Search
  • Search


Ireland: Tenders/Waterways Ireland_225/Clonmel Garda District HQ - Reserved Specialist - Electrical
  1. Competition notice published

    May 28, 2024 12:09 PMMay 28, 2024 12:09 PM
  2. Qualification deadline

    Not stated
  3. Tender submission deadline

    Jun 28, 2024 11:00 AMJune 28, 2024 11:00 AM

Brief

Clonmel Garda District HQ - Reserved Specialist - Electrical

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jun 28, 2024Expired
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€1

Brief

The proposed development comprises a new Garda District HQ building, a new ancillary building with plant and stores, a secure car parking area and a secure courtyard yard. The site is recorded on Tipperary County Council’s Record of Protected structures, and contains a number of entries of regional significance in the National Inventory of Architectural Heritage. It is a Protected Structure under the Clonmel and Environs Development Plan 2013-2019. RPS Reference 68 (Military Barracks Complex) and RPS Reference 69 (Main entrance gateway). The existing stone wall onto Dillon Street forms part of the Military Barracks Complex Protected Structure and its retention and consolidation as required as the Western site boundary will need to be integrated into the overall site works. The main building will range from 2 to 3 to 4 storeys in height. The finished floor level will be plus 20.50m to take account of the site’s flood risk potential with an additional 500mm freeboard to account for climate change. The development will necessitate the demolition and removal of 5 no. existing accommodation structures, as well as 10-15 no. trees. It will also involve the relocation of an existing Boar War Memorial on the subject site. The development will include soft and hard landscaping measures at the site. The stone wall currently forming the boundary to the west of the site will be retained and softened with planting. Connections will be made to the existing public water and sewer systems, which are already well established on site. The construction phase 33 months.

Elektrisk infrastruktur og veibelysning

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Waterways Ireland_225

From the notice

  • The proposed development comprises a new Garda District HQ building, a new ancillary building with plant and stores, a secure car parking area and a secure courtyard yard. The site is recorded on Tipperary County Council’s Record of Protected structures, and contains a number of entries of regional significance in the National Inventory of Architectural Heritage. It is a Protected Structure under the Clonmel and Environs Development Plan 2013-2019. RPS Reference 68 (Military Barracks Complex) and RPS Reference 69 (Main entrance gateway). The existing stone wall onto Dillon Street forms part of the Military Barracks Complex Protected Structure and its retention and consolidation as required as the Western site boundary will need to be integrated into the overall site works. The main building will range from 2 to 3 to 4 storeys in height. The finished floor level will be plus 20.50m to take account of the site’s flood risk potential with an additional 500mm freeboard to account for climate change. The development will necessitate the demolition and removal of 5 no. existing accommodation structures, as well as 10-15 no. trees. It will also involve the relocation of an existing Boar War Memorial on the subject site. The development will include soft and hard landscaping measures at the site. The stone wall currently forming the boundary to the west of the site will be retained and softened with planting. Connections will be made to the existing public water and sewer systems, which are already well established on site. The construction phase 33 months.

  • Contact

    clonmelgs@opw.ie
  • Type
    Competition · Prequalification
  • Main code
    Electrical installation work
    45310000

Similar active competitions

  • Tipperary County Council

    Installasjon og vedlikehold av ventilasjonsanlegg

    1300m of 2.4m Height Palisade fencing at Ard Gaoithe Clonmel

    Tipperary County Council needs works to supply and install 1,300 metres of 2.4-metre-high palisade fencing at Ard Gaoithe, Clonmel. The project is located in Ireland’s Mid-West region, has a duration of 1 month and a maximum total contract value of €200,000.

    Competition
    Dec 7, 2026(18 days)
    €200,000
  • Fiosrú - Office of the Police Ombudsman

    Bil- og motorvognstjenester

    Electrical Services

    Fiosrú – the Office of the Police Ombudsman needs electrical repair and maintenance services for its Dublin and Cork offices through a single-supplier framework agreement lasting 1 year, with up to three 1-year extensions (1+1+1+1), for a maximum total value of €105,000. Services may occasionally also be required at the Longford office; the framework is divided into separate Dublin and Cork lots.

    Framework agreement
    Dec 7, 2026(18 days)
    €105,000
  • City of Dublin Education and Training Board

    Elektrisk infrastruktur og veibelysning

    Ballyfermot FET College South Campus – Emergency Electrical Upgrade and Fire Improvement Works - Phase 1

    City of Dublin Education and Training Board requires emergency electrical upgrade and fire improvement works at the operational Ballyfermot Further Education College South Campus in Dublin, under a 2-year contract with a maximum total value of €3 million. The works include phased electrical strip-out and rewiring; replacement of electrical distribution, lighting, fire alarms, ICT and Wi-Fi infrastructure, CCTV, access control and lightning protection; and fire compartmentation, fire stopping, fire doors and associated builders’ work, testing, commissioning, certification and reinstatement of finishes. Delivery must be phased to keep the College operating while maintaining life-safety systems, emergency routes and essential services.

    Competition
    Nov 27, 2026(8 days)
    €3,000,000