Fjenneslev Sol PV-project (FJV_SOL-EPC-PV)
Cancelled
The competition has been cancelled.
- Qualification deadline
- Feb 5, 2025Expired
- Award
- Project Proposal 25% and 4 more
Brief
HOFOR A/S har besluttet å avlyse konkurransen for Fjenneslev Sol PV-prosjektet i Centrale Zealand, Danmark, som skulle inkludere bygging av et solkraftverk med en kapasitet på 190 MWp (DC). Prosjektet var delt inn i flere kontrakter, inkludert levering og installasjon av hovedtransformatorer og EPC PV-anlegget med drift og vedlikehold. Den estimerte verdien av anbudet var rundt 810 millioner euro ekskl. mva., med en varighet på 4 år. Avlysningen skyldes en endring i behovet fra oppdragsgiverens side. Det ble mottatt to tilbud i konkurransen.
Oppføring av bygninger
Result
- Reason for cancellationDecision of the buyer because of a change in needs
- 2Number of tenders received
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Total Evaluated Price using the following; TOTAL COSTS cf. “Price List (Main Solution)” “Total sum” cf. “Change Order Prices” Any capitalization of reservations
Source
No source found in the documents. Check the weight against the tender documents.
Description
Technical solution - 60% of 25% Project Organization and Key Personnel - 25% of 25% Project Programme - 15% of 25%
Sub-criteria
- Technical solution60%
Technical solution
- Project Organization and Key Personnel25%
Project Organization and Key Personnel
- Project Programme15%
Project Programme
Source
No source found in the documents. Check the weight against the tender documents.
Description
The sub-criterion Project Terms will be evaluated based tenderer's deviations from the EPC and the O&M Agreement contractual documents.
Source
No source found in the documents. Check the weight against the tender documents.
Description
As described in the Tender Conditions.
Source
No source found in the documents. Check the weight against the tender documents.
Description
As described in the Tender Conditions.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Low carbon materials - 40% of 5% Use og Apprentices - 60% of 5%
Sub-criteria
- Use of Apprentices60%
Use og Apprentices
- Low carbon materials40%
Low carbon materials
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at HOFOR A/S
From the notice
HOFOR is to build a PV-plant at Fjenneslev in Centrale Zealand, Denmark, with the capacity of power of 190 MWp (DC). The PV-plant will be connected through a temporary grid connection expected in Q2/2026 based on Energinet’s (the public transmission operator in Denmark) standard concept for temporary grid connections and later will be transferred to the final grid connection expected in Q2/Q3 2030 at a new Energinet-owned 132 kV substation in the area. The overall Fjenneslev PV-project is divided into the following contracts: 1) Delivery of perimeter fencing and vegetation, 2) Delivery and installation of two (2) main transformers for the substation 3) EPC Substation excluding delivery of transformer, including installation of export cable 4) EPC PV plant, including PV panels and operation & maintenance (O&M) (this tender) The estimated value of the tender is around 81,000,0000 EUR (excl. VAT) including options. The tender will include the following options: • Prolongation of maintenance of the O&M Contract • Grass and vegetation management • Cleaning of all modules • Thermografic inspection of all modules The basis of the contract will be an amended version of the Yellow FIDIC book 2017. The contract(s) is expected to be awarded in February 2024 upon the completion of the tender. The tender is carried out as a negotiated procedure according to directive 2014/25/EU of the European Parliament and the Council of 26 February 2014 (The Utilities Directive) as implemented in Executive Order No. 1078 of 29 June 2022.
Contact
Mette Munch-Boutrupmetmun@hofor.dk- Result · PrequalificationType
- Vest- og SydsjællandLocation
- 45200000Main codeWorks for complete or part construction and civil engineering work