Slovakia: Tenders/Slovenské elektrárne, a.s./Battery energy storage system in EBO (BESS EBO)

Battery energy storage system in EBO (BESS EBO)

Cancelled

The competition has been cancelled.

Qualification deadline
Jan 22,Expired
Award
Procedure
With negotiationTwo stages
Agreement
Buying goodsuntil Aug 2027

Brief

Slovenské elektrárne, a.s. has cancelled the competition for the supply, construction, and commissioning of a battery energy storage system (BESS) with an installed capacity of a minimum of 89 MW (two units of 2 x 44.5 MW) and a total capacity of a minimum of 178 MWh. The system was intended for the existing site of the Slovak Nuclear Power Plants, where the storage capacity needed to be twice the installed capacity. The sole award criterion was the lowest total price.

Batterisystemer og energilagring

Result

TED
  • Reason for cancellation
    Other
  • Number of tenders received
    0

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Slovenské elektrárne, a.s.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    The sole criterion for evaluating bids is the lowest total price for delivery of the tender subject, expressed in EUR exclusive of VAT.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The objective of the project is the supply, construction and commissioning of a battery storage system (BESS) with an installed capacity of minimum 89 MW in two units of 2 x 44.5 MW and a total capacity of minimum 178 MWh, on the existing site of the Slovak Nuclear Power Plants, where the capacity of the storage system must be twice the installed capacity.

  • Contact

    robert.szoke@seas.sk
  • Type
    Result · Prequalification
  • Location
    Trnavský kraj
  • Main code
    Batteries
    31440000
  • 31214000Switchgear31321000Electricity power lines31321210Low-voltage cable31321300High-voltage cable45000000Construction work45255400Fabrication work71300000Engineering services71632000Technical testing services80531200Technical training services

Similar active competitions

  • Slovenské elektrárne, a.s.

    Batterisystemer og energilagring

    Implementation of Battery Energy Storage System at Čierny Váh

    Slovenské elektrárne, a.s. seeks an EPC contractor to design, permit, supply, install, commission and put into operation a battery energy storage system at Čierny Váh in the Žilinský Region, over approximately 1,234 days. The BESS must provide at least 480 MWh of usable capacity and 120 MW of rated power, connect to the 400 kV substation through a new 400 kV bay, and support frequency reserves, electricity-market services, frequency-response functions and island operation to maintain the pumped-storage plant’s auxiliary supply during loss of its 22 kV connection. The scope includes civil, electrical and mechanical works; battery containers, conversion and control systems, transformers, switchgear and related equipment; integration with existing plant systems; protection, monitoring, communications, fire safety and security; and testing, performance verification, operational training and documentation needed for safe, reliable operation. The contract will be awarded solely on the lowest total price excluding VAT.

    Competition with qualification
    Nov 30, 2026(7 days)
  • Teplárna České Budějovice, a.s.

    Elektrisk infrastruktur og veibelysning

    Dodávka bateriového úložiště

    Teplárna České Budějovice, a.s. potřebuje v Jihočeském kraji dodat a namontovat bateriové úložiště s maximální celkovou hodnotou 62 milionů Kč. Zakázka zahrnuje dva bateriové kontejnery a dvě trafostanice, elektroinstalaci pro připojení úložiště a řízení jeho technologií pro poskytování podpůrných služeb výkonové rovnováhy sítě. Součástí je také zpracování a posouzení projektové dokumentace pro provádění stavby, dodávka a montáž všech projektovaných komponent a související práce a služby. Nabídky budou hodnoceny výhradně podle ceny; rozhoduje nejnižší nabídková cena bez DPH.

    Competition
    Dec 7, 2026(14 days)
    CZK 62,000,000
  • Stadtwerke Schneeberg GmbH

    Batterisystemer og energilagring

    Projektierung, Lieferung und Errichtung eines Batteriespeichersystems (BESS)

    Die Stadtwerke Schneeberg GmbH benötigt im Erzgebirgskreis die Projektierung, Lieferung, Errichtung und Inbetriebnahme eines Batteriespeichersystems (BESS) mit 3 MW Leistung und 6 MWh Kapazität einschließlich Übergabe-Trafostation. Der Auftrag hat eine Laufzeit von 18 Monaten und einen maximalen Gesamtwert von 1,9 Millionen Euro. Für die Eignung sind Eigenerklärungen zu zwei vergleichbaren Referenzobjekten sowie eine Berufshaftpflichtversicherung mit jeweils mindestens 3 Millionen Euro Deckung für Personen- und sonstige Schäden nachzuweisen. Gewertet werden der Gesamtpreis mit 60 %, der Wirkungsgrad (RTE) mit 20 % und das Degradationsverhalten mit 20 %.

    Competition
    Nov 30, 2026(7 days)
    €1,900,000