    AVV Square 2.0 - Battery Energy Storage System (BESS)

    Ørsted Bioenergy & Thermal Power A/S

    AVV Square 2.0 - Battery Energy Storage System (BESS)

    1. Contract start date

      Aug 5, 2025 12:00 AMAugust 5, 2025 12:00 AM
    2. Supplier selection

      Sep 8, 2025 12:00 AMSeptember 8, 2025 12:00 AM
    3. Contract signed

      Oct 15, 2025 12:00 AMOctober 15, 2025 12:00 AM
    4. Result notice published

      Oct 20, 2025 10:31 AMOctober 20, 2025 10:31 AM

    Brief

    Denmark: Tenders/Ørsted Bioenergy & Thermal Power A/S/AVV Square 2.0 - Battery Energy Storage System (BESS)

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Oct 19, 2025Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goodsover 4,017 days

    Brief

    Ørsted Bioenergy & Thermal Power A/S har inngått en avtale med PowerCon om å levere et batterienergilagringssystem (BESS) til Avedøreværket i Avedøre, Danmark. Systemet skal ha en kapasitet på minimum 20 MW og kunne operere i ca. 2 timer, med formål å levere støttetjenester til det elektriske overføringssystemet DK2. Avtalen inkluderer levering, installasjon og igangkjøring av BESS, samt en service- og vedlikeholdsavtale for 2+4+4 år, med en total verdi på 11 350 000 €.

    Result

    TED
    • Powercon A/S
      Winner
    • Number of bids
      3
    • Contract value
      €11,350,000

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Ørsted Bioenergy & Thermal Power A/S

    From the notice

    • The Battery Energy Storage System (BESS) is to be installed within the perimeters of the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS will be sized for aminimum of 20 MW usable capacity capable of operating for approx. 2 hours at nameplate rating. The purpose of the BESS is to provide the ancillary services FCR-N (“Frequency Containment Reserve for Normal operations”), FCR-D (“Frequency Containment Reserve for Disturbances”) and FFR (“Fast Frequency Response”), aFRR and mFRR (“automatic/manual Frequency Restoration Reserve”) for participation in the regulation of the electrical transmissionsystem DK2 that is within responsibility of the Transmission System Operator (TSO) Energinet Elsystemansvar A/S. The Contract comprises the following: (a) Delivery of the BESS consisting of Battery bank, Inverter system, BESS transformer, Medium voltage (MV) interface to the interconnection cables, DC and AC switch-boards, HVA/C and fire controlsystem, LV and MV cabling (internally within the BESS, but not between BESS equipment units), housing forcomponents, Energy Management System (EMS), Metering system, and Frequency measurement device, (b) Installation and commissioning of the BESS at the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark, (c) Service and Maintenance Agreement including consumables and spare parts for 2 years operation, (d) First extension of the Service and Maintenance Agreement for additional 4 years including consumablesand spare parts (years 3 to 6 – optional for the Contracting Entity) (e) Second extension of the Service and Maintenance Agreement for additional 4 years including consumables and spare parts (years 7 to 10 – optional for the Contracting Entity) (f) A water-based sprinkler system (optional for the Contracting Entity) (g) Drainage inside the housing forcomponents to handle contaminated fire water (optional for the Contracting Entity).

    • Contact

      Senior Sourcing Manager / BIO Strategic Sourcingmiklo@orsted.com
    • Type
      Result · Prequalification
    • Location
      Københavns omegn
    • Main code
      Accumulators, primary cells and primary batteries
      31400000
    • 50532000Repair and maintenance services of electrical machinery, apparatus and associated equipment

    Similar active competitions

    • Havenbedrijf Amsterdam N.V.

      Elektrisitet og energiforvaltning

      Aanschaf industrieel batterijsysteem

      Havenbedrijf Amsterdam N.V. heeft behoefte aan de aanschaf, levering en onderhoud van een industrieel batterijopslagsysteem in Groot-Amsterdam. De maximale totale contractwaarde bedraagt 500.000 EUR en de looptijd van het project is 6 maanden.

      Competition
      Nov 16, 2026(17 days)
      €500,000
    • Electricity Supply Board ( ESB )

      Rådgivende ingeniørtjenester for bygg og anlegg

      TR2928 Supply andCommissioning of Long Duration Energy Storage System(s) on the Island of Ireland

      A.1.1 General Description of the Proposed Contract The Contracting Entity intends to procure a contract for the Supply and Commissioning of Long Duration Energy Storage Systems at a number of project sites in the Republic of Ireland and Northern Ireland. The scope includes the design, integration, supply, delivery to site and commissioning of lithium-ion battery energy storage systems and may also be extended to include aspects of installation/construction works, civil works, electrical works, etc. as may be required by the Contracting Entity and for which such extension of scope would be confirmed at Request for Tender RfT stage. It may also include the provision of suitable supervision of the installation of these systems by a third party, the provision of appropriate product and performance warranties and provision of an appropriate Long Term Service Agreement LTSA for each project.

      Qualification system
      Jan 14, 2028(100+ days)
    • Batterij Meerstad Noord B.V.

      Elektrisk infrastruktur og veibelysning

      Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

      Batterij Meerstad Noord B.V. in the Netherlands needs three contractors for a framework agreement over 8 years for the realization of a Battery Energy Storage System (BESS) at Energielandschap Lageland. The project involves the delivery of a functional, ready-to-use, grid-compliant, and safe battery system, with contractors responsible for design, supply, construction, system integration, testing, commissioning, and handover, as well as long-term operation and maintenance. Phase 1 includes approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029. Phase 2 involves an expansion to at least 50 MW // 200 MWh BESS around 2032/2033. Award criteria are Price (50%) and Quality (50%).

      Framework agreement with qualification
      Oct 29, 2026(0 days)