9548 Wicklow Station BEMU Charging Infrastructure System Project

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Apr 29,Expired
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€20Mover 30 months

Brief

Iarnród Eireann-Irish Rail needs design and build services for the Battery Electric Multiple Unit (BEMU) Charging Infrastructure System Project at Wicklow Station, County Wicklow, Ireland, over 30 months, with a maximum total value of 20,000,000 EUR. This project is crucial for the deployment of BEMU trains on the Southern Line, enabling them to operate between Greystones and Wicklow by providing necessary charging facilities. The initiative supports sustainable travel, addresses increasing passenger demand, and aligns with national decarbonisation goals as part of the Greater Dublin Area Transport Strategy.

Grunnarbeid og anleggsvirksomhet

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • This is a call for competition by Iarnród Éireann – Irish Rail (“IÉ”) seeking suitably qualified candidates to participate in the tender competition for the design and build of the Battery Electric Multiple Unit (BEMU) Charging Infrastructure System Project (the “BEMU Project”). The Project will provide battery train charging infrastructure at Wicklow Station, County Wicklow in Ireland (“BEMU Charging Infrastructure System Project”)(Reference: 9548). The BEMU Charging Infrastructure System Project forms a part of the Wicklow Rail Capacity Enhancement Project (the “WCE Project”) which is a strategic initiative led by IÉ to improve rail connectivity between Dublin City Centre and Wicklow Town. It supports sustainable travel, addresses increasing passenger demand, and aligns with national decarbonisation goals. The project is part of the National Transport Authority’s Greater Dublin Area Transport Strategy 2022–2042, specifically under Measure RAIL3 – DART Extension. The preferred operational model to deliver on the WCE objectives involves deploying BEMUs to provide one train per hour per direction between Dublin and Wicklow. IÉ has already made the first order of BEMU trains which are expected to enter into service during [2026]. For BEMUs to operate successfully, charging facilities are required to recharge the batteries. Following development of new facilities at Drogheda Station, IÉ has identified the Southern Line as the next phase for the expansion of the BEMU deployment, with Wicklow Station as the preferred charging station location. The BEMU trains will utilise the existing overhead line equipment north of Greystones and run-on battery power between Greystones and Wicklow, where they will be charged.

  • Contact

    adam.ryan@irishrail.ie
  • Type
    Competition · Prequalification
  • Main code
    Railway construction works
    45234100
  • 34630000Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment34632300Electrical installations for railways45200000Works for complete or part construction and civil engineering work45213320Construction work for buildings relating to railway transport45213321Railway station construction work45220000Engineering works and construction works45230000Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork45234000Construction work for railways and cable transport systems45234110Intercity railway works71311230Railway engineering services

Similar active competitions

  • Iarnród Eireann-Irish Rail

    Anleggs- og infrastrukturbygging

    9843 Design and Build Capacity Enhancement Works at Connolly Station

    Iarnród Éireann-Irish Rail seeks an experienced design-and-build contractor for 42 months to complete capacity-enhancement and transformation works at Connolly Station in Dublin, with a maximum total contract value of €34 million. The project includes a new Preston Street entrance and passenger concourse in the historic Victorian undercroft; lifts, escalators and stairs serving Platforms 5, 6 and 7; emergency escape routes, public-realm improvements, retail and operational spaces, heritage refurbishment, structural alterations, and station and railway systems. The contractor must develop the reference design to Approved for Construction status, then construct, test, commission and hand over the works, acting as Project Supervisor for the Construction Stage. Delivery will take place in a live railway environment and requires management of passenger flows, railway access, phasing, safety assurance, stakeholder and heritage requirements, and interfaces with other DART+ contracts. The anticipated contract is NEC4 Engineering and Construction Contract Option C, a target contract with activity schedule.

    Competition with qualification
    Nov 26, 2026(4 days)
    €34,000,000
  • Iarnród Eireann-Irish Rail

    Grunnarbeid og anleggsvirksomhet

    8816 QS Large Civil Engineering Works - Lots 1-3 (€5M to €10M, €10M to €20M and €20M to €50M)

    This is a call to competition by Iarnród Éireann to establish a multi-party Qualification System with three lots for large Civil Engineering Works associated with the upgrading of the railway infrastructure or Rosslare Europort and other related works that Iarnród Éireann may undertake directly or on behalf of Bus Eireann, Dublin Bus or CIE on their properties. Iarnród Éireann, also known as Irish Rail, operates Ireland's national railway network. Iarnród Éireann was founded in 1987, as a subsidiary of Córas Iompair Éireann (CIÉ). Iarnród Éireann operates all internal InterCity, Commuter, DART, and freight train services in the Republic of Ireland, as well as the Enterprise service between Dublin and Belfast, in collaboration with Northern Ireland Railways. In addition to its railway services, Iarnród Éireann also oversees the operation of Rosslare Europort, which serves as a significant ferry port connecting Ireland with destinations in the United Kingdom and mainland Europe. The extent and details of these works will vary from location to location. All project works shall be tendered to those companies, depending on the selected lot, approved for inclusion on this Qualification System under the chosen lot. Companies may apply for one or multiple lots and can apply for inclusion at any stage of the Qualification System’s duration. An individual PQQ application must be submitted for each lot CLOSING DATE FOR RETURN OF INITIAL COMPLETED QUESTIONNAIRE: 12 noon on 22.05.2024 but new applicants may apply for inclusion at any stage during the lifetime of this QS. Lot 1: Contracts with an estimate value of between €5M and €10M (excl. VAT) Lot 2: Contracts with an estimate value of between €10M and €20M (excl. VAT) Lot 3: Contracts with an estimate value of between €20M and €50M (excl. VAT)

    Qualification system
    May 7, 2028(100+ days)
  • Transport Infrastructure Ireland (TII)

    Grunnarbeid og anleggsvirksomhet

    TII499 Luas Finglas Main Infrastructure Design and Construction Works

    Transport Infrastructure Ireland (TII) needs a contractor to design and build the Luas Finglas main infrastructure works in Dublin under a 54-month NEC4 Engineering and Construction Contract, Option C, with a maximum total value of €250 million. The project will extend the Luas Green Line by 4 km, including four new stops, track and rail systems, a 350-space Park and Ride facility, bridges, stabling works, utility diversions, road and junction changes, walking and cycling facilities, and upgrades to the urban realm. The contractor will also manage systems integration, coordinate with other work packages and stakeholders, and carry out testing and commissioning. Works include delivery in live traffic conditions on busy Dublin radial routes.

    Competition with qualification
    Dec 14, 2026(22 days)
    €250,000,000