FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3
Awarded
The competition has ended and a winner has been selected.
FAIR - Facility for Antiproton and Ion Research in Europe GmbH has entered into an agreement with Jäger Elektrotechnik GmbH for the delivery of two power converters for the SIS100 Extraction Septum Magnets 2 and 3, located in Darmstadt, Kreisfreie Stadt, Germany. The contract has a duration of 16 months and a total value of 1,894,720 €. The power converters are required to ramp current up to 13000 A with an absolute accuracy of 100 ppm and a maximum output voltage of 100V, fed by a 20kV supply system. The award criteria prioritized quality and detail of the offer, simplicity and functionality of the technical solution, load and lifetime of power components, and mechanical design, in addition to price. Two bids were received for this contract.
Result
- Winner
- Jäger Elektrotechnik GmbH
- Number of bids
- 2
- Contract value
- €1,894,720
About the bid
- Contact phone
- +49 6159712574
- Contact email
- proekf01@gsi.de
- Address
- Planckstr. 1, 64291 Darmstadt
A new international scientific research centre facility FAIR (Facility for Antiprotons and Ion Research) is under constructed next to the existing GSI Helmholtz Centre for Heavy Ion Research. FAIR will provide antiproton and ion beams of unprecedented intensity and quality. One of the essential parts of FAIR will be the Heavy Ion Synchrotron (SIS)100. High current Extraction Septa 2 and 3 magnets are components of the SIS100, which will be powered by 2 power converters. The current in the magnets must be ramped up to 13000 A with an absolute accuracy of 100 ppm. The maximum output voltage is of up to 100V. These power converters will be feed by 20kV supply system. In Table 4.1 of the Detailed Specification, ANNEX 3, the specified maximum available installation space for the power converters is to be understood as a preliminary guideline. Deviations from this requirement may be acceptable under certain circumstances and can be discussed during the negotiation phase, if necessary.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Consideration of the price through the valuation method "Preis-Quotient-Methode"
Description
- Quality, detailing of the technical description - Level and quality of fulfilment of technical requirements - Quality, detailing of the required simulations - Detailed project planning, including schedule and resources
Description
- Topology complexity - Complexity and flexibility of the control approach - Technical effort for handling of the feedback energy
Description
Load/expected lifetime of: - Power semiconductors - Capacitors - Inductive components - Contactors Further criteria: - Energy efficiency - Reactive power - Efficiency of the cooling concept
Description
- Accessibility of the components - Effort for component replacement - Possibility of repair by one person - Interference-free construction
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Title
- FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3
- Type
- Main code
- Supplemental codes
- Location
- Darmstadt, Kreisfreie Stadt
- Duration
- 16 months
No supplemental codes from buyer…