Search
  • Search


    Electrical installations required for connection of Battery Energy Storage System (BESS)

    Ørsted Bioenergy & Thermal Power A/S

    Electrical installations required for connection of Battery Energy Storage System (BESS)

    1. Supplier selection

      Feb 3, 12:00 AMFebruary 3, 2026 12:00 AM
    2. Contract start date

      Feb 17, 12:00 AMFebruary 17, 2026 12:00 AM
    3. Contract signed

      Feb 19, 12:00 AMFebruary 19, 2026 12:00 AM
    4. Result notice published

      Feb 23, 7:59 AMFebruary 23, 2026 7:59 AM
    5. Contract end date

      Sep 15, 12:00 AMSeptember 15, 2026 12:00 AM

    Brief

    Denmark: Tenders/Ørsted Bioenergy & Thermal Power A/S/Electrical installations required for connection of Battery Energy Storage System (BESS)

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Feb 22,Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Construction workuntil Sep 2026

    Brief

    Ørsted Bioenergy & Thermal Power A/S har inngått en avtale med KEMP & LAURITZEN A/S om å levere elektriske installasjoner for tilkobling av et batterienergilagringssystem (BESS) ved Avedøreværket i Avedøre, Danmark, til en verdi av 9 833 637 DKK. Leveransen omfatter blant annet intern kabling for BESS, kabling mellom BESS og PCI (Point of Connection in Installation of BESS), kommunikasjonskabling, MV-kabeltermineringer, jording og lynbeskyttelsessystem, samt installasjon av kabler på broer, stiger og i grøfter, inkludert ca. 4500 meter med 11.5 kV strømkabler. Det ble mottatt 2 tilbud i konkurransen.

    Elektrisk infrastruktur og veibelysning

    Result

    TED
    • Kemp & Lauritzen A/S
      Winner
    • Number of bids
      2
    • Contract value
      DKK 9,833,637

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Ørsted Bioenergy & Thermal Power A/S

    From the notice

    • As part of the AVV Square 2.0 Project a Battery Energy Storage System (BESS) shall be installed within the perimeters of the power station Avedøreværket (AVV), located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS shall be integrated in the existing 11.5 kV system of the power station Avedøreværket with connection to the Point of Connection in Installation of BESS (PCI). The electrical installations between the BESS and the PCI shall consist of the following components and systems: a) BESS internal cabling between the BESS equipment units b) Cabling between the BESS and the PCI c) Cabling for communication between the BESS and the existing DCS (Distributed Control System) of AVV d) Cabling between BESS MV Switchgear and DCS & auxiliary power supply e) Cabling between Main MV Switchgear and transformer differential protection relay f) MV cable terminations g) Bonding system of MV cables incl. required equipment such as Earth Continuity Conductor (ECC – if required), Sheath Voltage Limiters (SVL – if required), link boxes (if required) h) Connection of cables to BESS MV switchgear i) Connection of cables to feeder for BESS connection at Main MV switchgear j) MV protection setting study and testing of MV protection system after installation k) Auxiliary Power Supply connection for BESS MV switchgear l) Earthing and bonding of systems and components m) Lightning Protection System n) Cable installation on cable bridges, ladders and trays including required installation material (cable bridges, ladders and trays, cable cleats) o) Cable installation (buried) in trenches and ducts p) The scope of supply includes provision of all cables including but not limited to approximately 4500 meters of 11.5 kV power cables - 1x800 mm² Al XLPE q) The scope of supply also includes: Installation and commissioning of the electrical installations as defined above at the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark.

    • Contact

      Senior Sourcing Manager / BIO Strategic Sourcingmiklo@orsted.com
    • Type
      Result · Prequalification
    • Location
      Københavns omegn
    • Main code
      Electrical installation work
      45310000

    Similar active competitions

    • wesernetz Bremen GmbH

      Elektrisk utstyr og belysning

      110kV-, 20kV- und 10kV-Schaltanlagen sowie Elektroinstallation

      wesernetz Bremen GmbH benötigt Lieferungen von 110-kV-, 20-kV- und 10-kV-Schaltanlagen sowie Elektroinstallationen für eine Dauer von 2 Jahren in Bremen. Die Leistungen umfassen sowohl Freiluftschaltanlagen (AIS) als auch gasisolierte Schaltanlagen (GIS), wobei ab Ende 2027 nur noch GIS-Anlagen mit einem GWP < 1000 eingesetzt werden sollen. Die Schaltanlagen sind in Doppelsammelschienentechnik ausgeführt und beinhalten vollisolierte Stromschienen, AC- und DC-Anlagen, Eigenbedarfsanlagen, Kabeltrassensysteme sowie Steuerungs-, Fernwirk- und Leittechnik. Die Elektroinstallationen umfassen sämtliche elektrotechnischen Gebäudeinstallationen nach DIN VDE 0100, einschließlich Schalter- und Steckdoseninstallationen, Leitungsverlegung, Montage von Kabelkanälen und Kabeltrassensystemen, Errichtung der Niederspannungsverteilung, Beleuchtungsinstallation, Sicherheits- und Notbeleuchtungsanlage sowie Potenzialausgleich. Schulz Systemtechnik GmbH hat heute einen ähnlichen Vertrag.

      Qualification system
      Nov 20, 2026(22 days)
    • Batterij Meerstad Noord B.V.

      Elektrisk infrastruktur og veibelysning

      Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

      Batterij Meerstad Noord B.V. in the Netherlands needs three contractors for a framework agreement over 8 years for the realization of a Battery Energy Storage System (BESS) at Energielandschap Lageland. The project involves the delivery of a functional, ready-to-use, grid-compliant, and safe battery system, with contractors responsible for design, supply, construction, system integration, testing, commissioning, and handover, as well as long-term operation and maintenance. Phase 1 includes approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029. Phase 2 involves an expansion to at least 50 MW // 200 MWh BESS around 2032/2033. Award criteria are Price (50%) and Quality (50%).

      Framework agreement with qualification
      Oct 29, 2026(0 days)
    • Electricity Supply Board ( ESB )

      Reparasjon og vedlikehold

      TR3942 - Supply and Maintenance of EV Supply Equipment and Associated BESS Integrations throughout the Republic of Ireland

      Electricity Supply Board (ESB) needs services for the supply and maintenance of EV supply equipment and associated BESS integrations throughout the Republic of Ireland.

      Qualification system
      Feb 9, 2029(100+ days)