Exhaust air measurement system for FAIR
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Feb 20,Expired
- Award
- Availability of repair service & maintenance contract, weight 5 and 3 more
Brief
FAIR - Facility for Antiproton and Ion Research in Europe GmbH needs an exhaust air measurement system to specify the composition and activity of discharge, to be delivered in Darmstadt, Kreisfreie Stadt. The system is required due to the expected amount of activity in the exhaust air. Tenders will be evaluated based on price (60%), detection limits/fulfilment of technical requirements (20%), schedule (10%), availability of repair service & maintenance contract (5%), and operating costs (5%).
Laboratorie-, optisk- og presisjonsutstyr
Previous winners
Who are you up against?
The suppliers who have won similar contracts at FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
The number of employees over the previous three years.
Documentation Requirement
Information asked for on the FAIR preprinted form, under "Company presentation".
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Price criteria for "Preis-Quotient-Methode"
Source
No source found in the documents. Check the weight against the tender documents.
Description
The bidder may offer a repair service and maintenance contract. Service and maintenance contract: yes, service guaranteed within 3 working days = 10 points Service and maintenance contract: yes, service guaranteed within 14 working days = 5 points No service or maintenance contract possible = 0 points
Source
No source found in the documents. Check the weight against the tender documents.
Description
Low detection limits & high flow rate or measuring volume/both devices well suited = 10 points Medium detection limits & high air flow rate or low detection limits and medium air flow rate/both devices at least moderately suited = 5 points High detection limits or low air flow rate or low measruring volume /at least one device unsuitable = 0 points
Source
No source found in the documents. Check the weight against the tender documents.
Description
Commissioning by the end of 2026 = 10 points Commissioning by March 2027 = 6 points Commissioning from April 2027, before July 2027 = 3 points Possible commissioning after July 2027 = 0 points
Source
No source found in the documents. Check the weight against the tender documents.
Description
The bidder estimates the operating costs incurred (consumables/labour) for their system low to no costs or effort = 10 points average costs or effort = 5 points high costs or effort = 0 points
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Due to the expected amount of activity in the exhaust air, FAIR will be required in the future to operate an exhaust air measurement system that specifies the composition and activity of the discharge.
Contact
Project procurementproekf33@gsi.de- Competition · PrequalificationType
- Darmstadt, Kreisfreie StadtLocation
- 31643000Main codeParticle accelerators
- 38433200Emission measurement equipment38940000Nuclear evaluation instruments