Search
  • Search


Ireland: Tenders/Office of Public Works (OPW)/Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
  1. Competition notice published

    Apr 30, 9:34 AMApril 30, 2026 9:34 AM
  2. Change in competition

    May 21, 12:25 PMMay 21, 2026 12:25 PM
  3. Supplier selection

    Sep 8, 12:00 AMSeptember 8, 2026 12:00 AM
  4. Contract signed

    Sep 8, 12:00 AMSeptember 8, 2026 12:00 AM
  5. Result notice published

    Oct 15, 9:12 AMOctober 15, 2026 9:12 AM

Brief

Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick

Awarded

The competition has ended and a winner has been selected.

Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€0over 25 months

Brief

The Office of Public Works (OPW) has entered into an agreement with BTY Ireland Ltd. for the delivery of Construction Programme Analyst services for a proposed 14-storey Office Building at Bank Place, Opera Square, Limerick. The services will be delivered in Dublin over a period of 25 months, with a final contract value of 53,500 EUR. Six bids were received for this contract.

Arkitekttjenester

Result

TED
  • BTY Ireland Ltd.
    Winner
  • Number of bids
    6
  • Contract value
    €53,500

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Most Economic Advantageous Tender

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Office of Public Works (OPW)

From the notice

  • Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick

  • Contact

    Marc.Jago@opw.ie
  • Type
    Result
  • Location
    Dublin
  • Main code
    Architectural, construction, engineering and inspection services
    71000000
  • 71210000Advisory architectural services71242000Project and design preparation, estimation of costs71248000Supervision of project and documentation

Similar active competitions

  • Office of Public Works (OPW)

    Rådgivende ingeniørtjenester for bygg og anlegg

    Consultant Quantity Surveying Services Monitoring Shell and Core Works, and Full (CWMF Stages i to v Services) for FitOut, Parcel 5, Project Opera, Limerick

    The Office of Public Works (OPW) needs Consultant Quantity Surveying Services for monitoring Shell and Core Works, and Full (CWMF Stages i to v Services) for FitOut, Parcel 5, Project Opera, Limerick, for a duration of 49 months. The services are to be delivered in Dublin.

    Competition
    Dec 8, 2026(31 days)
    €0
  • Office of Public Works (OPW)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Procurement of Works Contractor (Including PSCS) for Conservation and Adaptation of 14-17 Moore St, Dublin 1 and provision of New Visitor Facility at 8-9 Moore Lane, Dublin 1

    The Office of Public Works (OPW) needs a works contractor, including the role of Project Supervisor Construction Stage (PSCS), for a 14-month project in Dublin. The works comprise conserving and adapting the buildings at 14–17 Moore Street and providing a new visitor facility at 8–9 Moore Lane.

    Competition with qualification
    Nov 12, 2026(5 days)
    €0
  • Limerick Twenty Thirty DAC

    Arkitekttjenester

    Georgian Buildings Redevelopment Project, Opera Square Development, Limerick

    Limerick Twenty Thirty DAC needs Architect-Led Integrated Design Team services for the residential redevelopment, refurbishment, and adaptation of 9 Georgian Buildings and an optional limited restoration/remediation scope for Quins Bar at 9 Ellen Street at the Opera Square Development in Limerick City. The AIDT shall comprise Architecture (including Conservation Architect, Assigned Certifier, PSDP, and other specialist design services), Civil and Structural Engineering, Mechanical/Plant Engineering, Electrical Engineering, and Fire/DAC Consultancy Services. The Architect will act as AIDT Lead/Team Leader and lead designer. The services are to be delivered in the Mid-West region of Ireland.

    Competition with qualification
    Nov 6, 2026(0 days)