    KA23 Kangasala substation Static Var Compensator (SVC)

    Fingrid Oyj

    KA23 Kangasala substation Static Var Compensator (SVC)

    1. Competition notice published

      May 8, 6:55 AMMay 8, 2026 6:55 AM
    2. Questions deadline

      May 29, 9:00 AMMay 29, 2026 9:00 AM
    3. Qualification deadline

      Jun 5, 9:00 AMJune 5, 2026 9:00 AM
    4. Tender submission deadline

      Comes with the invitation

    Brief

    Finland: Tenders/Fingrid Oyj/KA23 Kangasala substation Static Var Compensator (SVC)

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    Jun 5,Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Construction workover 32 months

    Brief

    Fingrid Oyj needs construction services for the renewal of the existing Static Var Compensator (SVC) system at Kangasala substation in Kangasala, western Finland, under a turnkey contract. The project involves the partial modernization of the current SVC installation, including refurbishment of existing control and protection systems, converter valves, and valve cooling systems, as well as all demolition and new installations. The preliminary project delivery time is from December 2026 to July 2029. The procurement will follow a negotiated procedure, with a prequalification stage where candidates will be selected based on suitability requirements before being invited to submit tenders. The award criterion is the total price of the products.

    Anleggs- og infrastrukturbygging

    Register interest in Tarjouspalvelu

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      Tuotteiden yhteenlaskettu hinta

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Fingrid Oyj

    From the notice

    • Fingrid Oyj is planning to renew the existing Static Var Compensator (SVC) system at Kangasala substation under a turnkey contract. The substation is located in Kangasala in western Finland. The SVC project concerns the partial modernisation of the current SVC installation, including refurbishment of existing control and protection systems, converter valves and valve cooling system and including all demolition work and new installations. All other existing SVC components and subsystems shall either remain or be upgraded by the Client. The existing SVC installation consists of +240(cap)…-200 (ind) Mvar dynamic compensation capacity with the TCRs, TSCs and filter banks connected to 20 kV system and with a step-up transformer connected to 400 kV system, illustrated in the attached SLD and layout drawings. Preliminary intended project delivery time for Kangasala SVC renewal is from December 2026 to July 2029. The installations, testing and energization shall be carried out during the when the Kangasala SVC substation is in an outage. Period for the outage define together with Fingrid and contractor. Procurement will be done according to Finnish legislation concerning public procurements in energy sector (in particular, the Act on Public Procurement concerning Units Operating within the field of Water and Energy Service as well as Traffic and Postal Service (1398/2016)). The procurement method is a negotiated procedure. Fingrid will announce a notice in the EU Official paper for public procurement declaring prequalification stage opened and requesting interested contractors to apply for prequalification. After receiving these applications from interested companies Fingrid will select the candidates based on the selection criteria set out and invite accepted companies to submit the tenders. In the first phase of the procurement procedure, candidates are invited to submit applications for participation in the negotiated procedure. Tenderers with applications meeting all the suitability requirements will be chosen to the negotiated procedure. The negotiation process involves negotiating with the candidates on the final terms and conditions based on a preliminary tender. At the end of the negotiations, the contracting entity shall request a binding tender from all the tenderers, based on the terms defined in the final call for tender. The invitation to submit tenders will include more detailed information on the scope and contents of the contract, specifications, requirements, award criteria etc. and it will be sent only to the qualified tenderers, tentatively in May 2025. Fingrid reserves the right to reject all the tenders.

    • Contact

      Ville Haljalaville.haljala@fingrid.fi
    • Type
      Competition · Prequalification
    • Location
      Pirkanmaa
    • Main code
      Construction work
      45000000
    • 45232220Substation construction work45232221Transformer substation45259900Plant upgrade work

    Similar active competitions

    • Fingrid Oyj

      Kraftforsyning og reservestrøm

      Substation projects Qualification B 2024 -

      Fingrid's substation projects B-Qualification 2024.

      Qualification system
      Jun 30, 2027(100+ days)
    • Fingrid Oyj

      Substation projects Qualification A 2024 -

      Fingrid's substation projects A-Qualification 2024.

      Qualification system
      Jun 30, 2027(100+ days)
    • Fingrid Oyj

      Elektrisk infrastruktur og veibelysning

      Overhead transmission line projects B-Qualification 2024

      Fingrid's overhead transmission line projects B-Qualification 2024.

      Qualification system
      Oct 30, 2026(1 day)