Ball-, plug-, globe and monoflange valves for reverse flow station Herning
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Nov 23, 2023Expired
- Procedure
- With negotiationTwo stages
Brief
The Contracting Authority wants to purchase Valves for Reverse flow station Herning. The tender is divided into three lots: Lot 1 includes: • Flanged ball valves for installation above ground without actuator • Flanged ball valves for installation above ground with electrical actuators with or without “fail safe” function • Welded ball valves for installation below ground without actuator. Hand wheels for opera-tion of the valve is above ground • Welded ball valves for installation below ground with above ground electrical actuators with or without “fail safe” function Lot 2 includes: • Flanged double plug valves for installation above ground without actuator. • Flanged double plug valves for installation above ground with electrical actuators without “fail safe” function Lot 3 includes: • Flanged globe valves for installation above ground without actuator • Slim line DBB valves without actuator For more details, reference is made to the Tender Documents.
Rørlegger- og sanitærarbeid
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report regarding the following economic indicators: 1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.) 2. Equity ratio (equity/total assets). This must be stated with two decimals. If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached on the basis of consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
Documentation Requirement
Information from the latest annual report regarding equity and equity ratio, stated with two decimals. If relying on other entities, a separate ESPD from each entity.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The applicant must include the up to 3 most comparable and relevant references undertaken in the past three (3) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Undertaken in the past three (3) years implies that the reference must not have been completed prior to the date reached when counting 3 years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9. The references should include a specific description of the work performed for each reference, including: • Deliverance of valves equivalent to the ones set out in this tender • Contract value (if possible) • Contact information for the entity in question (including contact person) • Contract period and date of initiation and final delivery (day, month, year) Any ambiguities and/or incomprehensibilities concerning the above information may have a negative effect on the selection of candidates, cf. section II.2.9. Please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box. If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities. The number of references should not surpass a maximum of the 3 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the maximum number of references to be submitted must still be respected and cannot exceed 3 when combined. If more than 3 references are submitted, the Contracting Authority will only consider the 3 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
Documentation Requirement
Up to 3 most comparable and relevant references undertaken in the past three (3) years, stated in the ESPD part IV.C. Each reference should include a specific description of the work performed, deliverance of equivalent valves, contract value (if possible), contact information for the entity, and contract period with initiation and final delivery dates. If relying on other entities, a separate ESPD from each entity.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The applicant must submit a completed version of the ESPD. Applicants may not be subject to the mandatory grounds for exclusion, cf. the Danish Public Procurement Act (udbudsloven) Section 134a, 135 (1-3) and 136. The application must be submitted through EU-Supply, cf. link in section I.1 in this notification. Applications not submitted via EU-supply or received after the deadline will not be accepted. The Contracting Authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
Documentation Requirement
A completed version of the ESPD submitted through EU-Supply.
Source
No source found in the documents. Check the requirement against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Energinet Gastransmission A/S
From the notice
The Contracting Authority wants to purchase Valves for Reverse flow station Herning. The tender is divided into three lots: Lot 1 includes: • Flanged ball valves for installation above ground without actuator • Flanged ball valves for installation above ground with electrical actuators with or without “fail safe” function • Welded ball valves for installation below ground without actuator. Hand wheels for opera-tion of the valve is above ground • Welded ball valves for installation below ground with above ground electrical actuators with or without “fail safe” function Lot 2 includes: • Flanged double plug valves for installation above ground without actuator. • Flanged double plug valves for installation above ground with electrical actuators without “fail safe” function Lot 3 includes: • Flanged globe valves for installation above ground without actuator • Slim line DBB valves without actuator For more details, reference is made to the Tender Documents.
Contact
Procurement - Aprocurement@energinet.dk- Competition · PrequalificationType
- 42131000Main codeTaps, cocks and valves
- 42131240Globe valves42131260Ball valves42131270Plug valves42132100Valve actuators