Vattenfall AB Procurement Heat Sweden needs mechanical engineering installation work for the replacement of convection parts (boiler tubes) for Unit 1 in the Uppsala Waste incineration plant in Uppsala, Sweden, with a maximum total value of 25 million SEK. The project involves replacing pressure vessel parts (convection parts) in the horizontal pass (three evaporator bundles and one economizer) of Unit 1, to be carried out during the summer overhaul in July/August 2027. There is an option to also include the replacement of the membrane walls surrounding the horizontal passes. The contractor will be responsible for designing, manufacturing, and installing the new tubes, adapting them to modern criteria. Additionally, the scope includes a new soot cleaning system for the convection parts, requiring the removal of the old rapping system and replacement with a modern one. Sumitomo SHI FW likely has a similar contract today.
Mekaniske installasjoner
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Vattenfall AB Procurement Heat Sweden
From the notice
LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler. This procurement concerns replacement of the convection parts in the horizontal pass (three evaporator bundles and one economizer) of Unit 1, to be carried out during summer overhaul July/August 2027. As an option, the tenderer shall also include replacement of the membrane walls surrounding the horizontal passes. The Purchaser will supply detailed drawings of the existing tube bundles and the Contractor shall design, manufacture and install the new tubes with necessary adaptations to modern criteria for design, testing and inspection. Also included in the scope is a new soot cleaning system for the convection parts. The tenderer shall include removal and scrapping of the old rapping system and replacement with a more modern system. The basis for the design will be a visit to the site as well as boiler drawings.
Contact
inkop.fphs@vattenfall.com- Competition · PrequalificationType
- Uppsala länLocation
- 45351000Main codeMechanical engineering installation works