Find

  • All tenders
All tenders: Austria/EBG MedAustron GmbH/Complete proton injector system for the MACAP project

Complete proton injector system for the MACAP project

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jun 16Expired
Procedure
With negotiationTwo stages
Agreement
Buying goodsuntil Nov 2028

Brief

EBG MedAustron GmbH needs a complete proton injector system (from source to medium energy beam transfer line - MEBT) for the MACAP project. This procurement is for supplies and aims to expand and further develop the existing facility in Wiener Neustadt, Austria, with a new proton synchrotron particle accelerator. The purpose of this pre-announcement is to explore the market and obtain non-binding feedback on feasible concepts.

Medical and Laboratory Equipment

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at EBG MedAustron GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The Contracting Authority intends to expand and further develop the existing facility in Wiener Neustadt with a new proton synchrotron particle accelerator that is being developed in scope of the MACAP project. The purpose of this expression of interest is to explore the market and obtain non-binding feedback on feasible concepts for a complete proton injector system (from source to medium energy beam transfer line - MEBT).

  • Contact

    Pelzmann Gall Größ Rechtsanwälte GmbH (EY Law), att RA Mag. Ulrike Sehrschönulrike.sehrschoen@eylaw.at
  • Type
    Competition · Prequalification
  • Location
    Niederösterreich-Süd
  • Main code
    Particle accelerators
    31643000
  • 33151000Radiotherapy devices and supplies

Similar active competitions

  • SCK•CEN

    Electrical equipment and lighting

    Beam Loss Monitors (BLMs) for the NC Linac

    SCK•CEN needs beam loss monitor supplies for the MYRRHA Phase I (MINERVA) 100 MeV proton linear accelerator, over a 3-year contract. The equipment is intended for the NC Linac and will be delivered in the Turnhout district of Belgium.

    Competition
    Dec 2, 2026(4 days)
  • SCK•CEN

    Electrical equipment and lighting

    Beam Loss Monitors (BLMs) for the SC Linac

    SCK•CEN needs beam loss monitors (BLMs) for the 100 MeV proton linear accelerator in MYRRHA Phase I (MINERVA), with a 3-year contract for delivery in the Turnhout district of Belgium. The monitors will be used with the superconducting linear accelerator (SC Linac).

    Competition
    Dec 2, 2026(4 days)
  • Paul Scherrer Institut (PSI)

    Magnet mit horizontaler Feldausrichtung und extrem breitem Strahlzugang für Neutronenstreuexperimente

    Paul Scherrer Institute (PSI) needs a custom high-field magnet system for neutron-scattering research at the Swiss Spallation Neutron Source (SINQ), to be installed in Aargau, Switzerland. The system must provide a maximum horizontal field strength of 6 T and at least 315° of cumulative horizontal beam access, with asymmetric openings allowing use across SINQ instruments. It is to be optimized for intensity mapping with large-area position-sensitive detectors on the CAMEA spectrometer and DMC and ZEBRA diffractometers.

    Competition
    Dec 22, 2026(24 days)