Ireland: Tenders/Iarnród Eireann-Irish Rail/9962 - Connolly Station Fuel Pipeline Replacement
  1. Questions deadline

    Jan 13, 11:00 AMJanuary 13, 2026 11:00 AM
  2. Tender submission deadline

    Jan 20, 11:00 AMJanuary 20, 2026 11:00 AM
  3. Tender validity period

    Apr 20, 10:00 AMApril 20, 2026 10:00 AM
  4. Result notice published

    Oct 23, 8:19 AMOctober 23, 2026 8:19 AM

Brief

9962 - Connolly Station Fuel Pipeline Replacement

Awarded

The competition has ended and a winner has been selected.

Procedure
Without prior noticeTwo stages
Agreement
Buying goods
Estimated value
€243.4K

Brief

Iarnród Éireann–Irish Rail has awarded Pumps and Fuels Installations NI Limited a €243,441 contract to replace approximately 950 metres of the diesel fuel distribution pipeline at Connolly Station in Dublin. The works will install a modern double-walled system with continuous leak detection, shut-off valves, improved inspection and maintenance access, and enhanced environmental protection. Two bids were received.

Lastebiler og transportkjøretøy

Result

TED
  • pumps and fuels installations NI limited
    Winner
  • Number of tenders received
    2
  • Contract value
    €243,441

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Iarnród Eireann-Irish Rail

From the notice

  • Iarnród Éireann intends to replace the existing diesel fuel distribution pipework associated with the train fuelling system in Connolly Station. Approximately 200 metres of the pipeline connection from the fuel farm to the arches underneath have recently been replaced with a double-walled pipe with leak detection. The purpose of this project is to replace the remaining pipeline network, approximately 950 metres with a modern double walled fuel distribution system incorporating continuous leak detection, shut off valves, improved accessibility for inspection and maintenance, and enhanced environmental protection in accordance with current industry standards and best practice.

  • Contact

    As per tender packjonathan.bayley@irishrail.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Fuel-tanker trucks
    34133110
  • 42122180Fuel pumps42124211Parts of fuel pumps63712600Vehicle refuelling services

Similar active competitions

  • Iarnród Eireann-Irish Rail

    10105 - FUEL TANK INSPECTIONS

    Iarnród Éireann-Irish Rail needs inspection, assessment, cleaning, refurbishment and recommissioning works for four operational bulk diesel storage tanks at Inchicore Works and Alexandra Road Depot in Dublin. The tanks support critical fuel storage for railway operations and maintenance. The contract is for 5 years, with a maximum total value of €200,000.

    Competition with qualification
    Dec 4, 2026(21 days)
    €200,000
  • Iarnród Eireann-Irish Rail

    Anleggs- og infrastrukturbygging

    9843 Design and Build Capacity Enhancement Works at Connolly Station

    Iarnród Eireann-Irish Rail needs a Design and Build Contractor for capacity enhancement and transformation works at Connolly Station in Dublin, with a maximum total value of 34,000,000 EUR over 42 months. The project involves creating a new entrance from Preston Street, a passenger concourse within the historic Victorian undercroft, new lifts, escalators, and staircases for improved access to Platforms 5, 6, and 7. The works also include emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations, and the installation or modification of station and railway systems. The contractor will be responsible for reviewing and developing the reference design, detailed design, construction, testing, commissioning, and providing as-built and handover information, all within a constrained, live operational railway environment. The appointed contractor will act as Project Supervisor for the Construction Stage, and the contract is anticipated to be NEC4 Engineering and Construction Contract, Option C.

    Competition with qualification
    Nov 20, 2026(7 days)
    €34,000,000
  • Iarnród Eireann-Irish Rail

    Lastebiler og transportkjøretøy

    8906 - QS for Fueling Facilities and Equipment

    Iarnród Éireann seek to establish a Qualification System for the Supply and Installation of Fueling Facilities and Equipment nationwide. It is anticipated that the following list of works and equipment will be required over the lift of the Qualification System, however Iarnród Éireann will rely on this process for other fuelling facilities and equipment which may be required. Supply and installation of: • Diesel Dispensers • Adblue Dispensers • Coolant Dispensers • Dispensing Accessories • Fuel Tanks • Storage Tanks • Hose management systems • Fuel and Discharge hoses • Hose cabinets • Design and civil works associated with above

    Qualification system