TII499 Luas Finglas Main Infrastructure Design and Construction Works
Grunnarbeid og anleggsvirksomhet
Transport Infrastructure Ireland (TII) needs design and construction services for the Luas Finglas Main Infrastructure, a 4 km extension of the Luas Green Line in Dublin, over 54 months, with a maximum total value of 250,000,000 EUR. The project involves site clearance, track laying, construction of four new Luas stops, a 350-space Park and Ride facility, bridges, utility realignments, road modifications, pedestrian and cycling facilities, traffic signalling, landscaping, and the installation of the Overhead Catenary System (OCS), power and systems infrastructure, and rail signalling. The successful contractor will also be responsible for overall systems integration, interfacing with other works packages and stakeholders, and testing and commissioning.
About the bid
- Contact phone
- 00 353 1 6463600
- Contact email
- Paul.Farrelly@tii.ie
- Address
- Parkgate Business Centre, Parkgate Street, D08 DK10 Dublin
Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Transport Infrastructure Ireland (TII)
- Title
- TII499 Luas Finglas Main Infrastructure Design and Construction Works
- Type
- Main code
- Supplemental codes
- Location
- Dublin
- Estimated value
- €250,000,000.00
- Duration
- 54 months