Airfin-coolers
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- May 17,Expired
- Award
- Price, weight 40
Brief
N.V. Nederlandse Gasunie has entered into a framework agreement with Alfa Laval Olmi SPA for the delivery of airfin coolers, including engineering, manufacturing, inspection, transport, delivery, installation, commissioning, testing, and operational field acceptance tests, over a period of 12 years. The agreement covers three types of airfin coolers: for the triethylene glycol (TEG) unit, for the intermediate stage hydrogen compressors, and for the discharge of the hydrogen compressors. The initial delivery in Q2 2027 includes 2 pieces of each type, with later deliveries after 2030 for 1 TEG airfin cooler and 3 pieces of each compressor airfin cooler. The contract was awarded based on quality (60%) and price (40%), with 2 bids received.
Elektrisk utstyr og belysning
Result
- Alfa Laval Olmi SPAWinner
- 2Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to €26,000,000
Previous winners
Who are you up against?
The suppliers who have won similar contracts at N.V. Nederlandse Gasunie
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Quality
Source
No source found in the documents. Check the weight against the tender documents.
Description
Price
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
We need three types of airfin coolers. • An airfin-cooler for the triethylene glycol (TEG) unit: Each TEG unit will be equipped with an airfin-cooler upstream of the absorption column. The aim is to cool the hydrogen gas from the cavern before it enters the absorption column. • An airfin cooler for the intermediate stage hydrogen compressors: Each compressor is fitted with an airfin cooler in the intermediate stage. Its purpose is to cool the compressed hydrogen. • An airfin cooler for the discharge of the hydrogen compressors: Each compressor will be equipped with an airfin cooler in the discharge. The purpose is to cool the compressed hydrogen. The supplier must carry out the engineering, manufacturing, inspection, transport, delivery, installation, commissioning, testing and operational field acceptance test. Gasunie will carry out preventive maintenance itself and corrective maintenance can be placed with the supplier, as can the supply of any spare parts. Q2 2027: Airfin-cooler TEG: 2 pieces. Airfin-cooler compressor first stage: 2 pieces. Airfin-cooler compressor second stage: 2 pieces. Later delivery > 2030. Airfin-cooler TEG: 1 piece. Airfin-cooler compressor first stage: 3 pieces. Airfin-cooler compressor second stage: 3 pieces.
Contact
Paula Molp.mol@gasunie.nl- Result · Framework agreement · PrequalificationType
- 31161200Main codeGas cooling systems
- 31140000Cooling towers