92900.251 Tracks, New railway across West Funen
Awarded
The competition has ended and a winner has been selected.
Jernbane- og infrastrukturbygging
The Danish Road Directorate has awarded Strukton Rail A/S a works contract for track installation on the new railway across Funen, in the Fyn region, with a final value of DKK 149,637,046. The work includes constructing approximately 64 km of track, installing switches and cable trays, maintaining related works until handover to Banedanmark, coordinating railway safety and interfaces, and designing and building lighting at an operating-point access road. The estimated maximum contract value was DKK 310 million, including an incentive pool, and five bids were received.
Result
- Winner
- Strukton Rail A/S
- Number of bids
- 5
- Contract value
- DKK 149,637,046
About the bid
- Contact name
- Janie Winther Ipsen
- Contact phone
- +45 7244 3333
- Contact email
- jwi@vd.dk
- Address
- Carsten Niebuhrs Gade 43, 5. sal, 1577 København V
On the basis of the "Act on the construction of a new railway across West Funen", Act no. 1424 of 17/12/2019, the Danish Road Directorate (Vejdirektoratet) with the project "92900 New railway across West Funen" is constructing a new approx. 35 km long doublerack and electrified railway at 250 km/h over Vestfyn between Odense Vest and Kauslunde, including 33 bridges. The project is part of the Danish Infrastructure Plan 2035. ____________________________________________________________________________________________ 92900.251 Tracks, New line across West Funen includes all construction works for the establishment of approximately 64 km of track by building on ballast from 7 cm below the lower edge of the sleepers; Installation of 4 high-speed switches 1:27.5; Installation of 2 and removal of 4 temporary switches 1:9; Installation and removal of 2 derailers; Installation of 2 switch rail sections at the Odense end 1:26.5; and Installation of approximately 40 km of cable trays. Moreover, maintenance of own works as well as track, slopes, drainage and structures from previous contracts until the transfer of the new track to Banedanmark, as well as handling a leading role in coordination and railway safety for own works and interface contractors. The contract also includes the design and build of: Lighting along the access road to operating points at the transversal in Gribsvad, cf. the document "SAB Stærkstrøm og potential udligning på fri strækning - 92900.251", section 3.5. ____________________________________________________________________________________________ The value in section 2.1.3, is an estimate. The estimated contract value includes the value of an incentive pool, which the contractor has the opportunity to obtain a share of. Requirements for obtaining the incentive pool and rules for the pool are stated in the contract, section 10 Bonus.Main features of the procedureThe procedure is open (In danish: "offentlig udbud")
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
The evaluation of the sub-criterion is set out in the tender document "Bestemmelser om udbud og tilbud (BUT) - 92900.251".
Description
The evaluation of the sub-criterion is set out in the tender document "Bestemmelser om udbud og tilbud (BUT) - 92900.251".
Description
The evaluation of the sub-criterion is set out in the tender document "Bestemmelser om udbud og tilbud (BUT) - 92900.251".
Qualification requirements
Description
The net turnover for the most recent financial year must be at least DKK 100 million.
Documentation Requirement
As documentation of the net turnover, the intended winner of the contract must, prior to award, submit a copy of the annual accounts or an auditor-certified statement of net turnover. For companies that have been established for a shorter period, the information must be submitted for as long a period of the financial year as possible. If the tenderer is a group of economic operators/an association of companies, the information must be provided for each individual company, as the sum of the companies' net turnover must meet the minimum requirement. If the tenderer is a group of economic operators, a power of attorney must be given to a person who is authorized to sign for the group. All participating economic operators are jointly and severally liable for the performance of the contract. If the tenderer relies on the capacity of other entities to meet the minimum requirement for net turnover (e.g. other economic operators/companies or other entities within its own group), the tenderer must demonstrate that it has the necessary resources from these other operators/entities at its disposal. This must be done by providing commitments from these entities in the form of a declaration of joint and several liability. Economic and financial information is not requested for other planned subcontractors, whose economic and financial capacities the tenderer does not rely on in order to meet the minimum requirement.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- The Danish Road Directorate
- Title
- 92900.251 Tracks, New railway across West Funen
- Type
- Main code
- Supplemental codes
- Location
- Fyn
- Estimated value
- DKK 310,000,000.00