    Manufacture and Installation of Signature Points on the Royal Canal Greenway for Waterways Ireland

    Waterways Ireland_225

    Manufacture and Installation of Signature Points on the Royal Canal Greenway for Waterways Ireland

    1. Competition notice published

      Mar 13, 8:54 AMMarch 13, 2026 8:54 AM
    2. Contract signed

      Jun 19, 12:00 AMJune 19, 2026 12:00 AM
    3. Result notice published

      Jun 22, 11:46 AMJune 22, 2026 11:46 AM

    Brief

    Ireland: Tenders/Waterways Ireland_225/Manufacture and Installation of Signature Points on the Royal Canal Greenway for Waterways Ireland

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Reklame og markedsføring

    Waterways Ireland has entered into an agreement with Ascot Sign Systems for the manufacture and installation of abstract sculptural pieces, acting as prominent landmarks/signature points, at four key locations along the Royal Canal Greenway in Ireland. The contract has a duration of 6 months and a total value of 218,250 EUR. The project is funded by the Just Transition Fund and has a delivery deadline of July 31, 2026. Two bids were received for this contract.

    Result

    Winner
    Ascot Sign Systems_12283
    Number of bids
    2
    Contract value
    €218,250

    About the bid

      Waterways Ireland is in the process of implementing a Visitor Experience Development Plan for the Royal Canal Greenway, which includes a variety of interventions such as formal signage, interpretation and signature points that highlight the stories of the canal. As part of the plan the Paul Hogarth Company was engaged to design abstract sculptural pieces to be placed at four key locations along the canal. These large-scale designs are intended to act as prominent landmarks/signature points. The project is funded by the Just Transition Fund and is subject to a delivery deadline of 31st July 2026 to enable the drawdown of funds. Waterways Ireland is now seeking a supplier to fabricate deliver and install these sculptural pieces as detailed in the Specification at 3.1.

      Contact phone
      02866323004
      Contact email
      procurement@waterwaysireland.org
      Address
      2 Sligo Road, BT74 7JY Enniskillen

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Cost

    • Description

      Quality

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Waterways Ireland_225
    Title
    Manufacture and Installation of Signature Points on the Royal Canal Greenway for Waterways Ireland
    Type
    ResultPrequalification
    Main code
    22314000Designs
    Supplemental codes
    79341000Advertising services79341400Advertising campaign services79342000Marketing services79342200Promotional services
    Location
    Dublin
    Estimated value
    €218,250.00
    Duration
    6 months

    Active similar competitions

    • Office of Public Works (OPW)

      Veiskilt og trafikkutstyr

      Design, Manufacture, Supply and Delivery of Heritage Trail Signs in the Phoenix Park

      Office of Public Works (OPW) needs the design, manufacture, supply, and delivery of 50 bespoke replacement Heritage Trail signs for the Phoenix Park, Dublin, over 1 year, with a maximum total value of 1 EUR. The project also requires participation in two in-person workshop meetings on-site at the Phoenix Park with OPW staff.

      CompetitionSep 17, 2026
      Oct 16, 2026(6 days)
      €1
    • Waterways Ireland_225

      Lufttransport og ubemannede luftfartøy

      Provision of Services for Disposal of the Vessel Romaris

      Waterways Ireland needs services for the removal and appropriate disposal or onward processing of the abandoned former restaurant vessel "Romaris" from Lakeside Marina, Lower Road, Ballykeeran, Glasson, Athlone, Co Westmeath, N37X337. The contract has a maximum total value of 20,000 EUR and a duration of 6 months.

      CompetitionSep 18, 2026
      Oct 16, 2026(6 days)
      €20,000
    • Waterways Ireland_225

      Eiendomsrådgivning og megling

      Valuation Services for property and land within Phase 3 Ulster Canal

      Waterways Ireland_225 needs valuation services for property and land within Phase 3 Ulster Canal for 5 years, with a maximum total value of 300,000 EUR. The services include attending meetings with landowners, identifying affected properties, reviewing CPO schedules, determining market valuations, negotiating property acquisition, verifying injurious affection, advising on accommodation works, managing stakeholder relationships, providing valuation reports, preparing evidence for appeals, reviewing professional fees, maintaining a property transaction database, and liaising with the Land Registry. The services are to be delivered in Dublin.

      CompetitionOct 5, 2026
      Nov 4, 2026(25 days)
      €300,000
    • Kildare County Council_385

      Anleggs- og infrastrukturbygging

      Grand Canal Greenway Phase 2 For Kildare County Council

      Kildare County Council needs construction services for "Grand Canal Greenway Phase 2" for 1 year, with a maximum total value of 5,500,000 EUR. The project involves widening and resurfacing a 7km section of the greenway between Lock 20 and the Shee Bridge Boardwalk, constructing a new pedestrian bridge at the 18th Lock, improving public and private road junctions, enhancing existing underbridge crossings, and undertaking various ancillary works. The project location is Mid-East.

      CompetitionOct 5, 2026
      Nov 12, 2026(33 days)
      €5,500,000
    • Waterways Ireland_225

      Arkitekttjenester

      Estate Management Strategy

      Waterways Ireland_225 needs a comprehensive Estate Management Strategy to be completed by March 2027, with a maximum total value of 100,000 EUR over 6 months. The strategy should align the property estate with corporate objectives, ensure operational efficiency and financial sustainability, and optimize value from land and property assets, with particular emphasis on the Headquarters building. The services are to be delivered in Dublin.

      CompetitionSep 11, 2026
      Oct 9, 2026(0 days)