Large Vacuum chambers for the HIMB Beamline
Cancelled
The competition has been cancelled.
- Deadline
- Jan 14,Expired
- Award
Brief
The Paul Scherrer Institut (PSI) has cancelled the procurement for large vacuum chambers for the new HIMB beamline at the PSI proton facility. The project involved the manufacturing of vacuum chambers exceeding 3m in height, 1m in width, and 2m in length, requiring internal welding for vacuum performance and a specialized cleaning process to minimize outgassing.
Result
- Reason for cancellationOther
- 0Number of tenders received
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Paul Scherrer Institut (PSI)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Award criteria
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
As part of this project, vacuum chambers for the new HIMB beamline at the PSI proton facility are to be manufactured. The fabrication of vacuum chambers with dimensions exceeding 3 m in height, 1 m in width, and 2 m in length should include internal welding in order to ensure compatibility with vacuum performance requirements. After final machining of these large vacuum chambers, a specialized cleaning process must be applied to minimize the outgassing rate. For further details, please refer to the specification document PSI-GR80-216.
Contact
publictenders@psi.ch- ResultType
- AargauLocation
- 31643000Main codeParticle accelerators
- 44615100Steel pressure vessels