Brief

Electricity Supply Board has awarded GMC Utilities Group Limited the design-and-build works for the Finglas–Northwall 220 kV cable replacement project in Dublin. The award was based on cost and quality, and three bids were received.

Vei- og kabeltrekking

Result

TED
  • GMC Utilities Group Limited
    Winner
  • Number of tenders received
    3
  • Contract value
    €0

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Per tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Per tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Finglas Northwall 220kV Cable Replacement Project - Design and Build Works

  • Contact

    networkscontractorprocurement@esb.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Installation of cable infrastructure
    45314300

Similar active competitions

  • Electricity Supply Board ( ESB )

    Vei- og kabeltrekking

    Works associated with the Design and Build of Major HV Cable Projects

    Works associated with the Design and Build of Major HV Cable Projects

    Qualification system
    Jun 4, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    Geotekniske undersøkelser

    Networks Site Investigations Qualification System

    Networks Site Investigations Qualification System

    Qualification system
    Jan 15, 2028(100+ days)
  • Electricity Supply Board ( ESB )

    Elektroinstallasjon i bygninger

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Qualification system
    May 30, 2027(100+ days)