    Jälki-ilmoitus: Pre-qualification for turnkey delivery of district heating accumulator to Kolabacken

    Fortum Power and Heat Oy

    Jälki-ilmoitus: Pre-qualification for turnkey delivery of district heating accumulator to Kolabacken

    1. Competition notice published

      Nov 1, 2023 7:16 PMNovember 1, 2023 7:16 PM
    2. Result notice published

      Feb 29, 2024 9:44 AMFebruary 29, 2024 9:44 AM

    Brief

    Finland: Tenders/Fortum Power and Heat Oy/Jälki-ilmoitus: Pre-qualification for turnkey delivery of district heating accumulator to Kolabacken

    Cancelled

    The competition has been cancelled.

    Qualification deadline
    Feb 28, 2024Expired
    Procedure
    Competitive dialogueTwo stages
    Agreement
    Buying goods

    Brief

    Fortum Power and Heat Oy wishes to obtain a turnkey delivery of a new hot water district heat accumulator of 20 000 m3. The district heat accumulator will be unpressurized steel tank type and the maximum operation temperature is 98°C. Design temperature 100°C. The top of the tank is equipped with a steam blanket blocking the air to get inside the tank. The design pressures (at the roof ) -500 Pa /+2500 Pa. The site is designed for 25,23 m wide (inner diameter) and ~40 m high steel tank. The maximum water level of water in the non-pressurized tank is 39,90 m. Tank roof is conical, 15° roof angle. Corrosion allowance1mm for wet parts. Insulation according to PSK 3707 (jacket 300 mm, roof 400 mm rock wool, convection barrier). The Supplier shall provide all necessary services (but not limited to) for the supply of specified equipment such as: - equipment design according to Eurocode and applicable standards (SFS-EN 14015, EN 13445-3, EN 1991-1-4) design of tank, including the steel structure design and insulation design - workshop drawings/design of the safety devices, diffusers and overflow pipe according to dimensional drawings/design supplied by the Client - procurement of material/equipment/devices/work - manufacturing, manufacturing supervision and quality control - scheduling and expediting - inspections, examinations and testing, with all necessary reports - cleaning, painting and coating - packing for transportation - transportation of material and equipment to the construction site - unloading - erection at the site - insulation and cladding (possible aesthetic outer surface installation is OPTION) - stairs (spiral type) and maintenance platform (> 5m2) for roof located instruments - training for operation and maintenance personnel - all necessary documentation - commissioning

    Result

    • Reason for cancellation
      Kun ett admissible tilbud, forespørsel å delta eller prosjekt er mottatt
    • Number of bids
      0

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Fortum Power and Heat Oy

    From the notice

    • Fortum Power and Heat Oy wishes to obtain a turnkey delivery of a new hot water district heat accumulator of 20 000 m3. The district heat accumulator will be unpressurized steel tank type and the maximum operation temperature is 98°C. Design temperature 100°C. The top of the tank is equipped with a steam blanket blocking the air to get inside the tank. The design pressures (at the roof ) -500 Pa /+2500 Pa. The site is designed for 25,23 m wide (inner diameter) and ~40 m high steel tank. The maximum water level of water in the non-pressurized tank is 39,90 m. Tank roof is conical, 15° roof angle. Corrosion allowance1mm for wet parts. Insulation according to PSK 3707 (jacket 300 mm, roof 400 mm rock wool, convection barrier). The Supplier shall provide all necessary services (but not limited to) for the supply of specified equipment such as: - equipment design according to Eurocode and applicable standards (SFS-EN 14015, EN 13445-3, EN 1991-1-4) design of tank, including the steel structure design and insulation design - workshop drawings/design of the safety devices, diffusers and overflow pipe according to dimensional drawings/design supplied by the Client - procurement of material/equipment/devices/work - manufacturing, manufacturing supervision and quality control - scheduling and expediting - inspections, examinations and testing, with all necessary reports - cleaning, painting and coating - packing for transportation - transportation of material and equipment to the construction site - unloading - erection at the site - insulation and cladding (possible aesthetic outer surface installation is OPTION) - stairs (spiral type) and maintenance platform (> 5m2) for roof located instruments - training for operation and maintenance personnel - all necessary documentation - commissioning

    • Contact

      jarno.vainio@fortum.com
    • Type
      Result · Prequalification
    • Main code
      Radiators and boilers
      44621000

    Similar active competitions

    • Göteborg Energi Aktiebolag

      Oppføring av bygninger

      Ackumulatoranläggning för värme och kyla

      Göteborg Energi Aktiebolag ska uppföra en kombinerad ackumulator för fjärrvärme och fjärrkyla med tillhörande teknikhus på den tidigare gasklockstomten i centrala Göteborg. Upphandlingen gäller ackumulatortank och processutrustning, med ett högsta totalt kontraktsvärde på 80 miljoner kronor. Uppdraget avser bygg- och anläggningsarbeten i Västra Götalands län.

      Competition with qualification
      Nov 16, 2026(18 days)
      SEK 80,000,000
    • Fortum Power and Heat Oy

      Laboratorie-, optisk- og presisjonsutstyr

      PREQUALIFICATION FOR DELIVERY OF FLOW- AND ENERGY METERS FOR THE DISTRIBUTION OF HEATING AND COOLING

      Fortum Power and Heat Oy needs flow and energy meters for the distribution of heating and cooling, including district heating and cooling calculators, flow sensors (from 1.5 up to 1000 m3/h flow rates, PN16 to PN25 nominal distribution pressure, G1” up to DN250 pipe connection), temperature sensors, auxiliary cards, communication devices/cards, and other compatible accessories. The goods are to be delivered in Helsinki-Uusimaa, Finland. This is a prequalification for a framework agreement.

      Framework agreement with qualification
      Oct 30, 2026(1 day)
    • Oy Turku Energia - Åbo Energi Ab

      Medisinsk og laboratorieutstyr

      Hybridiakun hankinta

      Oy Turku Energia - Åbo Energi Ab tarvitsee hybridiakun, joka on kaukolämpö- ja kaukojäähdytysveden varastointiin käytettävä vesisäiliö, asennuksineen ja käyttöönottoineen Varsinais-Suomeen. Hankinnan kohteena on tavara, ja sen tarkoituksena on tukea Turku Energian toimintaa yhtenä Suomen suurimmista energiayhtiöistä. Tarjoukset arvioidaan hinnan (80–90 %) ja laadun (10–20 %) perusteella. Laatuvertailu voi sisältää hankkeen toteutukseen ja riskienhallintaan liittyvän suunnitelman sekä takuuaikaan, ympäristöön tai turvallisuuteen liittyviä seikkoja.

      Competition with qualification
      Nov 9, 2026(11 days)