Manufacture and Supply of Momoplies for GOW03 and BKR03
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Jun 19, 2022Expired
- Procedure
- With negotiationTwo stages
- Agreement
- Construction work
Brief
The scope of work comprise manufacture and supply of offshore monopile foundations (monopiles for wind turbine generators (WTG MP) and a monopile for an offshore substation (OSS MP)). The monopiles are to be delivered to two individual German sites named Gode Wind by 24 MP's and Borkum Rifgrund by 83 MP's The Scope of Works is divided into four (4) lots: • Lot A1 GOW03: 23 WTG MPs • Lot A2 GOW03: 1 OSS MP • Lot B1 BKR03: 40 WTG MPs • Lot B2 BKR03: 43 WTG MPs
Civil engineering and infrastructure construction
Result
- 0Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ørsted Wind Power A/S
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The scope of work comprise manufacture and supply of offshore monopile foundations (monopiles for wind turbine generators (WTG MP) and a monopile for an offshore substation (OSS MP)). The monopiles are to be delivered to two individual German sites named Gode Wind by 24 MP's and Borkum Rifgrund by 83 MP's The Scope of Works is divided into four (4) lots: • Lot A1 GOW03: 23 WTG MPs • Lot A2 GOW03: 1 OSS MP • Lot B1 BKR03: 40 WTG MPs • Lot B2 BKR03: 43 WTG MPs
Contact
Jakob Møller Nielsenjakni@orsted.com- Result · PrequalificationType
- 45000000Main codeConstruction work
- 45223210Structural steelworks45251100Construction work for power plant45262400Structural steel erection work45262420Structural steel erection work for structures45262424Offshore-module fabrication work45262426Pile-fabrication work45262670Metalworking45262680Welding