Find

  • All tenders
All tenders: Poland/Bechtel Polska Sp. z o.o./Civil Earthwork - Shoring of Excavation (SOE), Soil Improvement - Design and Construction (Design-Build)

Civil Earthwork - Shoring of Excavation (SOE), Soil Improvement - Design and Construction (Design-Build)

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jun 5,Expired
Agreement
Framework agreement

Brief

Bechtel Polska Sp. z o. o. needs design-build services for civil earthwork, specifically Shoring of Excavation (SOE) and Soil Improvement (SI), for the Poland Nuclear Power Plant. This work involves designing and constructing shoring walls and soil improvement for major excavations, including power block structure foundations and portals for seaward tunnels, in complex ground conditions with significant depth (exceeding 30m) and artesian groundwater pressure. The scope includes design, detailed construction drawings, material procurement, construction, survey-layout, and instrumentation and monitoring. The contract is a framework agreement. Suppliers must have documented, proven experience in successful design-build SOE/SI work on large projects in difficult ground conditions, demonstrate the ability to provide sufficient equipment and crews, and have an acceptable safety record and compliance with quality requirements, including current ISO 9001 certification.

Anleggs- og infrastrukturbygging

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Bechtel Polska Sp. z o.o.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • 1. Bechtel Polska seeks qualified experienced subcontractors for major civil earthwork specific to the major excavations required for power plant structures. This work involves shoring of excavation (SOE) for power plant power block structure foundations, advanced to significant depth exceeding 30m in complex ground conditions that include water bearing sand and artesian groundwater pressure. Other main power-plant structure excavations include shoring walls to be used as portals for seaward tunnels supplying/discharging cooling water for the power plant, and deep seepage cut-off walls in excess of 40m. The SOE work is to be performed at the project location for the Poland Nuclear Power Plant. Associated soil improvement (SI) required as part of the SOE system, tunnel boring machine launch and other soil improvement necessary to support loads adjacent to the excavation is also included. The work will be design-build requiring engineering design of shoring walls and soil improvement to required codes and standards, and upon approval of design, construction of the shoring system for several main power-plant structures. The scope of work includes, but is not limited to: • Design of shoring walls. Design will be in accordance with the codes and standards identified in the tender package. • Preparation of detailed construction drawings for the shoring system/soil improvement submitted for: o Approval by Bechtel Polska o Permit application/acquisition o Coordination with Owner and Permit/Regulator Authority • Preparation of submittals for approval of proposed materials, and of construction means and methods o Submittal of execution plan and schedule meeting the overall project schedule • Preparation of shop drawings as required for approvals and material fabrication/procurement • Procurement of required materials for construction of the shoring system/soil improvement • Construction of the shoring system/soil improvement in the field in accordance with: o Bechtel Polska’s requirements for subcontractors performing work on the project site, including the project safety plan and requirements regarding work hours o Subcontractor’s approved safety plan o Subcontractor’s approved quality plan o Coordination with and direction from Bechtel Polska in the field o Coordination with other subcontractors performing related work on excavation, backfilling, dewatering, and tunneling • Construction work for the SOE will require survey-layout of the work, and the other requirements as established by the work scope in the tender package, e.g. conformance with the site plan for construction stormwater/erosion-sediment control • Instrumentation and Monitoring- Shoring walls will include instrumentation for monitoring of movements during excavation. The tender package will include details on requirements for such instrumentation, e.g. inclinometers, vibrating wire piezometers to be installed in the shoring wall Design-build of the shoring/soil improvement works includes providing all required tools, equipment, labor, supervision, technical and professional services, materials, consumables, and supplies required to complete required excavation shoring/soil improvement. The detailed scope of work will be outlined in the tender package documents, including technical specifications, geotechnical data for use in design, and other contractual materials provided to the Company. Details such as environmental controls/requirements/restrictions, site access, laydown space, construction water/power, job trailer accommodation will be addressed in the tender package. Interested parties shall have documented, proven experience in successful design-build SOE/SI work on large projects in difficult ground conditions. Subcontractors that will be considered must demonstrate ability to provide equipment and crews of sufficient type and number; and proven experience with all required quality, safety and execution documentation related to completion of the work. Interested companies must register/update their Company's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select Commodity Code CE00 as their specific area of interest. Bechtel shall provide the interested party the Poland Prequalification Questionnaire where interested party would complete with response to Bechtel for review. Bechtel notes that previous proven work of similar scale and complexity (which includes completion of comparable design-build of SOE/SI in complex ground conditions) will be mandatory. Pre-qualification will include evaluation of bidders’ comparable experience on previous similar projects. Bechtel notes that previous proven work of similar scale and complexity (which includes completion of comparable design-build of SOE/SI in complex ground conditions) will be mandatory. Pre-qualification will include evaluation of bidders’ comparable experience on previous similar projects. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in furnishing SOE/SI design-build scope in the past or current projects which is equivalent or equal to the complexity of the Poland AP 1000 project, (ii) availability of new or like new rig equipment in performance of scope, (iii) acceptable safety record and compliance to quality requirements including current ISO 9001 certification, (v) compliance to certification of legally mandatory requirements, (vi) financial standing (solvency), and (vii) organizational capabilities.

  • Contact

    aakorkos@bechtel.com
  • Type
    Competition · Framework agreement · Prequalification
  • Location
    Gdański
  • Main code
    Excavating and earthmoving work
    45112000

Similar active competitions

  • Bechtel Polska Sp. z o. o.

    Anleggs- og infrastrukturbygging

    Civil Construction and General Support Services

    1. Experienced and Qualified General Construction Contractors are invited to provide general construction and site support services at the project location for the Poland Nuclear Power Plant. The General Contractor shall be responsible for completing all aspects of the scope of work including, but not limited to, providing all necessary tools, equipment, labor, supervision, professional services, materials, consumables, and supplies in order to complete the following works: • Site grading for exploratory locations, maintaining surface water drainage paths, providing stable working platforms for rigs and equipment, providing and maintaining all on-site access paths for movement of drill rigs and support vehicles until the completion of field work; • Completing initial and as-built survey of investigation locations; • Backfilling the completed subsurface investigation points with cement/bentonite/grout, disposal of drill cuttings and fluids; • Maintaining the project compound (including janitorial services) and other facilities (including repairs) to ensure they remain operational, and providing additional facilities (if necessary); • Responsible for all waste disposal including general construction materials and office generated waste; • Providing support services for Subsurface Investigations activities such as: supply of fresh and potable water, supply of fuel, delivery of materials from the warehouse, relocation, reinstallation, decommissioning, repairs and maintenance of site and rig facilities; • Providing occupational health and medical services on site, including staffing licensed medical personnel, providing occupational medical care, and managing emergency care with evacuation capabilities. Responsibilities include establishing and managing a mobile fully licensed medical facility in Poland, supplying necessary pharmaceuticals and medical equipment, maintaining an electronic medical records system compliant with Polish privacy laws, and conducting drug and alcohol testing per site policies. Also providing emergency response vehicles, a mobile first aid clinic with advanced life support capabilities, and staff with advanced trauma and occupational health training. • Provide a comprehensive Health, Safety and Environmental Programme for site-wide geotechnical investigation work, including plans, procedures, training and qualified safety personnel. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the Subcontractor within the Request of Quotation.

    Qualification system
    Jul 23, 2028(100+ days)
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Anleggsmaskiner og utstyr

    Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps (based on European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The pumps, which will circulate brackish Baltic Sea water to remove heat from main condensers, must have a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing on the pumps.

    Competition
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Anleggsmaskiner og utstyr

    CDS Condensate Pumps

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, manufacturing, and delivery of nine vertical deepwell, multi-stage centrifugal condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The equipment, including drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services, must be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. The project location is Gdański. Suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project.

    Competition