Limerick City and County Council needs design and construction works for the Croagh-to-Rathkeale section of the Foynes to Limerick Road project under an NEC4 Option C contract, with a maximum total value of €140 million and a duration of 30 months. The works in Ireland’s Mid-West and South-West include approximately 5 km of M21 motorway, 2.75 km of N69 dual carriageway, 0.65 km of N21 single carriageway, local roads and access tracks, structures, ten attenuation ponds and retaining walls. The section connects the Adare Bypass at Croagh to the existing N21 at Rathkeale and terminates near Graigeen at the R518/L1222 junction. Tenders will be assessed on price and quality under the Most Economically Advantageous Tender approach; detailed criteria are set out in the tender documents.
Vei- og gatearbeid
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Limerick City and County Council_103432
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Most Economically Advantageous Tender (MEAT) - Refer to tender documents for Award Criteria.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Most Economically Advantageous Tender (MEAT) - Refer to tender documents for Award Criteria.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Limerick City and County Council (LCCC) is seeking tenders for the Foynes to Limerick Road (including Adare Bypass) – Croagh to Rathkeale Design and Construction Contract, which will be procured under the NEC4 Option C form of Contract. The Croagh to Rathkeale Design and Construction Contract includes but is not limited to: 5.0 km of mainline carriageway (M21 Motorway), 2.75 km of mainline carriageway (N69 Type 2 Dual Carriageway), 0.65 km of mainline carriageway (N21 Type 1 Single Carriageway), 3.1 km of sideroads (approx.), 3.2 km of access tracks (approx.), Various structures (excluding specific mammal and bat underpasses), 10 No. attenuation ponds and various retaining walls. The Croagh to Rathkeale Design and Construction Contract forms part of Sections C and D of the wider Foynes to Limerick Road (Including Adare Bypass) Project. At its eastern extent, the Contract ties into the Adare Bypass in the townland of Croagh, which is currently under construction. At its western extent, it ties into the existing N21 in the townland of Rathkeale. To the north, the scheme terminates at the R518/L1222 junction in the townland of Graigeen where the future Foynes to Rathkeale element of the project will connect. A variety of Advance Works / Enabling Works have been undertaken on the site of the Foynes to Limerick Road (including Adare Bypass) – Croagh to Rathkeale Design and Construction Contract including fencing, hedge clearance, haul roads, access tracks, accommodation works, utility diversions and earthworks. The above paragraphs are a summary only and Tenderers are directed to read and formulate their Tenders based on all of the provisions of the Contract as detailed in the Tender Documents that can be found here on eTenders and in the Virtual Data Room (VDR).
Contact
procurement@midwestroads.ie- CompetitionType
- Mid-West, South-WestLocation
- 45233120Main codeRoad construction works
- 45200000Works for complete or part construction and civil engineering work45221111Road bridge construction work45233110Motorway construction works45233121Main road construction works45233124Trunk road construction work45233125Road junction construction work45233130Construction work for highways71311220Highways engineering services71322000Engineering design services for the construction of civil engineering works71322300Bridge-design services