Limerick Twenty Thirty DAC
Georgian Buildings Redevelopment Project, Opera Square Development, Limerick
Limerick Twenty Thirty DAC needs Architect-Led Integrated Design Team services for the residential redevelopment, refurbishment, and adaptation of 9 Georgian Buildings and an optional limited restoration/remediation scope for Quins Bar at 9 Ellen Street at the Opera Square Development in Limerick City. The AIDT shall comprise Architecture (including Conservation Architect, Assigned Certifier, PSDP, and other specialist design services), Civil and Structural Engineering, Mechanical/Plant Engineering, Electrical Engineering, and Fire/DAC Consultancy Services. The Architect will act as AIDT Lead/Team Leader and lead designer. The services are to be delivered in the Mid-West region of Ireland.
Architect Led Single Point Design Team for multidisiplinary design team services for Lands at Attyflin, Patrickswell, Co. Limerick
Limerick Twenty Thirty DAC needs an Architect Led Single Point Design Team to provide multi-disciplinary design team services for lands at Attyflin, Patrickswell, Co. Limerick, over 15 months, with a maximum total value of 1,000,000 EUR. The services include a Masterplan for the proposed Variation for the Limerick Development Plan (Lot 1) and Design and Planning services for Phase 1 Development (Lot 2). The project location is Mid-West.
Cleeves Riverside Quarter - Engineer Led Design Team Services - Site Activation Works
Limerick Twenty Thirty DAC needs Engineer Led Single Point Design Team Services for the delivery of the Phase II (a) - Site Activation Works as part of the overall Cleeves Riverside Quarter development, with a maximum total value of 400,000 EUR over 43 months. The project is infrastructure-focused, aiming to unlock development, particularly for designated housing development zones at Salesians, Stonetown Terrace, Quarry PBSA, and O’Callaghan Strand. The services include a coordinated package of demolitions, public realm and critical infrastructure pertaining to water supply, wastewater and surface water, utilities, flood protection, and transport infrastructure, also considering listed buildings within the site.
Framework Agreement for the Provision of Prefabricated Modular Volumetric Short or Medium Term Residential Accommodation
Limerick Twenty Thirty DAC has cancelled the competition for a framework agreement for the provision of prefabricated modular volumetric short or medium term residential accommodation, which was intended to have a maximum total contract value of 1,000,000 EUR and a duration of 4 years. The cancellation was due to "Other" reasons, after receiving 18 bids.
Property Management Services for Lot 1: Opera Square Estate and Lot 2: One Opera Square for Limerick Twenty Thirty Strategic Development DAC
The services to be provided in response to this competition will be provided in two separate Lots. Each Lot will be the subject of a separate contract. The details of each Lot are as follows; - Lot 1: Opera Square Estate The contract for Lot 1 will be with Opera Square Management Company Ltd, an owner management company. Lot 1 comprises the common areas of the Opera Square Development and include a service yard, shared basement, basement carpark and the surface areas / public realm for the new Central Plaza and Granary Courtyard. - Lot 2: One Opera Square Office Building The contract for Lot 2 will be with Limerick Opera Investment Limited Partnership. One Opera Square is the first building that is being constructed in the Opera Square development and is a 5-storey office building with 3 retail units at ground floor level. It is envisaged that the office building will be multi-tenanted and a service charge regime will be required to maintain the common parts of One Opera Square.
Cleeves Riverside Quarter Phase 1 Stabilisation and Repair Works (Flaxmill)
The project involves the stabilisation, consolidation, and repair of the listed historic Flaxmill building, constructed in 1853. Key works include full encapsulation scaffolding around and over the building’s perimeter to facilitate repairs safely and effectively. The project also encompasses masonry repair, roof reconstruction as a warm roof, removal of asbestos materials, and the preservation of historical features such as through-wall vents and Roman cement render. Additional works include the repair of the second-floor structural deck, remediation of cast iron gutters and parapets, and reinstatement of historically blocked windows. All works aim to reinstate the building to a shell state while maintaining its heritage integrity, adhering to strict conservation standards. Contractors are to adhere to the buildings protection status and importance.
Expression of Interest for Operator for Grove Island Swimming Pool and Leisure Centre, Grove Island, Corbally, Limerick on behalf of Limerick City and County Council
Limerick City and County Council are interested in seeking Expressions of Interest from a suitable qualified company [applicant] to operate manage, and maintain the leisure centre in Grove Island Pool and Leisure Centre, Grove Island, Corbally, Limerick. Grove Island Pool and Leisure Centre facility consists of an indoor 25m swimming pool, small children's pool, heated baby pool, sauna and steam room, indoor basketball court, changing village reception area and gym facility. The leisure centre is owned by: Limerick City and County Council.
DESIGN, SUPPLY, BUILD AND CERTIFICATION OF TURNKEY PREFABRICATED MODULAR RESIDENTIAL UNITS
The design supply and build of prefabricated modular units to replace and in lieu of 8 person tented accommodation including all associated sanitary facilities, site preparation and civil and electrical works at Columb Barracks, Mullingar, Co. Westmeath.
Opera C Library Book Sorter Tender
Tender Competition to appoint a Reserved Specialist for Project Opera Contract C Parcel 3A Library Book Sorter. The works include but are not limited to the supply, installation, commissioning and warranting of a complete automatic book return / retrieval and bulk separator system within the public library space at the Project Opera Limerick site. The book sorter is to connect basement to ground floor level via an inclined conveyor at basement level and horizontal conveyor at ground floor. One internal kiosk is to be provided at ground level floor mounted in a partition while one external book return kiosk is to be provided at ground level floor mounted in the façade. A seven-bin book sorter and one staff return at basement is also to be provided for.
Expression of Interest for an Operator for Askeaton Pool and Leisure Centre on behalf of Limerick City and County Council
Limerick City and County Council are interested in seeking Expressions of Interest from a suitable qualified company [applicant] to operate manage, and maintain the leisure centre in Askeaton Pool and Leisure Centre Askeaton, Co. Limerick. Askeaton Pool and Leisure Centre facility is located on the River Deel at The Green, Askeaton, County Limerick and comprises of an indoor 25m swimming pool, small children's pool, sauna and steam room, changing village, reception area and gym facility.