Search
  • Search


Slovakia: Tenders/Slovenské elektrárne, a.s./Implementation of Battery Energy Storage System at Čierny Váh
  1. Competition notice published

    Oct 26, 6:16 AMOctober 26, 2026 6:16 AM
  2. Change in competition

    Nov 3, 12:48 PMNovember 3, 2026 12:48 PM
  3. Qualification deadline

    Nov 30, 10:00 AMNovember 30, 2026 10:00 AM
  4. Tender submission deadline

    Comes with the invitation

Brief

Implementation of Battery Energy Storage System at Čierny Váh

Qualification deadline
Nov 30,12 days left
Award
Price only
Procedure
With negotiationTwo stages
Agreement
Buying goodsover 1,234 days

Brief

Slovenské elektrárne, a.s. seeks an EPC contractor to design, permit, supply, install, commission and put into operation a battery energy storage system at Čierny Váh in the Žilinský Region, over approximately 1,234 days. The BESS must provide at least 480 MWh of usable capacity and 120 MW of rated power, connect to the 400 kV substation through a new 400 kV bay, and support frequency reserves, electricity-market services, frequency-response functions and island operation to maintain the pumped-storage plant’s auxiliary supply during loss of its 22 kV connection. The scope includes civil, electrical and mechanical works; battery containers, conversion and control systems, transformers, switchgear and related equipment; integration with existing plant systems; protection, monitoring, communications, fire safety and security; and testing, performance verification, operational training and documentation needed for safe, reliable operation. The contract will be awarded solely on the lowest total price excluding VAT.

Batterisystemer og energilagring

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    The lowest total price without VAT.

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Slovenské elektrárne, a.s.

From the notice

  • The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.

  • Contact

    zuzana.kosecova@seas.sk
  • Type
    Competition · Prequalification
  • Location
    Žilinský kraj
  • Main code
    Batteries
    31440000
  • 31214000Switchgear31321000Electricity power lines31321210Low-voltage cable31321300High-voltage cable45000000Construction work45255400Fabrication work71300000Engineering services71632000Technical testing services80531200Technical training services

Similar active competitions

  • Teplárna České Budějovice, a.s.

    Elektrisk infrastruktur og veibelysning

    Dodávka bateriového úložiště

    Teplárna České Budějovice, a.s. potřebuje v Jihočeském kraji dodat a namontovat bateriové úložiště s maximální celkovou hodnotou 62 milionů Kč. Zakázka zahrnuje dva bateriové kontejnery a dvě trafostanice, elektroinstalaci pro připojení úložiště a řízení jeho technologií pro poskytování podpůrných služeb výkonové rovnováhy sítě. Součástí je také zpracování a posouzení projektové dokumentace pro provádění stavby, dodávka a montáž všech projektovaných komponent a související práce a služby. Nabídky budou hodnoceny výhradně podle ceny; rozhoduje nejnižší nabídková cena bez DPH.

    Competition
    Dec 7, 2026(19 days)
    CZK 62,000,000
  • Stadtwerke Schneeberg GmbH

    Batterisystemer og energilagring

    Projektierung, Lieferung und Errichtung eines Batteriespeichersystems (BESS)

    Die Stadtwerke Schneeberg GmbH benötigt im Erzgebirgskreis die Projektierung, Lieferung, Errichtung und Inbetriebnahme eines Batteriespeichersystems (BESS) mit 3 MW Leistung und 6 MWh Kapazität einschließlich Übergabe-Trafostation. Der Auftrag hat eine Laufzeit von 18 Monaten und einen maximalen Gesamtwert von 1,9 Millionen Euro. Für die Eignung sind Eigenerklärungen zu zwei vergleichbaren Referenzobjekten sowie eine Berufshaftpflichtversicherung mit jeweils mindestens 3 Millionen Euro Deckung für Personen- und sonstige Schäden nachzuweisen. Gewertet werden der Gesamtpreis mit 60 %, der Wirkungsgrad (RTE) mit 20 % und das Degradationsverhalten mit 20 %.

    Competition
    Nov 30, 2026(12 days)
    €1,900,000
  • Energiespeicher Soltau I GmbH

    Batterisystemer og energilagring

    Schlüsselfertige Errichtung (EPC) eines netzgekoppelten Batteriespeichersystems

    Energiespeicher Soltau I GmbH benötigt die schlüsselfertige Projektierung, Lieferung, Errichtung und Inbetriebnahme eines netzgekoppelten Batteriespeichersystems mit 10–12,5 MW einschließlich Übergabe-Trafostation im Heidekreis. Die Projektlaufzeit beträgt 18 Monate. Für die Eignung sind mindestens zwei realisierte BESS-Referenzen mit jeweils mindestens 5 MW in Europa erforderlich, davon mindestens eine mit Präqualifikation für Regelreserve; Referenzen von Nachunternehmern oder des Batterielieferanten können über Eignungsleihe eingebracht werden. Bewertet werden der normierte Gesamtpreis mit 60 Prozent sowie Wirkungsgrad und Kapazitätserhalt mit jeweils 20 Prozent.

    Competition
    Dec 14, 2026(26 days)