Find

  • All tenders
Germany: Tenders/GSI Helmholtzzentrum für Schwerionenforschung GmbH/Low-Noise Profile Grid Cables for SEM-Grids and Multi-Wire Proportional Chambers for the FAIR Facility

Low-Noise Profile Grid Cables for SEM-Grids and Multi-Wire Proportional Chambers for the FAIR Facility

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Dec 17, 2025Expired
Award
Connectors, weight 9 and 2 more
Procedure
With negotiationTwo stages
Agreement
Buying goodsover 9 months

Brief

GSI Helmholtzzentrum für Schwerionenforschung GmbH har inngått en avtale med MIL-KABEL-SYSTEMS GmbH om å levere støysvake profilnettverkskabler for SEM-nett og multi-wire proporsjonale kamre til FAIR-anlegget i Darmstadt, Tyskland. Kontrakten har en varighet på 9 måneder og en verdi på 581 828 €. Det ble lagt vekt på kvaliteten på kontakter, bulk-kabel og produksjonsprosessen, inkludert test- og kvalitetssikringsdokumentasjon. Kun én leverandør deltok i konkurransen.

Result

TED
  • MIL-KABEL-SYSTEMS GmbH
    Winner
  • Number of tenders received
    1
  • Contract value
    €581,828

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at GSI Helmholtzzentrum für Schwerionenforschung GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Consideration of the price through the valuation method "Preis-Quotient-Methode"

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Fulfilment of connecor requirements (detailed specification, section 5.2) (50%) Quality of connector in terms of size, robustness and environmental conditions (EMI/RF shielding, RoHS) (15%) Crimp contacts are preferred over soldering (25%) Connectors with good strain relief and smooth transition to bulk cable are preferred (10%)

    Sub-criteria

    • Connector requirementsWeight 50

      Fulfilment of connecor requirements (detailed specification, section 5.2)

    • Quality of connectorWeight 15

      Quality of connector in terms of size, robustness and environmental conditions (EMI/RF shielding, RoHS)

    • Crimp contactsWeight 25

      Crimp contacts are preferred over soldering

    • Strain relief and transitionWeight 10

      Connectors with good strain relief and smooth transition to bulk cable are preferred

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Fulfillment of PG cable parameter specification (table 3 of detailed specification) with sufficient flexibility (ch. 5, "Tender PG cable") (80%) Extra credit can be collected, if specification requirements are exceeded, e.g. the copper coverage is larger than 94% or the bending radius is smaller than the stated limit. (max. 20%)

    Sub-criteria

    • PG cable parameter specificationWeight 80

      Fulfillment of PG cable parameter specification (table 3 of detailed specification) with sufficient flexibility (ch. 5, "Tender PG cable")

    • Exceeding specification requirementsWeight 20

      Extra credit can be collected, if specification requirements are exceeded, e.g. the copper coverage is larger than 94% or the bending radius is smaller than the stated limit.

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    HEBT: Technical description of manufacturing process and cable assembly (20%) SIS100: Technical description of manufacturing process including end sleeve for drag chain (20%) Selection of appropriate cable labelling (10%) Description and proposal of cable testing and QA docmentation (section 6.3 "FAT" and ch. 7), autmoated test preferred for consistency of test results (50%)

    Sub-criteria

    • HEBT manufacturing processWeight 20

      HEBT: Technical description of manufacturing process and cable assembly

    • SIS100 manufacturing processWeight 20

      SIS100: Technical description of manufacturing process including end sleeve for drag chain

    • Cable labellingWeight 10

      Selection of appropriate cable labelling

    • Cable testing and QA documentationWeight 50

      Description and proposal of cable testing and QA docmentation (section 6.3 "FAT" and ch. 7), autmoated test preferred for consistency of test results

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • At the GSI Helmholtz Centre for Heavy Ion Research, the international research facility FAIR (Facility for Antiproton and Ion Research) is under construction. The accelerator complex aims for the production of a wide spectrum of high-intensity primary ion beams for a diverse range of scientific research fields and applications. The spectrum covers proton up to Uranium beams with different energies and with time structures between 100 ns and tens of seconds.

  • Contact

    proekf32@gsi.de
  • Type
    Result · Prequalification
  • Location
    Darmstadt, Kreisfreie Stadt
  • Main code
    Cable joining kits
    31224800

Similar active competitions

  • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

    Laboratorie-, optisk- og presisjonsutstyr

    Passive Neutron Dosimeters

    FAIR – Facility for Antiproton and Ion Research in Europe GmbH needs 100 passive neutron dosimeters for environmental monitoring at its facility in Darmstadt, Germany. The award is based on price (30%) and design/manufacturing method (70%): dosimeters manufactured without adhesive receive the maximum design score, while adhesive assembly receives a lower score.

    Competition
    Dec 18, 2026(25 days)
  • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

    Compressed Air Components for FAIR

    FAIR – Facility for Antiproton and Ion Research in Europe GmbH needs compressed-air fittings and instruments for its system in Darmstadt, Germany. The supply contract has a stated duration of 1 month. Offers are evaluated on price (80%) and delivery time (20%), with faster delivery receiving a higher score; delivery within 3 weeks receives the maximum score. B.E.S.T. Fluidsysteme GmbH Frankfurt (Swagelok) won a similar 24-month framework contract for compressed-type fittings and instruments. Bidders must submit an ISO 9001 compliance self-declaration or evidence of an equivalent standard; consortium and subcontractor declarations are required where applicable.

    Competition
    Nov 24, 2026(1 day)
  • FAIR - Facility for Antiproton and Ion Research in Europe GmbH

    Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area

    FAIR – Facility for Antiproton and Ion Research in Europe GmbH needs the design, manufacture, supply, installation and testing of a vacuum-insulated liquid-nitrogen transfer system at the Super-FRS experiment area in Darmstadt, Germany. The base scope is approximately 200 m of transfer line connecting the tank area to HI/DESPEC and FHF1, with two valve boxes; an optional extension adds approximately 120 m of line and one valve box for FHF2, with provision for the extension included in the base design. The system must deliver 25 litres per minute at a nominal 77 K, maintaining at least 1.1 bara at the farthest consumer from a tank pressure of 1.3 bara. The contractor must provide thermal and hydraulic calculations, supports and thermal-contraction compensation, factory and site acceptance tests, and technical documentation; storage tanks and the valve-control system and wiring are excluded. The 1-year contract requires experience manufacturing and installing vacuum-insulated cryogenic transfer lines longer than 25 m, including comparable major construction sites, and evidence of compliance with AD 2000 and the Pressure Equipment Directive 2014/68/EU; three comparable project references are required. Offers are evaluated on price (30 points), delivery-schedule concept (28), technical design (21), and installation and execution concept (21).

    Competition
    Nov 23, 2026(0 days)