Ireland: Tenders/Limerick Twenty Thirty DAC/Cleeves Riverside Quarter Phase 1 Stabilisation and Repair Works (Flaxmill)

Cleeves Riverside Quarter Phase 1 Stabilisation and Repair Works (Flaxmill)

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Feb 26, 2025Expired
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€4M

Brief

The project involves the stabilisation, consolidation, and repair of the listed historic Flaxmill building, constructed in 1853. Key works include full encapsulation scaffolding around and over the building’s perimeter to facilitate repairs safely and effectively. The project also encompasses masonry repair, roof reconstruction as a warm roof, removal of asbestos materials, and the preservation of historical features such as through-wall vents and Roman cement render. Additional works include the repair of the second-floor structural deck, remediation of cast iron gutters and parapets, and reinstatement of historically blocked windows. All works aim to reinstate the building to a shell state while maintaining its heritage integrity, adhering to strict conservation standards. Contractors are to adhere to the buildings protection status and importance.

Anleggs- og infrastrukturbygging

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Limerick Twenty Thirty DAC

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The project involves the stabilisation, consolidation, and repair of the listed historic Flaxmill building, constructed in 1853. Key works include full encapsulation scaffolding around and over the building’s perimeter to facilitate repairs safely and effectively. The project also encompasses masonry repair, roof reconstruction as a warm roof, removal of asbestos materials, and the preservation of historical features such as through-wall vents and Roman cement render. Additional works include the repair of the second-floor structural deck, remediation of cast iron gutters and parapets, and reinstatement of historically blocked windows. All works aim to reinstate the building to a shell state while maintaining its heritage integrity, adhering to strict conservation standards. Contractors are to adhere to the buildings protection status and importance.

  • Contact

    info@limerick2030.ie
  • Type
    Competition · Prequalification
  • Location
    Mid-West
  • Main code
    Engineering works and construction works
    45220000
  • 45212350Buildings of particular historical or architectural interest45223220Structural shell work45261100Roof-framing work45261320Guttering work45261410Roof insulation work45262100Scaffolding work45262522Masonry work45262660Asbestos-removal work45262690Refurbishment of run-down buildings45454100Restoration work

Similar active competitions

  • Louth County Council_381

    Refurbishment and Adaptive Re-use of West Gate House and Drogheda Youth Development Building

    Louth County Council needs refurbishment and adaptive re-use works at West Gate House and the Drogheda Youth Development Building in Drogheda, Ireland, over 16 months, with a maximum total contract value of €9.9 million. The project includes conservation and repair of the protected structure, improved accessibility and inclusion, and construction of a new extension.

    Competition with qualification
    Dec 7, 2026(15 days)
    €9,900,000
  • Office of Public Works (OPW)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Procurement of Works Contractor (Including PSCS) for Conservation and Adaptation of 14-17 Moore St, Dublin 1 and provision of New Visitor Facility at 8-9 Moore Lane, Dublin 1

    The Office of Public Works needs a works contractor, including the role of Project Supervisor Construction Stage (PSCS), for a 14-month project in Dublin. The works comprise the conservation and adaptation of 14–17 Moore Street and the provision of a new visitor facility at 8–9 Moore Lane.

    Competition with qualification
    Nov 23, 2026(1 day)
    €0
  • Office of Public Works (OPW)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    National Centre for Research and Remembrance | Phase 3-B Main Works | Main Contractor and Project Supervisor Construction Stage (PSCS)

    The Office of Public Works (OPW) seeks a main contractor and Project Supervisor Construction Stage (PSCS) to deliver the 24-month Phase 3B main works for the National Centre for Research and Remembrance in Dublin. The project includes converting and conserving the former convent and laundry into a research and remembrance centre with archival storage, exhibition and conservation spaces; constructing a new educational facility; and conserving and extending community family and parenting support facilities, including works to the protected Scots Church façade. Associated landscaping, access, bicycle parking, site infrastructure and related works are also included. The notice lists a maximum total contract value of €1, which appears to be a placeholder rather than a meaningful project estimate.

    Competition with qualification
    Dec 17, 2026(25 days)
    €1