    ESTABLISHED 2026: Qualification system for BESS (Battery Energy Storage System)

    BeGreen A/S

    ESTABLISHED 2026: Qualification system for BESS (Battery Energy Storage System)

    1. Competition notice published

      2. mars kl. 19:282. mars 2026 kl. 19:28
    2. Result notice published

      26. mars kl. 09:1226. mars 2026 kl. 09:12
    3. Contract start date

      15. april kl. 00:0015. april 2026 kl. 00:00

    Brief

    Denmark: Tenders/BeGreen A/S/ESTABLISHED 2026: Qualification system for BESS (Battery Energy Storage System)

    Cancelled

    The competition has been cancelled.

    Qualification deadline
    25. marsExpired
    Procedure
    With prequalificationTwo stages
    Agreement
    Buying goods

    Brief

    BeGreen A/S har avlyst konkurransen om et kvalifikasjonssystem for fremtidige anbud knyttet til Battery Energy Storage System (BESS) prosjekter, både frittstående og hybride, på grunn av endrede behov. Kvalifikasjonssystemet var ment å muliggjøre anskaffelse av BESS-løsninger.

    Batterisystemer og energilagring

    Result

    TED
    • Reason for cancellation
      Besluttning av oppdragsgiveren på grunn av behovsendring
    • Number of bids
      0

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      The applicant’s turnover must be at least EUR 80.000.000

      Documentation Requirement

      The applicant must provide the yearly turnover in accordance with the accounting practices applicable to the applicant from the most recent available annual report in ESPD part IV.B, ‘General yearly turnover'. The most recent available annual report refers to the report available at the time of the application deadline for the establishment of the Qualification system (or the deadlines for reopening for application or submission of updated information, cf. section 2.2 of the Instruction, Qualification System). If the applicant relies on the capacity of one or more entities (e.g., a parent company, sister company, or subcontractor) or is a group of economic operators (e.g., a consortium), information regarding ESPD part IV.B must also be provided in a separate ESPD for each of these entities, cf. section VI.3 'Additional information'. It is the applicant’s responsibility to ensure that the minimum requirement concerning turnover is met collectively through consolidation when the application is based on the capacity of other entities or if the applicant is a group of economic operators (e.g., a consortium). As documentation, BeGreen will request the most recent available annual report(s).

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      Quality/technical merit and performance of the BESS solution, including compliance, delivery and implementation approach, guarantees and service concept, as further defined in the procurement documents for each contract-specific call for tenders.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Total tender price, as further defined in the procurement documents for each contract-specific call for tenders.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at BeGreen A/S

    From the notice

    • BeGreen has established a qualification system for future tenders related to Battery Energy Storage System (“BESS”) projects both stand-alone and hybrid. The qualification system is established pursuant to Directive 2014/25/EU of 26 February 2014 (the “Utilities Directive”). It is of unlimited duration and will remain in force until BeGreen decides to terminate it. The qualification system is managed via Comdia. The qualification system is intended to enable the procurement of BESS solutions.Main features of the procedureThe tender is conducted as a restricted procedure, in which only prequalified applicants are admitted to the qualification system.

    • Contact

      Att. Procurementprocurement@begreen.dk
    • Type
      Result · Prequalification
    • Main code
      Batteries
      31440000
    • 31151000Static converters31155000Inverters31170000Transformers31214000Switchgear31430000Electric accumulators

    Similar active competitions

    • EnBW Energie Baden-Württemberg AG

      Batterisystemer og energilagring

      Qualification System for Battery Storage Systems (BSS)

      EnBW Energie Baden-Württemberg AG needs delivery and services for Battery Storage Systems (BSS).

      Qualification system
      4. mars 2029(100+ days)
    • Batterij Meerstad Noord B.V.

      Elektrisk infrastruktur og veibelysning

      Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

      Batterij Meerstad Noord B.V. in the Netherlands needs three contractors for a framework agreement over 8 years for the realization of a Battery Energy Storage System (BESS) at Energielandschap Lageland. The project involves the delivery of a functional, ready-to-use, grid-compliant, and safe battery system, with contractors responsible for design, supply, construction, system integration, testing, commissioning, and handover, as well as long-term operation and maintenance. Phase 1 includes approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029. Phase 2 involves an expansion to at least 50 MW // 200 MWh BESS around 2032/2033. Award criteria are Price (50%) and Quality (50%).

      Framework agreement with qualification
      29. okt. 2026(0 days)
    • Electricity Supply Board ( ESB )

      Qualification System for Construction of Greenfield Civil Works Projects in the Republic of Ireland

      Qualification System for Construction of Greenfield Civil Works Projects in the Republic of Ireland

      Qualification system
      31. mai 2027(100+ days)