Denmark: Tenders/Klima-, Energi- og Forsyningsministeriet/Advertisement of “New method of projecting data centre electricity consumption in Denmark from 2025 to 2050”
  1. Competition notice published

    Aug 29, 2025 12:45 PMAugust 29, 2025 12:45 PM
  2. Express interest deadline

    Sep 15, 2025 10:00 AMSeptember 15, 2025 10:00 AM
  3. Qualification deadline

    Sep 15, 2025 10:00 AMSeptember 15, 2025 10:00 AM
  4. Tender submission deadline

    Comes with the invitation

Brief

Advertisement of “New method of projecting data centre electricity consumption in Denmark from 2025 to 2050”

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Sep 15, 2025Expired
Award
Understanding of context and relevance 40%
Agreement
Buying services
Estimated value
DKK 300K

Brief

The Ministry of Climate, Energy and Utilities (KEFM) needs services for developing a new method of projecting data centre electricity consumption in Denmark from 2025 to 2050, with a maximum total value of 300,000 DKK. The objective is to create a method that can be updated and further developed in-house, based on recognized and regularly updated data sources, to form part of the foundation for future analysis of the Danish energy system and be integrated into KEFM's existing model setup. The contract will be awarded based on understanding of context and relevance (40%) and methodological approach and analysis quality (60%).

Arkitekttjenester

Register interest in EU Supply

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    See annex 2, section 6.3.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    See annex 2, section 6.2.

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Klima-, Energi- og Forsyningsministeriet

From the notice

  • The Ministry of Climate, Energy and Utilities (KEFM) produces annual projections of data centre electricity consumption as an input to our energy system model setup. KEFM wants to develop a method of projecting that can be updated and further developed in-house. The method must be based on recognized data sources (international or national organs) which are updated regularly. The objective of the task is to develop a method for projecting data centre electricity consumption from 2025 to 2050. This new method for the long term is to form part of the foundation for future analysis of the Danish energy system and be integrated into the KEFM model setup. The long-term model will be integrated into an existing framework operated by KEFM for the short and medium term solely or partly based on TSO data centre pipeline combined with a series of assumptions on e.g. time to build, capacity utilization rate and number of full load hours. The task is described in detail in Annex 1.Main features of the procedurePlease note that the advertisement only comprises of a tendering phase.

  • Contact

    Stine Kristiansenstkri@kds.dk
  • Type
    Competition · Prequalification
  • Main code
    Architectural, construction, engineering and inspection services
    71000000

Similar active competitions

  • EIFO - Danmarks Eksport- og Investeringsfond

    Databaser og databasesystemer

    Tender for contract: Energy sector analysis, new and data with a focus on renewable energy

    EIFO – Danmarks Eksport- og Investeringsfond needs access to energy-sector analysis, current news and market data through a 1+1-year contract, with a maximum total value of DKK 1.5 million. The service should cover technology, energy policy and regulatory developments, with particular focus on renewable energy—including wind, solar, biomass, biogas, power-to-X and energy storage—and provide global country-level coverage. Required data includes demand and capacity forecasts, medium- and long-term wholesale electricity price forecasts, historical wholesale and capture prices, and information on market structures and key players. Award criteria are quality (70%), including geographic coverage, analysis and forecast depth and currency, historical prices, and platform access and support, and price (30%).

    CompetitionDKK 1,500,000
  • Green Tech Valley Cluster GmbH

    IT-rådgivning og strategi

    Unternehmensberatung für einen Ökostromanbieter

    Green Tech Valley Cluster GmbH plant die Beschaffung von Unternehmensberatungsleistungen für einen Ökostromanbieter, um eine belastbare Forecasting-Methodik für Stromverbrauch und Einspeisung zu entwickeln und zu validieren. Interessierte Unternehmen können sich per E-Mail an michelle@greentech.at wenden, um weitere Informationen zum Projekt zu erhalten.

    Planning
  • Energidepartementet

    Data og analyse

    Anskaffelse av tilgang til KI-tjenester for Energidepartementet

    Energidepartementet trenger tilgang til én eller flere standardiserte, skybaserte KI-løsninger for å understøtte departementets arbeid med saksbehandling, utredning, analyse, kunnskapsforvaltning og administrativ støtte. Formålet er å øke effektiviteten og forbedre kunnskapsgrunnlaget for ansatte. Leverandører kan tilby løsninger som dekker administrative og generelle arbeidsoppgaver, analyse-, utviklings- og ekspertoppgaver, eller begge deler. Departementet vil inngå inntil to kontrakter. Avtalen har en varighet på 1 år fra tjenesten er tilgjengelig, med en estimert totalverdi på 1,299 millioner kroner ekskl. mva.

    CompetitionNOK 1,299,000