    Beam Current Monitors (BCM) for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC

    SCK•CEN

    Beam Current Monitors (BCM) for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC

    1. Contract start date

      Jan 1, 2025 12:00 AMJanuary 1, 2025 12:00 AM
    2. Result notice published

      Mar 11, 2025 10:00 PMMarch 11, 2025 10:00 PM
    3. Change in result

      Jan 14, 10:00 PMJanuary 14, 2026 10:00 PM
    4. Contract end date

      Dec 31, 2028 12:00 AMDecember 31, 2028 12:00 AM

    Brief

    Belgium: Tenders/SCK•CEN/Beam Current Monitors (BCM) for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Jan 14,Expired
    Award
    Price only
    Procedure
    Without prior noticeTwo stages
    Agreement
    Buying goodsuntil Dec 2028

    Brief

    SCK•CEN has entered into an agreement with Bergoz Instrumentation for the supply of Beam Current Monitors (BCMs), specifically AC current transformers (ACCTs) with necessary cables and calibrated analog front-end electronics (AFEs), for the MYRRHA Phase I (MINERVA) 100 MeV proton LINAC. The contract has a final value of 337,198 €.

    Laboratorie- og analyseutstyr

    Result

    TED
    • Bergoz Instrumentation
      Winner
    • Number of bids
      1
    • Contract value
      €337,198

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      Total cost of all necessary BCMs

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at SCK•CEN

    From the notice

    • The subject of this procurement is the supply of Beam Current Monitors (BCMs). The BCM system design of MINERVA requires the use of AC current transformers (ACCT). To guarantee acceptable performance of the pre-digitized signal across the readout chain, this procurement therefore concerns the supply of the ACCTs along with their necessary cables and calibrated analog front-end electronics (AFEs).

    • Contact

      aanbestedingen@sckcen.be
    • Type
      Result · Prequalification
    • Location
      Arr. Turnhout
    • Main code
      Particle accelerators
      31643000
    • 31643100Linear accelerators38400000Instruments for checking physical characteristics38410000Metering instruments

    Similar active competitions

    • SCK•CEN

      Elektrisk utstyr og belysning

      Beam Loss Monitors (BLMs) for the NC Linac

      SCK•CEN heeft behoefte aan Beam Loss Monitors (BLM's) voor de NC Linac voor MYRRHA Fase I (MINERVA) 100 MeV proton LINAC. De levering van deze goederen zal plaatsvinden in Arr. Turnhout, België, en de contractduur is 3 jaar.

      Competition
      Nov 16, 2026(17 days)
    • SCK•CEN

      Elektrisk utstyr og belysning

      Beam Loss Monitors (BLMs) for the SC Linac

      SCK•CEN heeft lineaire versnellers nodig voor de MYRRHA Fase I (MINERVA) 100 MeV proton LINAC, specifiek Beam Loss Monitors (BLMs), voor een periode van 3 jaar. De levering vindt plaats in Arr. Turnhout, België.

      Competition
      Nov 16, 2026(17 days)