Heat exhangers
Expired
The competition has expired without a winner being announced.
- Deadline
- May 16, 2024Expired
- Award
- Kvalitet 30%
Brief
Lappeenranta-Lahti University of Technology (LUT) is constructing an industrial scale high-temperature heat pump test facility. The aim of the research project is to bring generic knowledge and solutions that can be utilized to realize industrial scale high-temperature heat pumps where the compression is done with multi-stage high-speed centrifugal compressors. This procurement concerns the heat exchangers (one evaporator, one condenser, two suction vapour pre-heaters) for the test facility. A detailed description of the system is presented in Appendix 1.
Kjøle- og ventilasjonsteknologi
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Source
No source found in the documents. Check the weight against the tender documents.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Lappeenrannan-Lahden teknillinen yliopisto LUT
From the notice
Lappeenranta-Lahti University of Technology (LUT) is constructing an industrial scale high-temperature heat pump test facility. The aim of the research project is to bring generic knowledge and solutions that can be utilized to realize industrial scale high-temperature heat pumps where the compression is done with multi-stage high-speed centrifugal compressors. This procurement concerns the heat exchangers (one evaporator, one condenser, two suction vapour pre-heaters) for the test facility. A detailed description of the system is presented in Appendix 1.
Contact
Procurement serviceshankinnat@lut.fi- CompetitionType
- 42511100Main codeHeat-exchange units