Find

  • All tenders
All tenders: Ireland/Wicklow County Council/Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension

Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension

Expired

The competition has expired without a winner being announced.

Deadline
Jul 9,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€0over 6 months

Brief

Wicklow County Council needs to upgrade and future-proof the electrical infrastructure at Arklow Harbour South Quay over 6 months. This involves decommissioning obsolete equipment, installing a new high-capacity electrical distribution system, potentially removing legacy cabling, and installing marine-grade armoured wiring, new distribution boards, and weather-resistant electrical pedestals. The project also includes configuring the architecture to integrate future prepaid metering technologies. The scope covers Distribution and Control Infrastructure, Cable Management and Wiring, Earthing and Safety Systems, Lighting Infrastructure and Safety Enhancement, and Pontoon Pedestals.

Elektroinstallasjon i bygninger

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Wicklow County Council

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • This project comprises the comprehensive upgrade of marine electrical infrastructure at the Arklow Harbour South Quay network, involving the decommissioning of obsolete distribution equipment and the installation of a new, high-capacity electrical distribution system designed for robust, scalable performance and to allow additional outlets for fishing crew. The scope includes the potential removal of legacy cabling and the installation of marine-grade armoured wiring, new distribution boards, and weather-resistant electrical pedestals, all engineered to support both current operational demands and future multi-berth pontoon expansions. Furthermore, the architecture is specifically configured to integrate future prepaid metering technologies, ensuring a seamless, modern, and efficient utility network that meets the harbour's long-term growth requirements. Areas include: Distribution and Control Infrastructure, Cable Management and Wiring, Earthing and Safety Systems, Lighting Infrastructure and Safety Enhancement, and Pontoon Pedestals.

  • Contact

    adillontoth@wicklowcoco.ie
  • Type
    Competition
  • Location
    South-East
  • Main code
    Electrical installation work
    45310000
  • 34931000Harbour equipment45241000Harbour construction works45244000Marine construction works45311100Electrical wiring work45315100Electrical engineering installation works45315600Low-voltage installation work45317300Electrical installation work of electrical distribution apparatus

Similar active competitions

  • City of Dublin Education and Training Board

    Elektrisk infrastruktur og veibelysning

    Ballyfermot FET College South Campus – Emergency Electrical Upgrade and Fire Improvement Works - Phase 1

    City of Dublin Education and Training Board requires emergency electrical upgrade and fire improvement works at the operational Ballyfermot Further Education College South Campus in Dublin, under a 2-year contract with a maximum total value of €3 million. The works include phased electrical strip-out and rewiring; replacement of electrical distribution, lighting, fire alarms, ICT and Wi-Fi infrastructure, CCTV, access control and lightning protection; and fire compartmentation, fire stopping, fire doors and associated builders’ work, testing, commissioning, certification and reinstatement of finishes. Delivery must be phased to keep the College operating while maintaining life-safety systems, emergency routes and essential services.

    Competition
    Nov 27, 2026(1 day)
    €3,000,000
  • Port of Cork Company

    Asfalt og veioverflater

    Re-development of Ringaskiddy Port at Ringaskiddy West

    Port of Cork Company needs construction services for the re-development of Ringaskiddy Port at Ringaskiddy West, which includes extending the deep-water berth, surfacing land, dredging the seabed to -13.4m Chart Datum, lighting, drainage, and other associated civil engineering and mechanical/electrical works. The project duration is 24 months.

    Qualification system
    Nov 27, 2026(1 day)
  • The High Court of Ireland

    and 2 others
    Elektrisk infrastruktur og veibelysning

    Ratoath Junior National School

    The High Court of Ireland requires electrical installation works throughout Ratoath Junior National School, to be completed over 9 months. The work includes power and general services, lighting and emergency lighting, protective systems, a new three-phase ESB supply, and two new ESB meters serving the Junior and Senior Schools; the project is located in Ireland’s Mid-East region.

    Competition
    Dec 16, 2026(20 days)
    €0