AO9 (P3 Golf de Fos 2) Environmental Impact Assessment
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Miljørådgivning og klimatiltak
Drafting, support, and preparation of the necessary documents for submitting a request for a single authorization associated to projects in the Exclusive Economic Zone (EEZ), including environmental impact study files, Natura 2000 impact assessments, and applications for derogation concerning protected species and its support during the examination and consultation phase, until its issuance for one to two offshore wind projects. The candidate must demonstrate their ability to address the identified themes and expertise required for the successful completion of the single authorization request. This capability can be justified either independently or in a consortium. The need for support from expert consulting firms on certain themes must be specified. Note: EDF power solutions is still awaiting the final specifications from the State; the contract may be slightly revised as a result.
About the bid
- Contact name
- Nahed GARES
- Contact phone
- 0618062619
- Contact email
- nahed.gares@edf-re.fr
- Address
- 43 Boulevard des BOUVETS, 92741 NANTERRE CEDEX
Drafting, support, and preparation of the necessary documents for submitting a request for a single authorization associated to projects in the Exclusive Economic Zone (EEZ), including environmental impact study files, Natura 2000 impact assessments, and applications for derogation concerning protected species and its support during the examination and consultation phase, until its issuance for one to two offshore wind projects. The candidate must demonstrate their ability to address the identified themes and expertise required for the successful completion of the single authorization request. This capability can be justified either independently or in a consortium. The need for support from expert consulting firms on certain themes must be specified. Note: EDF power solutions is still awaiting the final specifications from the State; the contract may be slightly revised as a result.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Cost is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/ AVIS 019788
Description
Price is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/ AVIS019788
Description
Quality is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/AVIS019788
Qualification requirements
Description
The candidate must be in compliance with Articles L. 5212-1 to L. 5212-11 of the French Labor Code concerning the employment of disabled workers.
Documentation Requirement
If the candidate is in compliance with these articles of the Public Procurement Code, please submit the completed and signed affidavit on the following website https://pha2.edf.com/referenced AVIS019634. In the event of a group, a certificate must be provided by each member of the group. These conditions apply to candidates and to each member of a candidate group.
Description
If several candidates wish to present themselves as a group, a duly completed group agreement detailing the work that will be carried out by each member of the group is required.
Documentation Requirement
The duly completed group agreement.
Description
A sworn statement of non-conviction of the company or each member of the group.
Documentation Requirement
A sworn statement of non-conviction of the company or each member of the group, on the following site https://pha2.edf.com/ referenced AVIS019634.
Description
A K-Bis extract less than 6 months old from the company or each member establishment of the group responding to the call for applications.
Documentation Requirement
A K-Bis extract less than 6 months old from the company or each member establishment of the group responding to the call for applications.
Description
A certificate of social declarations and payment of contributions from the company or each member of the group.
Documentation Requirement
A certificate of social declarations and payment of contributions from the company or each member of the group.
Description
If the bidder or one or more members of the group are secondary establishments and do not have certificates in their name, the bidder(s) must provide the certificates from the entity to which the secondary establishment responding to the call for applications is linked.
Documentation Requirement
The certificates from the entity to which the secondary establishment responding to the call for applications is linked as well as the K-BIS, L-BIS or Situation extract in the SIRENE directory justifying the link between the two establishments.
Description
A certificate of Civil Liability insurance from the company or each member of the group.
Documentation Requirement
A certificate of Civil Liability insurance from the company or each member of the group.
Description
The compliance questionnaire duly completed by the company or each member of the group.
Documentation Requirement
The compliance questionnaire duly completed by the company or each member of the group communicated on the following site https://pha2.edf.com/ referenced AVIS019788.
Description
The company, or each member of the group of companies, must submit a presentation of its structure, its organization, and in the case of a subsidiary, must indicate the name of its parent company and its share.
Documentation Requirement
A presentation of the company's structure, organization, and in the case of a subsidiary, the name of its parent company and its share.
Description
Only companies or groups whose turnover is greater than or equal to twice the amount of the contract may submit a tender.
Documentation Requirement
Not specified.
Description
Only companies or groups that have submitted the last three financial reports (income statements and the last 3 available balance sheets on the date of this contract notice) of the company or each member of the group may submit a tender. If, given the date of creation of their company, the candidate does not have all the information, they must provide equivalent supporting documents.
Documentation Requirement
The last three financial reports (income statements and the last 3 available balance sheets on the date of this contract notice) of the company or each member of the group. If not available, equivalent supporting documents.
Description
Companies or groups may submit a financial rating by an independent body (such as Banque de France or equivalent).
Documentation Requirement
A financial rating by an independent body (such as Banque de France or equivalent (reference rating Banque de France or equivalent)).
Description
If 50% or more of the company or a member of the group is held by a third company or if this third company holds 50% or more of the votes or if more than half of its members are on the management committee of the company of the member of the group, then this parent company must provide all the supporting documents necessary for the assessment of the economic and financial capacity.
Documentation Requirement
All the supporting documents necessary for the assessment of the economic and financial capacity from the parent company.
Description
Justification of available resources in expertise dedicated to the challenges of an offshore wind project throughout the duration of the service, specifying what is internal, external (subcontracted), or not covered.
Documentation Requirement
Justification of available resources in expertise.
Description
List the themes inherent to the completeness of an impact study, specifying what is internal, external (subcontracted), or not covered.
Documentation Requirement
A list of the themes inherent to the completeness of an impact study.
Description
Details of specific expertise available internally or through direct subcontracting.
Documentation Requirement
Details of specific expertise.
Description
References directly related to the completion of environmental impact studies in marine environments, specifying the country, type of project, and year.
Documentation Requirement
References directly related to the completion of environmental impact studies in marine environments.
Description
References related to Natura 2000.
Documentation Requirement
References related to Natura 2000.
Description
Justification of the company's ability to produce all expertise and reports natively in French.
Documentation Requirement
Justification of the company's ability to produce all expertise and reports natively in French.
Description
The company or consortium must have human resources capable of reading and understanding French in all areas (project management, engineering, operations, commercial, legal, and technical assistance).
Documentation Requirement
A sworn statement.
Description
EN ISO9001 certification, or equivalent in quality management system.
Documentation Requirement
EN ISO9001 certification, or equivalent.
Description
ISO14001 certification, or equivalent in environmental management system.
Documentation Requirement
ISO14001 certification, or equivalent.
Description
HSE KPIs or any accident/incident tracking system if applicable for the last 5 years or the most recent, if applicable.
Documentation Requirement
HSE KPIs or any accident/incident tracking system.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- EDF Renouvelables
- Title
- AO9 (P3 Golf de Fos 2) Environmental Impact Assessment
- Type
- Main code
- Supplemental codes