřebuje v Jihočeském kraji dodat a namontovat bateriové úložiště s maximální celkovou hodnotou 62 milionů Kč. Zakázka zahrnuje dva bateriové kontejnery a dvě trafostanice, elektroinstalaci pro připojení úložiště a řízení jeho technologií pro poskytování podpůrných služeb výkonové rovnováhy sítě. Součástí je také zpracování a posouzení projektové dokumentace pro provádění stavby, dodávka a montáž všech projektovaných komponent a související práce a služby. Nabídky budou hodnoceny výhradně podle ceny; rozhoduje nejnižší nabídková cena bez DPH.

    Competition
    Dec 7, 2026(10 days)
    CZK 62,000,000
  • Slovenské elektrárne, a.s.

    Battery systems and energy storage

    Implementation of Battery Energy Storage System at Čierny Váh

    Slovenské elektrárne, a.s. seeks an EPC contractor to design, permit, supply, install, commission and put into operation a battery energy storage system at Čierny Váh in the Žilinský Region, over approximately 1,234 days. The BESS must provide at least 480 MWh of usable capacity and 120 MW of rated power, connect to the 400 kV substation through a new 400 kV bay, and support frequency reserves, electricity-market services, frequency-response functions and island operation to maintain the pumped-storage plant’s auxiliary supply during loss of its 22 kV connection. The scope includes civil, electrical and mechanical works; battery containers, conversion and control systems, transformers, switchgear and related equipment; integration with existing plant systems; protection, monitoring, communications, fire safety and security; and testing, performance verification, operational training and documentation needed for safe, reliable operation. The contract will be awarded solely on the lowest total price excluding VAT.

    Competition with qualification
    Nov 30, 2026(3 days)
  • Päästeamet

    Electrical equipment and lighting

    Elektrivarustuse ostmine

    Päästeamet vajab elektrivarustuse ostmist ja tarnimist mandri-Eesti asukohtadesse 3-aastase raamlepingu alusel; lepingu maksimaalne kogumaksumus on 1,9 miljonit eurot. Hange hõlmab Kesk-, Kirde-, Lääne-, Lõuna- ja Põhja-Eestit. Pakkumusi hinnatakse üksnes hinna alusel (100%); tarnete täpsem sisu ja muud tingimused on määratletud hankedokumentides.

    Framework agreement
    Nov 30, 2026(3 days)
    €1,900,000