Concession for the Design, Construction, Operation, Maintenance, and Decommissioning of an Offshore Floating Wind Farm for Renewable Energy Supply
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Deadline
- Jun 6, 2025Expired
- Agreement
- Construction work
- Estimated value
- €1.1B
Brief
The scope of the Project is to award Contracts through this Competitive Dialogue Process whereby the Concessionaire shall be responsible for the design, construction, operation, maintenance, and decommissioning of an offshore Floating Wind Farm for renewable energy supply, in an area at sea which is beyond the territorial waters of Malta (i.e. 12 nautical miles) and which shall be within an area to be declared by Malta as its Exclusive Economic Zone (EEZ). Decommissioning of the Floating Wind Farm will also be included in the final Contract. The Concessionaire shall also be responsible for the design, construction, operation and maintenance of the offshore substation and export cable system, which shall be owned by the GOM. The Competitive Process will involve three (3) stages/cycles: Cycle 1 is the Preliminary Qualification Questionnaire (PQQ), Cycle 2 is the Invitation to Participate in Dialogue (ITPD) and Cycle 3 is the Best and Final Offer (BAFO).
Elektrisitet og energiforvaltning
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Msida Local Council
From the notice
The scope of the Project is to award Contracts through this Competitive Dialogue Process whereby the Concessionaire shall be responsible for the design, construction, operation, maintenance, and decommissioning of an offshore Floating Wind Farm for renewable energy supply, in an area at sea which is beyond the territorial waters of Malta (i.e. 12 nautical miles) and which shall be within an area to be declared by Malta as its Exclusive Economic Zone (EEZ). Decommissioning of the Floating Wind Farm will also be included in the final Contract. The Concessionaire shall also be responsible for the design, construction, operation and maintenance of the offshore substation and export cable system, which shall be owned by the GOM. The Competitive Process will involve three (3) stages/cycles: Cycle 1 is the Preliminary Qualification Questionnaire (PQQ), Cycle 2 is the Invitation to Participate in Dialogue (ITPD) and Cycle 3 is the Best and Final Offer (BAFO).
Contact
contracts.meer@gov.mt- CompetitionType
- MaltaLocation
- 45000000Main codeConstruction work
- 31121300Wind-energy generators31121320Wind turbines31121330Wind turbine generators31121340Wind farm45251160Wind-power installation works50000000Repair and maintenance services51000000Installation services (except software)65300000Electricity distribution and related services65400000Other sources of energy supplies and distribution71000000Architectural, construction, engineering and inspection services76000000Services related to the oil and gas industry