Find

  • All tenders
Ireland: Tenders/Iarnród Eireann-Irish Rail/9388 - Multi-Party Framework for Construction supervision and Contract Administration services for PMP Phases 6 and 7

9388 - Multi-Party Framework for Construction supervision and Contract Administration services for PMP Phases 6 and 7

Awarded

The competition has ended and a winner has been selected.

Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€250Mover 8 years

Brief

Iarnród Eireann-Irish Rail has entered into a multi-party framework agreement with AtkinsRéalis_10323, Tetra Tech Ireland Limited, Roughan and O'Donovan _20818, and Egis Engineering Ireland Limited (formerly known as JB Barry and Partners Limited) for the delivery of construction supervision and contract administration services for phases 6 and 7 of the PMP (Project Management Procedures) in Dublin. The agreement has a duration of 8 years and a maximum total contract value of 250,000,000 EUR. Eight bids were received for this contract.

Byggeteknisk konsulentvirksomhet

Result

TED
  • AtkinsRéalis_10323
    Winner
  • Egis Engineering Ireland Limited (formerly known as JB Barry and Partners Limited)
    Winner
  • Roughan and O'Donovan_3051
    Winner
  • Tetra Tech Ireland Limited
    Winner
  • Number of tenders received
    8
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • This is a call to competition by IÉ for the procurement of Construction supervision and Contract Administration services for phases 6 and 7 of the PMP (Project Management Procedures) (the “Contract) IÉ proposes to establish a multi-party framework comprising of a maximum of four multi-disciplinary consultants (MDCs), to provide advisory services across Phases 6 and 7 of the project lifecycle as per the PMP. Iarnród Éireann Capital Investments (CI) Project Management Procedures Standard (PMP-001), provides a high-level overview of the project phases, deliverables, project hold points and gateway review process required for the development, management, and delivery of projects within CI. The Project Management Procedures (PMP) are to be applied to all CI projects.

  • Contact

    TBC@irishrail.ie
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Advisory and consultative engineering services
    71318000
  • 71322000Engineering design services for the construction of civil engineering works71541000Construction project management services73000000Research and development services and related consultancy services73200000Research and development consultancy services79411000General management consultancy services79421200Project-design services other than for construction work

Similar active competitions

  • The Land Development Agency

    Anleggs- og infrastrukturbygging

    Multi-Party Framework Agreement for the Provision of Technical Construction Quality Assurance and Quality Control (QAQC) Services (Pro450)

    The Land Development Agency needs technical construction quality assurance and quality control (QA/QC) monitoring services for residential units at different stages of development across Dublin, through a multi-party framework agreement lasting 4 years, with a maximum total value of €50 million. The services will support quality monitoring across the Agency’s residential development portfolio.

    Framework agreement
    Dec 15, 2026(23 days)
    €50,000,000
  • Iarnród Eireann-Irish Rail

    Tekniske kontrolltjenester

    9146 Qualification System for Railway Bridge Assessment

    Iarnród Eireann-Irish Rail needs engineering consulting services for railway bridge assessments at various locations throughout the IE Rail Network in Ireland. The services involve regular monitoring and analysis of approximately 3000 railway bridges to ensure safety and reliability, assess structural performance for heavier loads, and advise on route clearances for rolling stock. The contract duration is 7 years. The buyer intends to issue a multi-party, multi-lot Framework Agreement from this Qualification System to qualified companies in the future.

    Qualification system
    Jan 28, 2031(100+ days)
  • Iarnród Eireann-Irish Rail

    Rådgivende ingeniørtjenester for bygg og anlegg

    9301 Qualification System for Professional Services

    Iarnród Eireann-Irish Rail needs professional services to support current and future projects and business objectives. This qualification system is for strategic/expert advisory services, professional services secondments, delivery of project management phases, advice on planning and statutory processes, and development of alternative project implementation options.

    Qualification system
    Mar 1, 2031(100+ days)