Denmark: Tenders/Hovedstadens Letbane I/S/AsBo/ISA for the Construction Phase of Ring 3 Light Rail
  1. Competition notice published

    Mar 31, 2021 8:00 AMMarch 31, 2021 8:00 AM
  2. Express interest deadline

    May 3, 2021 11:00 AMMay 3, 2021 11:00 AM
  3. Qualification deadline

    Not stated
  4. Tender submission deadline

    May 3, 2021 11:00 AMMay 3, 2021 11:00 AM
  5. Invitation to submit tender

    May 8, 2021 10:00 PMMay 8, 2021 10:00 PM
  6. Tender validity period

    Nov 3, 2021 12:00 PMNovember 3, 2021 12:00 PM

Brief

AsBo/ISA for the Construction Phase of Ring 3 Light Rail

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
May 3, 2021Expired
Procedure
With negotiationTwo stages
Agreement
Buying servicesover 4 years

Brief

Hovedstadens Letbane I/S will procure an AsBo/ISA (Assessor) to assess all aspects of the specifications, design, manufacture, construction, installation, training, testing, commissioning, trial running and final acceptance of the Light Rail Transit system to verify compliance with the governing standards for the assessment services and the standards governing safety of the Ring 3 Light Rail.

Miljørådgivning og klimatiltak

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    The Assessor shall be accredited as an AsBo/ISA.

    Documentation Requirement

    The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Information on the applicants general yearly turnover for the last 3 years (if available).

    Documentation Requirement

    This information needs to be filled in section IV.B in the ESPD (the field in the ESPD in brackets). Formalities: If the application is submitted by a consortium an ESPD is required for each member of the consortium. Further a description of the roles of each member and an argumentation for the need of the consortium need to be filled in section II.A in the ESPD. If the applications is based on a third party; the third party need to fill in section IV.B in the ESPD. The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Information on the applicants solidity for the last 3 years (if available).

    Documentation Requirement

    This information needs to be filled in section IV.B in the ESPD (the field in the ESPD in brackets). Formalities: If the application is submitted by a consortium an ESPD is required for each member of the consortium. Further a description of the roles of each member and an argumentation for the need of the consortium need to be filled in section II.A in the ESPD. If the applications is based on a third party; the third party need to fill in section IV.B in the ESPD. The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Information on the applicants result after taxation for the last 3 years (if available).

    Documentation Requirement

    This information needs to be filled in section IV.B in the ESPD (the field in the ESPD in brackets). Formalities: If the application is submitted by a consortium an ESPD is required for each member of the consortium. Further a description of the roles of each member and an argumentation for the need of the consortium need to be filled in section II.A in the ESPD. If the applications is based on a third party; the third party need to fill in section IV.B in the ESPD. The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Information on the applicants equity for the last 3 years (if available).

    Documentation Requirement

    This information needs to be filled in section IV.B in the ESPD (the field in the ESPD in brackets). Formalities: If the application is submitted by a consortium an ESPD is required for each member of the consortium. Further a description of the roles of each member and an argumentation for the need of the consortium need to be filled in section II.A in the ESPD. If the applications is based on a third party; the third party need to fill in section IV.B in the ESPD. The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    5 references are required. For each reference the following information is required: description of the project assessed and the legal basis for the assessment, description of the role of the applicant and the services provided by the applicant, the fee for solving the task, start date and end date, the name of the client and contact information for a contact person in the clients organisation. Hovedstadens Letbane reserves the right to contact the contact person mentioned above.

    Documentation Requirement

    5 references need to be filled in the section IV.C of the ESPD. Formalities: If the applicant would like to submit illustrations related to the references it is allowed. In case make a reference to the illustration in the description of the reference and upload the illustration together with the ESPD(s). If the application is submitted by a consortium an ESPD is required for each member of the consortium. Further a description of the roles of each member and an argumentation for the need of the consortium need to be filled in section II.A in the ESPD. If the applications is based on a third party; the third party need to fill in section IV.C in the ESPD. The applicant need to fill in, sign and date an ESPD. Using the ESPD system please import an XML-file from www.byggeprojekt.dk. Access to the system are available after registering via the link in section I.3 of the present contract notice. The applicant need to fill in section II to V and date and sign section VI of the ESPD. An ESPD is needed for each member of a Consortium, cf. section III.1.2 and III.1.3. A third party need to fill in an ESPD in accordance with section III.1.2 and III.1.3 and date and sign section VI. The application need to be submitted via www.byggeprojekt.dk. A guide to submitting the application for prequalification is uploaded to www.byggeprojekt.dk

    Source

    No source found in the documents. Check the requirement against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Hovedstadens Letbane I/S

From the notice

  • Hovedstadens Letbane I/S will procure an AsBo/ISA (Assessor) to assess all aspects of the specifications, design, manufacture, construction, installation, training, testing, commissioning, trial running and final acceptance of the Light Rail Transit system to verify compliance with the governing standards for the assessment services and the standards governing safety of the Ring 3 Light Rail.

  • Contact

    Carsten LarsenHLprocurement@m.dk
  • Type
    Competition · Prequalification
  • Main code
    Risk or hazard assessment for construction
    71313410
  • 71311200Transport systems consultancy services

Similar active competitions

  • Nakkilan seurakunta

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Nakkilan kirkon julkisivujen perusparannustyöt, kokonaisurakka

    Nakkilan seurakunta tarvitsee Nakkilan kirkon julkisivujen perusparannustyöt Satakunnassa tarjouspyyntöasiakirjoissa määritellyssä laajuudessa. Kyseessä on kiinteähintainen kokonaisurakka, jossa rakennusteknisten töiden urakoitsija toimii pääurakoitsijana ja lainsäädännön mukaisena päätoteuttajana. Tarjous valitaan kokonaistaloudellisen edullisuuden perusteella; vertailun tarkemmat perusteet on esitetty hankinta-asiakirjoissa.

    Competition
    Nov 9, 2026(9 days)
  • Hrvatske autoceste d.o.o.

    Reparasjon og vedlikehold

    Usluga održavanja i popravaka meteoroloških stanica

    Hrvatske autoceste d.o.o. traže usluge održavanja i popravaka meteoroloških stanica na području Grada Zagreba, kroz ugovor od 1 godine maksimalne ukupne vrijednosti 395.000 EUR. Ponude se ocjenjuju prema cijeni (90%) i jamstvenom roku za ugrađene nove rezervne dijelove (10%); prihvatljivi su rokovi od 12, 18 ili 24 mjeseca. Ugovor je dodijeljen tvrtki LED elektronika d.o.o. za 100.041 EUR.

    Competition
    Nov 19, 2026(19 days)
    €395,000
  • GRAD ZAGREB

    DRVENA PILJENA GRAĐA

    Grad Zagreb uspostavlja dinamički sustav nabave za isporuku drvene piljene građe na području Zagreba, namijenjene izradi i popravku parkovne opreme te podupiranju stabala. Nabava obuhvaća sirovine i obrađene elemente te impregnirane i neimpregnirane kolce za podupiranje stabala; specifikacije i količine utvrđivat će se u pozivima za pojedinačne nabave. Procijenjena maksimalna ukupna vrijednost sustava iznosi 1.224.000 eura. Ponude se u pojedinačnim nabavama boduju prema cijeni (90%) i roku odaziva na reklamaciju kvalitete isporuke (10%). Za sudjelovanje se traže upis u odgovarajući registar i reference za isporuke. SMIT-COMMERCE d.o.o. dobio je raniji ugovor za istu vrstu robe.

    Dynamic purchasing system
    Nov 2, 2026(2 days)
    €1,224,000