Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland
- Deadline
- May 30, 2027192 days left
- Agreement
- Construction work
Brief
Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland
Elektroinstallasjon i bygninger
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Applications may be made to join the qualification system at any time.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Quality is not the only award criterion and all criteria are stated only in the procurement documents.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Electricity Supply Board ( ESB )
From the notice
Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland
Contact
networkscontractorprocurement@esb.ie- CompetitionType
- 45232220Main codeSubstation construction work
- 31200000Electricity distribution and control apparatus31600000Electrical equipment and apparatus31682540Substation equipment45232221Transformer substation45317200Electrical installation work of transformers51110000Installation services of electrical equipment51112000Installation services of electricity distribution and control equipment51112100Installation services of electricity distribution equipment65310000Electricity distribution