Search

  • Search


    Accelerator Control System Engineering Support

    FAIR - Facility for Antiproton and Ion Research in Europe GmbH

    Accelerator Control System Engineering Support

    1. Contract signed

      29. juni kl. 00:0029. juni 2026 kl. 00:00
    2. Result notice published

      15. juli kl. 07:3015. juli 2026 kl. 07:30

    Brief

    Germany: Tenders/FAIR - Facility for Antiproton and Ion Research in Europe GmbH/Accelerator Control System Engineering Support

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Industrimaskiner

    FAIR - Facility for Antiproton and Ion Research in Europe GmbH has entered into an agreement with Cosylab for the development, production, and delivery of specialized electronic software and some hardware for the control, data acquisition, and monitoring of accelerators, including full software integration into the FAIR accelerator control system, and upgrades to existing operational systems. The services are to be delivered in Darmstadt, Kreisfreie Stadt, Germany, over a period of 24 months, with a final contract value of 3,483,625 €. Specific requirements included demonstrating full coverage of all physical and logical interfaces, describing the technical concept in detail, outlining coordination methods for interaction and collaboration, and providing resources with understanding of accelerator physics, mathematical calculation methods (SVD), FPGA programming skills, and technical understanding of accelerator components. Two bids were received for this contract.

    Result

    Winner
    Cosylab
    Number of bids
    2
    Contract value
    €3,483,625

    About the bid

      Development, production and delivery of specialised electronic software and few hardware for the control, data acquisition and monitoring of the accelerators. All these components need full software integration into the FAIR accelerator control system. Further, the services include upgrade of already existing operational systems. The services are expected to be delivered within a period of 24 months. For the construction of the first facility section of FAIR, special hardware and electronic components are required on the one hand, as well as support services for software integration into the accelerator's control system and beam diagnostic system. The hardware and software integration serves to ensure compatibility with the very complex and specific control system standards of the FAIR accelerator and is a main component of the scope of delivery. This includes the extension or development of so-called FESA classes with integrated LSA data supply by the accelerator control system as well as the connection to the campus-wide timing system based on a white-rabbit real-time network. In this context, special electronic and mechanical components are to be supplied, as well as programming and support services

      Contact phone
      +49 6159 712034
      Contact email
      sg227@gsi.de
      Address
      Planckstr. 1, 64291 Darmstadt

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Consideration of the price through the valuation method "Preis-Quotient-Methode"

    • Description

      Great care has to be taken that all proposed deliveries, i.e. devices and services, match exactly to the requirements as given in the technical specifications. Full coverage of all physical and logical interfaces has to be clearly demonstrated by the provider. Bidders have to describe their technical concept in such detail that it becomes doubtlessly demonstrated how the proposed solution will contribute to the fulfillment of the specification. It must also be described how the execution of joint development work for software, interfaces and integration is intended. It should be recognizable how many and which resources are provided for the real-ization of the project. Especially emphasized should be, a) if the proposed hardware solution passes the requirements for long term op-eration (10 month per year over 15-20 years lifetime). b) if good coordination methods apply for the interaction and collaboration be-tween the system core maintainers of the accelerator control system and beam instrumentation software application specialists c) the availability and planned use of resources with understanding of the under-lying accelerator physics, mathematical calculation methods (SVD, single value decomposition) and FPGA programming skills. d) the availability and planned use of resources with good technical understand-ing of the mode of operation of accelerator components and their technical char-acteristics, e.g., linear accelerator RF systems, pulsed power systems, ion source components, etc. The required documents are evaluated in terms of their level of detail, com-pleteness, comprehensiveness and relevance. A presentation that is well-written, coherent, and well-founded, and that reveals a concept that suggests good and efficient task performance, will be evaluated positively.

    • Description

      The quality assurance measures in general and the testing processes in the spe-cific production sequence are to be described. This also includes the description of early error detection mechanisms, as well as the recording of the specifications in the production process. It should become apparent how the measures con-tribute to the fulfillment of the specifications and how the technical characteris-tics are controlled and recorded. Besides completeness and level of detail it will be evaluated whether the de-scribed QA methods can detect errors at an early stage, limit them and elimi-nate them efficiently. The planned documentation of the tests is also included in the evaluation.

    • Description

      Bidders shall submit their own delivery schedule with reference to the targeted contract period and with statements on the deliverability of the required work packages and components. It is particularly important to the client that the bidder specifies a reliable production and delivery time that is comprehensible to the client. A detailed description of the project planning will be evaluated positive-ly. The completeness and plausibility of the information provided will be evalu-ated.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    FAIR - Facility for Antiproton and Ion Research in Europe GmbH
    Title
    Accelerator Control System Engineering Support
    Type
    ResultPrequalification
    Main code
    42961000Command and control system
    Supplemental codes
    30232700Central controlling unit31712110Electronic integrated circuits and microassemblies38424000Measuring and control equipment48960000Drivers and system software package72211000Programming services of systems and user software72212960Drivers and system software development services
    Location
    Darmstadt, Kreisfreie Stadt, Darmstadt, Kreisfreie Stadt
    Duration
    24 months

    Active similar competitions

    • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

      Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area

      FAIR - Facility for Antiproton and Ion Research in Europe GmbH needs the design, manufacture, supply, installation, and testing of a vacuum-insulated liquid nitrogen transfer system for the Super-FRS experiment area in Darmstadt, Germany, over a duration of 12 months. The base scope includes approximately 200 m of transfer line connecting the tank area to HI/DESPEC and FHF1, with an option for an additional 120 m and one valve box for FHF2. The system must deliver 25 l/min of LN2 at 77 K, with specific pressure requirements. The contractor's scope includes thermal and hydraulic calculations, supports, thermal contraction compensation, AD 2000 and PED compliance, factory and site acceptance testing, and technical documentation. Award criteria are Price (30%), Delivery schedule concept (28%), Technical design (21%), and Installation and execution concept (21%). Qualification requirements include a Bidder Consortium Declaration, a Business and Professional Liability Declaration with a sum insured covering at least the order value, a Declaration of Availability for subcontractors, and descriptions of three comparable reference projects demonstrating experience in manufacturing vacuum insulated cryogenic transfer lines longer than 25m and experience on major construction sites, ideally at research facilities and accelerator installations. Additionally, a certificate demonstrating components designed and tested in accordance with AD 2000 and the Pressure Equipment Directive 2014/68/EU, a Self-Declaration Data Protection Requirements, and a Self-Declaration of Compliance with ISO 9001 (or equivalent) are required.

      Competition28. sep. 2026
      29. okt. 2026(21 days)
    • GSI Helmholtzzentrum für Schwerionenforschung GmbH

      Cold Terminals für SIS100 QDM

      Die GSI Helmholtzzentrum für Schwerionenforschung GmbH benötigt die Lieferung von bis zu 532 Stromadaptern (Cold Terminals) aus supraleitendem Material für den Betrieb im SIS100-Teilchenbeschleuniger in Darmstadt, mit einer Vertragslaufzeit von 24 Monaten. Diese Stromadapter sind für einen Betriebsstrom von 250 A bei ca. 4.5 K ausgelegt und verbinden die Stromzuführung aus Hochtemperatursupraleiter mit der Magnetspule. Die Fertigung erfolgt nach vom Auftraggeber bereitgestellten Zeichnungen, und jeder Adapter muss eine Werksabnahme mit Hochspannungsprüfungen und Tests in Flüssigstickstoff unter Betriebsstrom bestehen. Die Zuschlagskriterien sind Preis (40 %), technisches Konzept Fertigung (21 %), technisches Konzept Testing (21 %), Konzept zum Aufgreifen von technischen Änderungswünschen (6 %) und Lieferzeit/Verpackung (12 %). Qualifikationsanforderungen umfassen eine Betriebshaftpflichtversicherung, eine Eigenerklärung zur Einhaltung der ISO 9001 (oder gleichwertig) und die Beschreibung von drei vergleichbaren Referenzprojekten, die nachweisbare Erfahrungen mit der prozesssicheren Verarbeitung von Epoxy-Klebstoffen und der reproduzierbaren Lötung von Hochtemperatur-Supraleitern, den Umgang mit flüssigem Stickstoff und das Testen supraleitender Materialien bei tiefen Temperaturen sowie Isolationsmessungen bei Gleichspannungen bis 1500 V belegen.

      Framework agreement9. sep. 2026
      12. okt. 2026(4 days)
    • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

      Laboratorie-, optisk- og presisjonsutstyr

      Development and Series Production of Current-to-Frequency Converters for SIS100

      FAIR - Facility for Antiproton and Ion Research in Europe GmbH needs the development and series production of current-to-frequency converters (IFCs) for the SIS100 project, to be delivered in Darmstadt, Kreisfreie Stadt, Germany, over a period of 9 months. The project involves the further development of IFC hardware to meet FAIR parameters and subsequent mass production of IFC devices, including power supply crates, for beam diagnostics in particle accelerators. Suppliers must provide a business and professional liability declaration with an insured sum covering at least twice the order value, a company profile detailing general company data and employee numbers for the last three fiscal years (administration, development/design, production), and descriptions of three comparable reference projects in beam instrumentation for particle accelerators, with at least one related to high-precision beam intensity measurements and development projects of comparable size, not older than 5 years, and with a comparable contract scope in particle accelerator facilities or light sources.

      Competition15. sep. 2026
      16. okt. 2026(8 days)
    • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

      Elektrisk infrastruktur og veibelysning

      CPS and UPS systems for SFRS and NUSTAR

      FAIR - Facility for Antiproton and Ion Research in Europe GmbH needs CPS and UPS systems, including external battery modules, for installation in 19-inch racks along the beamline of the Super-FRS at the FAIR accelerator facility in Darmstadt, Germany. These systems are crucial for providing interference-free power and maintaining power supply during outages, as connected components are sensitive to fluctuations. The contract duration is 4 months. Suppliers must provide three comparable reference projects.

      Competition with qualification28. sep. 2026
      29. okt. 2026(21 days)
    • European X-Ray Free-Electron Laser Facility GmbH

      Herstellung und Lieferung von Power Kopplern nach DESY-Spezifikation und Zeichnungen

      Die European X-Ray Free-Electron Laser Facility GmbH benötigt die Herstellung und Lieferung von 10 Power Kopplern gemäß DESY-Spezifikationen und Zeichnungen. Die Lieferung soll in Hamburg erfolgen und die Vertragslaufzeit beträgt 1 Jahr. Die Vergabe erfolgt ausschließlich nach dem Preis (100%).

      Competition29. sep. 2026
      2. nov. 2026(25 days)