All tenders: Denmark/Ørsted Wind Power A/S/Manufacture and Supply of Momoplies for GOW03 and BKR03

Manufacture and Supply of Momoplies for GOW03 and BKR03

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Jun 19, 2022Expired
Procedure
With negotiationTwo stages
Agreement
Construction work

Brief

The scope of work comprise manufacture and supply of offshore monopile foundations (monopiles for wind turbine generators (WTG MP) and a monopile for an offshore substation (OSS MP)). The monopiles are to be delivered to two individual German sites named Gode Wind by 24 MP's and Borkum Rifgrund by 83 MP's The Scope of Works is divided into four (4) lots: • Lot A1 GOW03: 23 WTG MPs • Lot A2 GOW03: 1 OSS MP • Lot B1 BKR03: 40 WTG MPs • Lot B2 BKR03: 43 WTG MPs

Civil engineering and infrastructure construction

Result

TED
  • Number of tenders received
    0
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Ørsted Wind Power A/S

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The scope of work comprise manufacture and supply of offshore monopile foundations (monopiles for wind turbine generators (WTG MP) and a monopile for an offshore substation (OSS MP)). The monopiles are to be delivered to two individual German sites named Gode Wind by 24 MP's and Borkum Rifgrund by 83 MP's The Scope of Works is divided into four (4) lots: • Lot A1 GOW03: 23 WTG MPs • Lot A2 GOW03: 1 OSS MP • Lot B1 BKR03: 40 WTG MPs • Lot B2 BKR03: 43 WTG MPs

  • Contact

    Jakob Møller Nielsenjakni@orsted.com
  • Type
    Result · Prequalification
  • Main code
    Construction work
    45000000
  • 45223210Structural steelworks45251100Construction work for power plant45262400Structural steel erection work45262420Structural steel erection work for structures45262424Offshore-module fabrication work45262426Pile-fabrication work45262670Metalworking45262680Welding

Similar active competitions

  • Energistyrelsen

    Electrical equipment and lighting

    North Sea I, South, Offshore Wind Farm

    Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

    Competition
    Oct 23, 2028(100+ days)
    DKK 6,600,000,000
  • Elektrownia Wiatrowa Baltica 2 SP Z O.O

    Building and Construction - Erection and Construction of Buildings

    Supplementary notice to notice 2022/S 171-485697 (Works)– Tender for Manufacture and Supply of Foundation Secondary Structures Reference number: 2022/S 171-485697 (Works)

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485697 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entity' purchases in EU tender procedures.This notice relates to the contracting entity project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for the Manufacture and Supply of Foundation Secondary Structures. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system no earlier than 21 of June 2024 using product code 4.4.23.

    Qualification system
    Jun 19, 2027(100+ days)
  • Société Luxembourgeoise des Energies Renouvelables S.A.

    9227-26 - EU-Ausschreibung Windenergieanlagen Phase 4 2027

    Die Société Luxembourgeoise des Energies Renouvelables S.A. benötigt die Planung, Herstellung, Lieferung, Errichtung, Inbetriebnahme, den Probebetrieb, die Abnahme, Dokumentation sowie Service/Wartung von dreiundzwanzig (23) Onshore-Windenergieanlagen der Multimegawattklasse, aufgeteilt in zwanzig (20) Lose. Die Anlagen sollen optimal an die örtlichen Verhältnisse in Luxemburg angepasst sein.

    Competition with qualification
    Nov 30, 2026(1 day)