Search

  • Search


    Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems

    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems

    1. Contract signed

      Jul 30, 12:00 AMJuly 30, 2021 12:00 AM
    2. Result notice published

      Feb 24, 4:00 PMFebruary 24, 2026 4:00 PM

    Brief

    Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Elektrisk utstyr og belysning

    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ha modificado un contrato con Gutmar S.A. para el diseño final y suministro de servicios eléctricos dentro del divertor (IDES) y el suministro de soportes dentro de la vasija (IVS) para el cableado con aislamiento mineral (MI) de los sistemas de diagnóstico de ITER. El contrato, con un valor final de 17.092.016 €, tiene una duración de 57 meses e incluye servicios de diseño, prefabricación, adquisición de hardware, fabricación, pruebas, limpieza, embalaje y entrega. Los servicios eléctricos dentro del divertor (IDES) comprenden cableado, cajas de conexiones eléctricas y conectores para sensores de diagnóstico ubicados en los casetes del divertor, requiriéndose 16 conjuntos. Los soportes dentro de la vasija (IVS) son soportes mecánicos para el cableado MI dentro de la vasija de vacío para las líneas de transmisión de varios sistemas de diagnóstico de la máquina ITER.

    Result

    Winner
    Gutmar S.A.
    Number of bids
    0
    Contract value
    €17,092,016

    About the bid

      The scope of the procedure includes design services (for In-Divertor Electrical Services (IDES) components), pre-manufacturing services, hardware procurement, manufacturing activities, testing activities, cleaning, packaging and delivery. IDES provides electrical infrastructure for diagnostic sensors located in the divertor cassettes. Such infrastructure comprises of cabling, electrical junction boxes and connectors (including a connector that will be manipulated by remote means). Overall 16 sets need to be provided. In-Vessel supports concerns various types of mechanical supports for mineral insulated (MI) cabling to be used inside the vacuum vessel in the transmission lines of various diagnostic systems of the ITER machine. Please refer to Annex B.1 (IDES Technical Specification) and Annex B.2 (IVS Technical Specification) for additional details.

      Contact name
      Laura Romano
      Contact phone
      +34933201800
      Contact email
      laura.romano@f4e.europa.eu
      Address
      C/Josep Pla, 2, Torres Diagonal Litoral, edificio B3, 08019 Barcelona

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
    Title
    Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems
    Type
    Result
    Main code
    31600000Electrical equipment and apparatus
    Supplemental codes
    31200000Electricity distribution and control apparatus
    Duration
    57 months

    Active similar competitions

    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Kjøle- og ventilasjonsteknologi

      Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle

      The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') en España necesita el diseño, fabricación, montaje, pruebas de aceptación en fábrica, transporte y entrega de un Sistema de Refrigeración de Helio (HRS) para el Sistema de Separación de Isótopos (ISS) dentro de la Planta de Tritio en ITER, basado en tecnología Reversed Turbo-Brayton. El HRS suministrará una potencia de enfriamiento neta de aproximadamente 1500 W a 18.5 K para el ISS de la Planta de Tritio de ITER. El contrato tiene una duración de 60 meses y un valor máximo total de 9.300.000 EUR. La evaluación de las ofertas se basará en el precio (50%) y la propuesta técnica (50%).

      Competition with qualificationAug 31, 2026
      Oct 9, 2026(0 days)
      €9,300,000
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Elektrisk utstyr og belysning

      Supply of the Injector for IFMIF - DONES

      The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) is planning the procurement of an Injector for IFMIF DONES, which includes its design, manufacturing, delivery, installation, and commissioning. This supply contract is expected to last 80 months.

      PlanningSep 29, 2026
      Nov 13, 2026(34 days)
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Laboratorie-, optisk- og presisjonsutstyr

      REMS Procurement and related services (Integrator)

      The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) is planning the procurement of components for the ITER Radiological and Environmental Monitoring System (REMS), including ancillary services like qualification activities and specific engineering support. Suppliers are invited to provide feedback and input to the buyer.

      PlanningSep 28, 2026
      Nov 12, 2026(33 days)
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Reisebyrå- og turisttjenester

      Provision of Project Management Services

      The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') needs project management services for a framework contract over 4 years, with a maximum total value of 14,000,000 EUR. The services are specifically related to Schedule, Cost and Risk Management, Project Controls or Performance Management and Reporting for Program and Project Teams. Deloitte Consulting SLU has a similar contract today. Offers will be evaluated based on Technical Score (60%) and Financial Score (40%).

      Framework agreementSep 29, 2026
      Oct 13, 2026(3 days)
      €14,000,000
    • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

      Kantine- og cateringvirksomhet

      Provision of Services Related to the Management and Operation of the Fusion for Energy (F4E) Cafeteria/Canteen in Barcelona

      The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') needs services related to the management and operation of their cafeteria/canteen in Barcelona for a duration of 4 years. The contract is a framework agreement for cafeteria services. Offers will be evaluated based on a technical score (60%) and a financial score (40%).

      Framework agreementSep 15, 2026
      Oct 26, 2026(16 days)