Beam Current Monitors (BCM) for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Jan 14,Expired
- Award
- Price only
Brief
SCK•CEN has entered into an agreement with Bergoz Instrumentation for the supply of Beam Current Monitors (BCMs), specifically AC current transformers (ACCTs) with necessary cables and calibrated analog front-end electronics (AFEs), for the MYRRHA Phase I (MINERVA) 100 MeV proton LINAC. The contract has a final value of 337,198 €.
Laboratorie- og analyseutstyr
Result
- Bergoz InstrumentationWinner
- 1Number of bids
- €337,198Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Total cost of all necessary BCMs
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at SCK•CEN
From the notice
The subject of this procurement is the supply of Beam Current Monitors (BCMs). The BCM system design of MINERVA requires the use of AC current transformers (ACCT). To guarantee acceptable performance of the pre-digitized signal across the readout chain, this procurement therefore concerns the supply of the ACCTs along with their necessary cables and calibrated analog front-end electronics (AFEs).
Contact
aanbestedingen@sckcen.be- Result · PrequalificationType
- Arr. TurnhoutLocation
- 31643000Main codeParticle accelerators
- 31643100Linear accelerators38400000Instruments for checking physical characteristics38410000Metering instruments