410094-1-02-02 BB2 Turbine - HP Steam Piping
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Apr 24, 2023Expired
- Award
- Technical solution 25% and 2 more
Brief
The Scope of Supply shall comprise a complete high pressure system between the new wood chips fired boiler of 150 MW fuel input that is under construction and a new steam turbine unit that have just been purchased. The Supply includes high pressure piping from boiler to turbine and turbine bypass, drain and vents, etc. as stated in the Special Conditions. The Supply must be engineered, delivered, installed, cleaned, tested, commissioned and documented in accordance with the limits specified and be ready for hand over as stated in the Contract time schedule. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.
Result
- BWES ApSWinner
- 0Number of bids
- Not statedContract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Source
No source found in the documents. Check the weight against the tender documents.
Description
Technical solution
Source
No source found in the documents. Check the weight against the tender documents.
Description
Timeschedule
Source
No source found in the documents. Check the weight against the tender documents.
Description
HSE
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Fjernvarme Fyn Service A/S
From the notice
The Scope of Supply shall comprise a complete high pressure system between the new wood chips fired boiler of 150 MW fuel input that is under construction and a new steam turbine unit that have just been purchased. The Supply includes high pressure piping from boiler to turbine and turbine bypass, drain and vents, etc. as stated in the Special Conditions. The Supply must be engineered, delivered, installed, cleaned, tested, commissioned and documented in accordance with the limits specified and be ready for hand over as stated in the Contract time schedule. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.
Contact
Jette Køhlerjette.koehler@outlook.dk- Result · PrequalificationType
- 44161500Main codeHigh-pressure pipeline