SCK CEN Stichting van Openbaar Nut has awarded tech systèmes a contract worth €225,380 for the design, supply and installation of a sampling system to monitor airborne radioactive material from the BR2 reactor stack, in the Arrondissement of Turnhout. The design study is the fixed part; purchasing, delivery and installation are conditional on approval of the study by BEL-V, budget confirmation and the authority’s decision. Installation and validation will be supervised by SCK CEN, and maintenance may be offered as an option. The award was based on price (60%), technical quality (30%) and the study-phase lead time (10%); one bid was received.
Medisinsk bildebehandlingsutstyr
Result
- tech systèmesWinner
- 1Number of tenders received
- €225,380Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
De inschrijver moet een Dun & Bradstreet rapport, Graydon rapport of een gelijkwaardig beoordelingsrapport indienen dat een risico indicator bevat waarmee de financiële gezondheid en het prestatievermogen van de onderneming duidelijk kan worden beoordeeld. Minimumeisen: De aanbestedende overheid behoudt zich het recht voor de inschrijver uit te sluiten wanneer uit dit kredietrapport blijkt dat de onderneming een onvoldoende financiële draagkracht heeft. Dit kan onder meer het geval zijn bij: een lage kredietscore of verhoogd faillissementsrisico; een negatieve betalingsgeschiedenis, zoals betalingsachterstanden of openstaande betwistingen; een hoge schuldenlast in verhouding tot de solvabiliteit; negatieve vermeldingen zoals dagvaardingen, protesten of juridische procedures; onvoldoende omzetcijfers om de opdracht behoorlijk te kunnen uitvoeren.
Documentation Requirement
Dun & Bradstreet rapport, Graydon rapport of een gelijkwaardig beoordelingsrapport.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The tenderer must have a sufficient number of qualified staff to carry out the contract properly Minimumeisen: The tenderer shall include with its tender an indication of the staff to be deployed to execute the contract (at least 2 persons). The tenderer shall indicate the diplomas held by these staff as well as their professional qualifications and experience. The personnel used must be approved by the manufacturer in order to correctly carry out the installation, maintenance and repairs. The personnel must meet the following requirements: https://www.sckcen.be/en/visiting-sck-cen#anchor-external-contractors-at-sck-cen
Documentation Requirement
An indication of the staff to be deployed to execute the contract (at least 2 persons), including diplomas, professional qualifications and experience. Documentation that the personnel is approved by the manufacturer.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Quality certificate: Iso 9001 or equivalent with a statement or evidence of equivalent quality control measures. Minimumeisen: The Candidate shall attach to its application for participation the necessary documents demonstrating that its company and its Subcontractors have : - Quality assurance/Quality control procedures (aspects of document management, quality monitoring and improvement, etc.), during fabrication phase (off site)
Documentation Requirement
Certificates (ISO, VCA, SSC, MASE, etc.) or equivalent certificates / accreditations demonstrating quality assurance/quality control procedures.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Minimumeisen: The Candidate shall attach to its application for participation the necessary documents demonstrating that its company and its Subcontractors have : - A safety strategy, during installation phase (on site)
Documentation Requirement
Certificates (ISO, VCA, SSC, MASE, etc.) or equivalent certificates / accreditations demonstrating a safety strategy.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Minimumeisen: The Candidate shall attach to its application for participation the necessary documents demonstrating that its company and its Subcontractors have : - An environmental policy, during installation phase (on site)
Documentation Requirement
Certificates (ISO, VCA, SSC, MASE, etc.) or equivalent certificates / accreditations demonstrating an environmental policy.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
A list of the most important similar contracts performed over the last 5 years. Minimumeisen: Tenderer submits at least 1 reference of similar executed assignments during the last 5 years, with contact details (more references is an added value).
Documentation Requirement
At least 1 reference of similar executed assignments during the last 5 years, with contact details.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
NDA Minimumeisen: Copy of signed NDA-document
Documentation Requirement
Copy of signed NDA-document.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Prijs
Source
No source found in the documents. Check the weight against the tender documents.
Description
Technical Properties/Quality
Source
No source found in the documents. Check the weight against the tender documents.
Description
Leadtime of the study phase
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at SCK CEN Stichting van Openbaar Nut
From the notice
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed. The installation and validation will take place under the supervision of SCK CEN. A quote for the maintenance should be provided and is considered as an permitted option
Contact
Els Vissersaanbestedingen@sckcen.be- ResultType
- Arr. TurnhoutLocation
- 33195100Main codeMonitors