Fjernvarme Fyn Carbon Capture plant
Cancelled
The competition has been cancelled.
- Qualification deadline
- Oct 16, 2024Expired
- Award
- Price only
Brief
Fjernvarme Fyn is planning to reduce the carbon footprint from the waste to energy plant in Odense, Denmark. The tender will include an EPC contract for the entire Carbon capture plant. (Excluded Building and construction) The intention is to tender openly to the various technical solutions for technology in the capturing of CO2. Fjernvarme Fyn emits appx. 325 thousand tons of CO2 per year. 50% of the CO2 is biogenic and 50% is fossil. The CO2 is foreseen to be liquified in the carbon capture plant before transportation to an intermediate storage. The tender for the CO2 plant is expected to include carbon capture facilities, storage tanks, waste heat recovery, liquifaction- and loading facilities. Main figures for the waste to energy plant: - Incinerator 11 & 12: 2 x ~8,5 t/h, build 1995 - Incinerator 13: ~17 t/h, build 2000 - Waste: 300.000 t/y, ~50% fossil and ~50% biogenic - Power: 20 MW - Heat: 105 MJ/s
Anleggsmaskiner og utstyr
Result
- Reason for cancellationAnnet
- 0Number of bids
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Pris
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Fjernvarme Fyn Service A/S
From the notice
Fjernvarme Fyn is planning to reduce the carbon footprint from the waste to energy plant in Odense, Denmark. The tender will include an EPC contract for the entire Carbon capture plant. (Excluded Building and construction) The intention is to tender openly to the various technical solutions for technology in the capturing of CO2. Fjernvarme Fyn emits appx. 325 thousand tons of CO2 per year. 50% of the CO2 is biogenic and 50% is fossil. The CO2 is foreseen to be liquified in the carbon capture plant before transportation to an intermediate storage. The tender for the CO2 plant is expected to include carbon capture facilities, storage tanks, waste heat recovery, liquifaction- and loading facilities. Main figures for the waste to energy plant: - Incinerator 11 & 12: 2 x ~8,5 t/h, build 1995 - Incinerator 13: ~17 t/h, build 2000 - Waste: 300.000 t/y, ~50% fossil and ~50% biogenic - Power: 20 MW - Heat: 105 MJ/s
Contact
Jette Køhlerx-jek@fjernvarmefyn.dk- Result · PrequalificationType
- 45252300Main codeRefuse-incineration plant construction work
- 42120000Pumps and compressors42418900Loading or handling machinery42511110Heat pumps42511200Machinery for liquefying air or other gases42514000Machinery and apparatus for filtering or purifying gases42996000Machinery for the treatment of sewage44611400Storage tanks45251000Construction works for power plants and heating plants45251220Cogeneration plant construction work45251250District-heating plant construction work51810000Installation services of tanks